December 5, 2003 LICENSEE:
STP Nuclear Operating Company FACILITY:
South Texas Project Electric Generating Station (STP), Units 1 and 2
SUBJECT:
SUMMARY
OF A NOVEMBER 18, 2003, PUBLIC MEETING WITH STP NUCLEAR OPERATING COMPANY (STPNOC) ON RISK-INFORMED INSERVICE TESTING (RI-IST) ISSUES On November 18, 2003, the U.S. Nuclear Regulatory Commission (NRC) staff held a meeting at the NRC Headquarters, Room 0-9B6, One White Flint North, Rockville, Maryland, with representatives from STPNOC (the licensee) to discuss issues related to the RI-IST for South Texas Project Electric Generating Station (STP), Units 1 and 2. Pursuant to the Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), dated May 28, 2002, the meeting was open to the public for observation and opportunity to communicate with the NRC staff following the business portion of the meeting. The meeting notice was published on November 3, 2003. The list of meeting attendees is included as. The presentation slides used by the licensee are accessible in the Agencywide Documents Access and Management System (ADAMS) under ADAMS accession number ML033370415 and are included as Enclosure 2. During the meeting, the licensee pointed out an error on Page 50 of Enclosure 2; the text should read, The program follows the SONGS
[San Onofre Nuclear Generating Station] approach for high and medium risk SSCs [structures, systems and components] remaining in scope of the IST program.
The NRC staff noted that the purpose of the meeting was to discuss potential issues associated with the upcoming STPNOC submittal of the RI-IST for STP, Units 1 and 2. STPNOC indicated that the RI-IST program was important in order to effectively focus personnel and resources on important areas. Much of the meeting discussion focused on equipment which the Graded Quality Assurance ranking had been high and the RI-IST ranking had been low; prior to the meeting, the NRC had requested that the licensee be prepared to discuss a number of these examples. Pages 21 to 36 in Enclosure 2 contains summary material concerning the subject equipment. The licensee explained in detail, and answered questions from the NRC staff, concerning why a disparity in safety ranking could occur. The NRC staff concluded that additional information concerning safety-ranking disparities would be needed.
The NRC suggested that prior to submittal of the STP, Units 1 and 2 RI-IST, the licensee should submit topical information concerning the various safety ranking methodologies and other key information. NRC staff review of the topical information would further improve the NRC staffs understanding of the licensees RI-IST approach.
/RA/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos: 50-498 and 50-499
Enclosures:
- 1. List of Attendees
- 2. Licensees Presentation Material cc w/encls: See next page The NRC suggested that prior to submittal of the STP, Units 1 and 2 RI-ISI, the licensee should submit topical information concerning the various safety ranking methodologies and other key information. NRC staff review of the topical information would further improve the NRC staffs understanding of the licensees RI-ISI approach.
/RA/
David H. Jaffe, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos: 50-498 and 50-499
Enclosures:
- 1. List of Attendees
- 2. Licensees Presentation Material cc w/encls: See next page DISTRIBUTION:
PUBLIC RidsNrrDlpmLpdiv1 (RGramm) ABoland EDO/RIV Plants PDIV-1 Reading RidsNrrLAMMcAllister RidsRgn4MailCenter (AHowell)
RidsNrrPMDJaffe TMensah DTerao RidsOgcRp DFischer RidsAcrsAcnwMailCenter DHarrison RidsNrrDlpm (TMarsh/ELeeds)
RidsNrrDlpmLpdiv1 (HBerkow)
Accession Number ML033450033 OFFICE PM:PDIV-1 LA:PDIV-1 SC:PDIV-1 NAME DJaffe MMcAllister RGramm DATE 12/4/03 12/4/03 12/4/03 OFFICIAL RECORD COPY Document Name: G:\\PDIV-1\\South Texas\\Mtg.Summary 11-18-03.wpd LIST OF ATTENDEES NAME ORGANIZATION S. Head STPNOC G. Schinzel STPNOC B. Scott STPNOC D. Stillwell STPNOC D. Fischer NRR R. Gramm NRR D. Harrison NRR D. Jaffe NRR T. Scarbrough NRR D. Terao NRR
May 2003 South Texas Project, Units 1 & 2 cc:
Mr. Cornelius F. OKeefe Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. L. K. Blaylock Mr. W. C. Gunst City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/A. C. Bakken AEP Texas Central Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Texas Genco, LP P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. T. J. Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing Nuclear Quality & Licensing Department STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, TX 78205 Arthur C. Tate, Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
South Texas Project, Units 1 & 2 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483