MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] |
Text
- ~
i 8Dec. 05, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-57753 USER %NRAL %
ON:sr LACH* SE M EMPL#:28401 CA#: 0363 Addr NUCSA2 Phone#
TRANSMITTAL INFORMATION:
TO: '* C'_ 12/05/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
\,/HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
104 - 104 - RADIATION PROTECTION COORDINATOR (RPC):
EMERGENCY PLSN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 11/12/2003 ADD MANUAL TABLE OF CONTENTS DATE: 12/04/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-104 REPLACE: REV:17 REPLACE: REV:17
-nihOE rCAr 233 3-1G40- lI2v. A~s/)4e o/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
V ;t
. 1%
.. -t Tab 10 EP-PS-1 04-1 0 PERSONNEL ACCOUNTABILITY (As defined in SP-00-309, Personnel Accountability)
ACCOUNTABILITY READER LOCATIONS SITE BUILDING READER LOCATION Service & Administration Building - North S&A Cafeteria S&A Large Conference Room 2nd Floor Effluents Management Meeting Area
_ ____ Facilities Management Meeting Area Warehouse Facility Large Conference Room 2nd Floor South Building - Two Story First Floor Main Hallway - East Doorway Main Hallway - West Doorway Main Hallway - Center Second Floor Main Hallway - North Exit Main Hallway - South Exit Main Hallway - West Exit South Building -Three Story First Floor North End Near Elevator South End Near Doorway-to Maintenance Center Hallway Second Floor North End Near Elevator South End Near West Stairway Third Floor North End Near Elevator South End Near West Stairway EP-AD-000-445, Revision 9, Page 1 of 3
Tab 10 EP-PS-1 04-1 0 PERSONNEL ACCOUNTABILITY AREAS AND LEADER ASSIGNMENTS Accountability Area Accountability Designator Accountability Area Work Groups Area Leader ACCOUNTABILITY S&A Building - All Personnel located PRIMARY: Industrial AREA A Cafeteria in S&A Building Safety Supervisor ETN 254-1624 All floors except those noted in Assembly Area B ACCOUNTABILITY Effluents Management Effluents Management PRIMARY: Effluents AREA B Meeting Area Facilities Management Mgmt. Supervisor ETN 254-1644 Chemistry Admin ISI-ISD ACCOUNTABILITY Warehouse Large Procurement PRIMARY: Mgr.-Nuc AREA C Conference Room Procurement ETN 254-3960 ACCOUNTABILITY Electrical Maintenance All Personnel located PRIMARY:
AREA D I&C Shop in the Two Story Production 1st Floor Two Story South Building Supervisor I&C South Building ETN 254-3713 ACCOUNTABILITY Cafeteria All Personnel located PRIMARY:
AREA E Conference Room on the 1st Floor of the Production 1 st Floor Three Story Three Story Supervisor South Building South Building Maintenance ETN 254-1685 ACCOUNTABILITY Conference Room 211 All Personnel located PRIMARY:
AREA F 2nd Floor of the Three on the 2nd and 3d Radiation Protection Story South Building Floor of the Three Manager ETN 254-1211 Story South Building ACCOUNTABILITY Technical Support All Personnel PRIMARY: TSC AREA G Center Responding to Fill Administrative Control Structure Emergency Plan Coordinator Elevation 741 Positions in the TSC ETN 254-3045 EP-AD-000-445, Revision 9, Page 2 of 3
-1 '; "I . . I C
Tab 10 EP-PS-1 04-1 0 ACCOUNTABILITY ROSTER ACCOUNTABILITY AREA: DATE: / /
ACCOUNTABILITY AREA LEADER:
Name (Last, First) Badge # Name (Last, First) Badge #
_ _ _ _ _ _ _~~ _~~~ I I __
a- '- I I- B~~ 1-
- 4. = 4.
- 4. m 4.
- 4. - 4.
4- a-a- m. a-
. .'.I I I I~~~~~~~~~~~~~
INSTRUCTIONS:
- 1. The Accountability Area Leader will direct all personnel in the assembly area to complete this roster in the event the Accountability Card Reader system is inoperable.
- 2. On-site Personnel will print their name and SSES badge number in the areas provided on this form.
- 3. After completion, notify Security and follow their direction to forward the rosters.
EP-AD-000-445, Revision 9, Page 3 of 3