November 2003 Monthly Operating Report for South Texas Project, Units 1 and 2
ML033510557
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/11/2003
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-03001641, STI: 31677844
Download: ML033510557 (14)


Text

Nuclear Operating Company December 11, 2003 NOC-AE-03001641 File No.: G02 10CFR50.71 STI: 31677844 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for November, 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for November 2003.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - November 2003

2)

STPEGS Unit 2 Monthly Operating Report - November 2003

cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP, L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT NOVEMBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50498 LICENSE NO. NPF-76 Approved By:

r

/

/

E.D. AALPIN Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT I

DATE Dec. 3. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 11/1/03-11/30103 GROSS HOURS IN REPORTING PERIOD: 720

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mxvt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE

5.

NUMBER OF HOURS REACTOR CRITICAL

6.

REACTOR RESERVE SHUTDOWN HOURS

7.

HOURS GENERATOR ON LINE

8.

UNIT RESERVE SHUTDOWN HOURS

9.

GROSS THERMAL ENERGY GENERATED (MWH)

10.

NET ELECTRICAL ENERGY GENERATED (MWH)

11.

REACTOR SERVICE FACTOR (em)

12.

REACTOR AVAILABILITY FACTOR (%)

13.

UNIT SERVICE FACTOR (%)

14.

UNIT AVAILABILITY FACTOR (%)

15.

UNIT CAPACITY FACTOR - Using MDC (%)

16.

UNIT CAPACITY FACTOR - Using DER (%)

17.

UNIT FORCED OUTAGE RATE (%)

720.0 0

720.0 0

227412919 926.350 100.0 100.0 100.0 100.0 102.9 102.9 0.0 4.742.4 0

4,690.4 0

17 608,615 5,898.939 59.2 59.2 58.5 58.5 58.8 58.8 36.6 103.271.5 0

101.583.5 0

379.559.078 124,114,994 77.2 77.2 75.9 75.9 74.2 74.2 14.8 18.

19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): NIA IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50498 UNIT I

DATE Dec. 3 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 1288 2

1289 3

1288 4

1288 5

1288 6

1289 7

1289 8

1289 9

1290 10 1289 11 1289 12 1289 13 1289 14 1289 15 1211 16 1271 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL (MWe-Net) 1286 1290 1293 1293 1291 1290 1289 1292 1292 1289 1290 1293 1295 1292

UNIT SHUTDOWNS AND POWVER REDUCTIONS DOCKET NO.

50-498 UNIT I

DATE Dec.3.2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

I I

I I

I 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT NOVEMBER 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By:

1674!

E.D. HWIN Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50499 UNIT 2

DATE Dec. 3, 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: I1l//03-11/30/03 GROSS HOURS IN REPORTING PERIOD: 720

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%)

UNIT CAPACITY FACTOR - Using DER (%)

UNIT FORCED OUTAGE RATE (as)

THIS MONTH 720.0 0

720.0 0

2.729.644 911.232 100.0 100.0 100.0 100.0 101.2 101.2 0.0 YR TO DATE 6.402.7 0

6,369.1 0

24.099.317 7.976,208 79.9 79.9 79.5 79.5 79.6 79.6 20.5 CUMULATIVE 100.960.4 0

98.661.5 0

368.512.967 120.154,175 79.7 79.7 77.9 77.9 75.8 75.8 14.0

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Dec.3 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1275 1279 1274 1274 1273 1251 1102 1199 1278 1273 1265 1267 1268 1274 1269 1276 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1274 18 1275 19 1275 20 1277 21 1276 22 1276 23 1276 24 1277 25 1278 26 1277 27 1277 28 1279 29 1279 30 1278

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Dec. 3. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report #

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I_

I I

I I

I I

II I

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.