ML033510537

From kanterella
Jump to navigation Jump to search
EP-PS-104, Radiation Protection Coordinator (Rpc).
ML033510537
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/05/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
28401 EP-PS-104, Rev 17
Download: ML033510537 (4)


Text

~

i 8Dec. 05, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-57753 USER %NRAL  %

ON:sr LACH* SE M EMPL#:28401 CA#: 0363 Addr NUCSA2 Phone#

TRANSMITTAL INFORMATION:

TO: '* C'_ 12/05/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)

\,/HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

104 - 104 - RADIATION PROTECTION COORDINATOR (RPC):

EMERGENCY PLSN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 12/04/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-104 REPLACE: REV:17 REPLACE: REV:17

-nihOE rCAr 233 3-1G40- lI2v. A~s/)4e o/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

V ;t

. 1%

.. -t Tab 10 EP-PS-1 04-1 0 PERSONNEL ACCOUNTABILITY (As defined in SP-00-309, Personnel Accountability)

ACCOUNTABILITY READER LOCATIONS SITE BUILDING READER LOCATION Service & Administration Building - North S&A Cafeteria S&A Large Conference Room 2nd Floor Effluents Management Meeting Area

_ ____ Facilities Management Meeting Area Warehouse Facility Large Conference Room 2nd Floor South Building - Two Story First Floor Main Hallway - East Doorway Main Hallway - West Doorway Main Hallway - Center Second Floor Main Hallway - North Exit Main Hallway - South Exit Main Hallway - West Exit South Building -Three Story First Floor North End Near Elevator South End Near Doorway-to Maintenance Center Hallway Second Floor North End Near Elevator South End Near West Stairway Third Floor North End Near Elevator South End Near West Stairway EP-AD-000-445, Revision 9, Page 1 of 3

Tab 10 EP-PS-1 04-1 0 PERSONNEL ACCOUNTABILITY AREAS AND LEADER ASSIGNMENTS Accountability Area Accountability Designator Accountability Area Work Groups Area Leader ACCOUNTABILITY S&A Building - All Personnel located PRIMARY: Industrial AREA A Cafeteria in S&A Building Safety Supervisor ETN 254-1624 All floors except those noted in Assembly Area B ACCOUNTABILITY Effluents Management Effluents Management PRIMARY: Effluents AREA B Meeting Area Facilities Management Mgmt. Supervisor ETN 254-1644 Chemistry Admin ISI-ISD ACCOUNTABILITY Warehouse Large Procurement PRIMARY: Mgr.-Nuc AREA C Conference Room Procurement ETN 254-3960 ACCOUNTABILITY Electrical Maintenance All Personnel located PRIMARY:

AREA D I&C Shop in the Two Story Production 1st Floor Two Story South Building Supervisor I&C South Building ETN 254-3713 ACCOUNTABILITY Cafeteria All Personnel located PRIMARY:

AREA E Conference Room on the 1st Floor of the Production 1 st Floor Three Story Three Story Supervisor South Building South Building Maintenance ETN 254-1685 ACCOUNTABILITY Conference Room 211 All Personnel located PRIMARY:

AREA F 2nd Floor of the Three on the 2nd and 3d Radiation Protection Story South Building Floor of the Three Manager ETN 254-1211 Story South Building ACCOUNTABILITY Technical Support All Personnel PRIMARY: TSC AREA G Center Responding to Fill Administrative Control Structure Emergency Plan Coordinator Elevation 741 Positions in the TSC ETN 254-3045 EP-AD-000-445, Revision 9, Page 2 of 3

-1 '; "I . . I C

Tab 10 EP-PS-1 04-1 0 ACCOUNTABILITY ROSTER ACCOUNTABILITY AREA: DATE: / /

ACCOUNTABILITY AREA LEADER:

Name (Last, First) Badge # Name (Last, First) Badge #

_ _ _ _ _ _ _~~ _~~~ I I __

a- '- I I- B~~ 1-

4. = 4.
4. m 4.
4. - 4.

4- a-a- m. a-

. .'.I I I I~~~~~~~~~~~~~

INSTRUCTIONS:

1. The Accountability Area Leader will direct all personnel in the assembly area to complete this roster in the event the Accountability Card Reader system is inoperable.
2. On-site Personnel will print their name and SSES badge number in the areas provided on this form.
3. After completion, notify Security and follow their direction to forward the rosters.

EP-AD-000-445, Revision 9, Page 3 of 3