MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] |
Text
I C:\WINDOWS\TEMP\GW)00001.TMP --------- - Pagie Paae 1 1 11-..
I C:\WINDOWS\TEMP\GWIOOOO1 .TMP Mail Envelope Properties (3F9FDC2B.8B7: 23: 39095)
Subject:
Fwd: RI-IST Files to be Forwarded to the NRC Creation Date: 10/29/03 10:24AM From: "Scott Head" <smhead@stpegs.com>
Created By: smhead @ stpegs.com Recipients nrc.gov owf4_po.0WFNDO DHJ (David Jaffe)
Post Office Route owf4_po.0WFNDO nrc.gov Files Size Date & Time MESSAGE 14 10/29/03 10:24AM Mail Mime.822 76336 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
P d Jaffe - Fwd: RI-IST Files to be Forwarded to the NRC DaI Page- 1 From: 'Scott Head" <smhead @stpegs.com>
To: <Dhj~nrc.gov>
Date: 10/29/03 10:26AM
Subject:
Fwd: RI-IST Files to be Forwarded to the NRC As promised.
I David Jaffe - RI-IST Files to be Forwarded to the NRC Page 1 I From: 'Glen Schinzel <geschinzel@stpegs.com>
To: 'Scott Head" <smhead~stpegs.com>
Date: 10/29/03 8:33AM
Subject:
RI-IST Files to be Forwarded to the NRC Scott, here are the files to be forwarded to the NRC to support an RI-IST phone call on Thursday.
Glen CC: 'Bradley Scott <bjscott~stpegs.com>, "Carl Grantom" <crgrantom~stpegs.com>,
"Daniel Stillwell" <dwstillwell @stpegs.com>, "Mark McBurnett <mamcburnett @stpegs.com>, "Michael Berg" <mjberg@stpegs.com>, 'Philip Walker' <plwalker@stpegs.com>
STP's Approach for a Future RI-IST Resubmittal
- Treatment of RAW common cause adjusted
- RI-IST process will only be applied to those components remaining within the scope of IST following application of the Exemption allowances
- RI-IST will not affect the GQA categorization results nor the scope of components subjected to IST controls
- RI-IST 'High' SSCs continue to receive full treatment
- RI-IST 'Low/High' SSCs can have intervals between tests extended as long as compensatory measures are put in place
- RI-IST 'Low' SSCs can have intervals extended up to a 6 year periodicity
- Determine if terminology of 'High, Low/High, Low' can be changed to something like 'IST Treatment Category 1, 2, 3'
- IST-scoped AOVs will follow JOG AOV recommendations (same as SONGS approach)
- RI-IST proposed testing strategies will be generated by a RI-IST Working Group, and approved by the Comprehensive Risk Management Expert Panel (same Panel that reviews and approves the GQA categorization results)
- While some RP-1ST treatment categories may initially appear inconsistent with GQA categorization results, the RI-IST treatment categories focus on defining required inservice testing only
- RI-IST component examples will be used to demonstrate how an RI-IST treatment category compares to the GQA categorization
Low Head Safety Injection Pump 1A Discharge MOV - 2N121XSIO018A GOA Rank: Medium Basis: Supports the following system functions
- High risk: Injection and Cold leg recirc modes
- Medium risk: Hot leg recirc mode
- Low risk: Pressure boundary and Containment Isolation GQA ranked Medium based on:
- Initial PRA rank of Medium (recently lowered to Low)
- Valve is normally open and stays open (i.e., passive) to support the High-risk functions.
Transfer closed is not a credible failure.
- Valve is closed to isolate RHR from the LHSI pump when RHR is used for long-term accident recovery. Failure to close mitigated by the inside containment check valve.
RI-IST Treatment: Low Basis: Valve is normally open which satisfies its safety function The 'remain open' function is considered passive IST testable function is to 'close on demand' RI-IST Treatment of Low based on:
- F-V value of 4.3E-4 and a RAW value of 1.2
- Valve is normally in it's required safety position - no change of state required
- Redundancy exists with three 100% safety trains to satisfy the injection modes
- Diversity exists with 3 High Head pumps to support recirculation and injection
- Valve is routinely monitored by other means to check valve position and flow
==
Conclusion:==
The GQA categorization process initially determines the risk of system functions, and then determines the risk of individual components that support these functions. The RI-IST process focuses directly on IST-scoped components and determines their specific importance. The GQA approach introduces additional conservatisms into the categorization process since all components in a given system are assessed. In addition, the GQA Working Group deterministically ranked this component as Medium risk based on its support of High-ranked functions.
Low Head Safety Injection Pump 1A - 2N121NPA102A GOA Rank: High Basis: Supports the following system functions
- High risk: Injection and Cold leg recirc modes
- Medium risk: Hot leg recirc mode
- Low risk: Pressure boundary and positive RCS volume control GQA ranked High based on:
- Initial PRA rank of High (recently lowered to Medium*)
- Supports High risk functions
- No credit taken for redundancy RI-IST Treatment: Low Basis: Active function to 'start and run' to support injection and recirculation functions RI-IST Treatment of Low based on:
- F-V value of 7.78E-4 and a RAW value of 1.2
- Redundancy exists with three 100% safety trains to satisfy the injection modes
- Diversity exists with 3 High Head pumps to support recirculation and injection
==
Conclusion:==
The GQA categorization process initially determines the risk of system functions, and then determines the risk of individual components that support these functions. The RI-IST process focuses directly on IST-scoped components and determines their specific importance. The GQA approach introduces additional conservatisms into the categorization process since all components in a given system are assessed. Also, the GQA process conservatively addresses RAW common cause, whereas the RI-IST process addresses common cause using the SONGS template. In addition, the GQA Working Group deterministically ranked this component as High risk based on its support of High-ranked functions with no credit taken for redundancy.
RESIDUAL HEAT REMOVAL SYSTEM REDUNDANT 3-TRAIN rn~
i 0 RHR M RECIRC 0 LHSI ED ACC. SI O HHSI FIGURE 1