ML033510792

From kanterella
Jump to navigation Jump to search
November 2003 Monthly Operating Report for Monticello
ML033510792
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/12/2003
From: Thomas J. Palmisano
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-MT-03-093
Download: ML033510792 (4)


Text

Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-MT-03-093 December 12, 2003 Technical Specification 6.7.A.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 License No. DPR-22 Monticello Monthly Operating Report - November 2003 In accordance with Monticello Technical Specification 6.7.A.3, the operating statistics report for Monticello Nuclear Generating Plant for the month of November is attached.

Please contact John Fields at 763-271-1663 if you require further information.

Thomas J. Palmisano Site Vice President, Monticello Nuclear Generating Plant Nuclear Management Company, LLC Enclosure cc:

Administrator, Region III, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC Minnesota Department of Commerce 2807 West County Road 75

  • Monticello, Minnesota 55362-9637 Telephone: 763-295-5151
  • Fax: 763-295-1454

ENCLOSURE MONTICELLO OPERATING DATA REPORT AND UNIT SHUTDOWNS NOVEMBER 2003 2 pages follow

DOCKET NO. 50-263 UNIT NAME Monticello DATE December 2, 2003 COMPLETED BY J. I. Helland TELEPHONE 763-295-1333 OPERATING DATA REPORT REPORTING PERIOD: November 2003

1. Design Electrical Rating (MWe-Net) 600.0
2. Maximum Dependable Capacity (MWe-Net) 578.1 MONTH YEAR TO DATE CUMULATIVE
3. Number of Hours the Reactor Was Critical 720.0 7,286.8 236,128.5
4. Number of Hours the Generator Was On Line 720.0 7,225.7 232,644.5
5. Unit Reserve Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWHe) 424,869 4,154,648 120,320,191

UNIT SHUTDOWNS DOCKET NO.

50-263 Monticello UNIT NAME DATE 12 03 COMPLETED BY J. I. Helland REPORTING PERIOD:

November 2003 TELEPHONE 763-295-1333 No.

(Year

- to -

date)

Date Type F:Forced S:Scheduled Duration (hours)

Reason (1)

Method of Shutting Down (2)

Cause/Corrective Actions Comments None 1

F 2

Reason:

Method:

A Equipment Failure (Explain) 1 Manual B

Maintenance or Test 2

Manual Scram C

Refueling 3

Automatic Trip/Scram D

Regulator Restriction 4

Continuation E

Operator Training & Licensing Examination e

5 Other (Explain)

Administrativ G

Operational Error (Explain)

H Other (Explain)

SUMMARY

The plant operated at essentially 100% power for the month of November except for 2 planned thermal power reductions. The first was a slight power reduction for about 11 minutes on November 5th for a planned single rod scram. The second was a power reduction to around 98% for about 30 minutes on November 20th for a control rod pattern adjustment.