MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] |
Text
I CAW1ND0WS\TEMP\GW100001.TMP Pagqe Paqe. 1 1 -S I C._._.A.. ..i... .A
.\WINDOWS..\TE..MP_.\G..WIOOOO1..-...
.,...TMP.... ....
.'... 1.-'_"'I''-
Mail Envelope Properties (3F96D502.8E5: 21: 21114)
Subject:
Fwd: RAI relating to STP -Loss of Power amendment Creation Date: 10/22/03 3:05PM From: David Jaffe Created By: DHJ@nrc.gov Recipients Action Date & Time stpegs.com Transferred 10/22/03 03:05PM awharrison (awharrison@stpegs.com)
Post Office Delivered Route stpegs.com Files Size Date & Time Mail MESSAGE 522 10/22/03 03:05PM Options Auto Delete: No Expiration Date: None Notify Recipients: No Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
Dai afe - Fwd: RAI relating to S§TP -Loss of Power amendment Pg From: David Jaffe To: awharrison @stpegs.com Date: 10122/03 3:05PM
Subject:
Fwd: RAI relating to STP -Loss of Power amendment Please call me. Thanks
I David Jaffe - RAI relating to STP -Loss of Power amendment Page 1 1 I -Loss Jaffe David - RAI of Power toSTP amendment relating Page 1~~~
From: John Knox To: Minns, John Date: 10/16/03 4:18PM
Subject:
RAI relating to STP -Loss of Power amendment Proposed questions are attached. Formal responses are needed to complete the SE.
In our review of a similar amendment request relating to loss of power instrumentation at Millstone, Ronaldo Jenkins raised a concern relating to the appropriateness of declaring the DG inoperable when the loss of power instrumentation is inoperable. There is nothing wrong with the DG; thus, it is inappropriate to declare the DG inoperable.
>>> David Jaffe 10/15/03 02:33PM >>>>
Section 2.0 ends with Table 1. Section 3.0 is "Background" but the forgot the "3.0,'. OK?
>>> John Knox 10/1 5/03 01:1 OPM>>>>
In regard to STP's letter dated September 22, 2003 (Ref :NOC-AE-03001 578) relating to proposed change to loss of power instrumentation TS, attachment 1 is missing part of sections 2.0 and 3.0. I do not need this information to write the rejection SE. It is already written and you have the SE, but we should have their complete submittal. Currently, Additional questions are being prepared based on information in their new submittal.
>>> John Minns 10/15/03 09:34AM >>>>
Please note that J Knox has informed me that the STP Loss of Power amendments will required an additional Tacs. Th licensee has submitted two different documents for the loss of power amendment.
Thanks John CC: ~~Jaffe, David; Jenkins, Ronaldo CC:
3 I David Jaffe - Question-r)hase2.wpd 1 Pacie111 Paae I David Jaffe Question-Dhase2.wDd
- 1. Response to question 1 (attachment 4) states "...the loss of power instrumentation relays perform a support function for the sequencer only for its functions to start and/or load its associated standby diesel generator (SDG) for those events involving a loss of off-site power. With the loss of power relays inoperable, the sequencer is still able to perform its function to sequence on safety injection loads for accidents not involving a loss of off-site power." With no loss of off-site power and with inoperable loss of power instrumentation (that is the loss of power instrumentation has failed such that it is doing its support function of sending a signal to start and load the DG), explain how the sequencer is still able to perform its function to sequence on safety injection loads for accidents not involving a loss of off-site power.
- 2. Response to question 1 (attachment 4) states "STPNOC's position is that the sequencer does not perform a support function for the offsite power." Pursuant with this position, provide a description of the analysis and its results demonstrating the offsite system is in compliance with the requirements of Criterion 17 of 10 CFR Part 50, Appendix A, without the support of the sequencer. Provide the description of the analysis and its results using applicable marked up FSAR pages.
- 3. The TS amendment request states that one channel of loss of power instrumentation has been removed from the scope of the Technical Specifications. Provide the basis and justification for this removal of one channel from Technical Specification pursuant to Criteria 1, 2, 3, and 4 of 10 CFR 50.36(c)(2)(ii).
- 4. Response to question 2 (attachment 4) states: "Even though the capability to trip the supply breaker is lost during a degraded or loss of voltage event due to an inoperable sequencer, the power distribution system is not inoperable as long as adequate voltage is supplied from the offsite system." Provide a description of the analysis and its results demonstrating that the power distribution system is in compliance with the requirements of Criterion 17 of 10 CFR Part 50, Appendix A, even though the capability to trip the supply breaker is lost during a degraded or loss of voltage event due to an inoperable sequencer. Provide the description of the analysis and its results using applicable marked up FSAR pages.
- 5. The TS amendment request indicates that the loss of power relays perform a support function for the sequencer only for its functions to start and/or load its associated standby diesel generator (SDG) for those event involving a loss of off-site power.
STPNOC considers opening of the offsite power supply breaker to be a function the sequencer performs as part of its function to start and load its associated SDG.
Inoperable loss of power instrumentation cause the sequencer and the offsite supply breaker to be inoperable; however, the ultimate effect of inoperable loss of power instrumentation is that the associated standby diesel generator will not load and is therefore inoperable. When loss of power instrumentation is inoperable, current TS cover the inoperable DG as well as the sequencer and offsite supply breaker. The proposed TS limits itself to an inoperable DG for the case when loss of power instrumentation is inoperable. The proposed TS does not cover the inoperable sequencer and offsite supply breaker. Provide the basis and justification for this removal of the sequencer and offsite supply breaker from Technical Specification pursuant to Criteria 1, 2, 3, and 4 of 10 CFR 50.36(c)(2)(ii) for when loss of power instrumentation is inoperable.