FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry. Ohio 44081 December 11, 2003 PY-CEINRR-2750L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power-Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the November 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
.. 1. :., '-.,, '.-. " -I, -, ; :.., :!..,
- f I.: I ;.
4, 1: 1% ;
,/...,
-: ".. , '. : '.,
- d;.
- c
'5 I,- ,-J6-9
I OPERATING DATA REPORT UNIT:
Perry DATE:
1219/03
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: November 2003
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235
- 8.
Hours Reactor was Critical
- 9.
Hours Generator On-Line
- 10.
Unit Reserve Shutdown Hours
- 11.
Net Electrical Energy (MWeH)
This Month 720.0 720.0 0.0 ar gon n Yr-to-Date 6.597.2 6.497.0 0.0 7.618.056.0 Cumulative 111.500.7 108.767.3 0.0 124.193.267.0 vvvvv.v Page 1
I1)
A r
UNIT SHUTDOWNS REPORT MONTH - November 2003 l
DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 12/9/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective AcGon to Prevent Recurrence 1
Hours 2 1 3
l I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~I
SUMMARY
The Perry Plant was on line the entire month of November.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training Ucense Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
If
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other i
i III II II Page 2