Revised Notice of Significant Licensee Meeting with First Energy Nuclear Operating Co Re Preliminary White Inspection Finding
ML033381038
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/04/2003
From: Ring M
NRC/RGN-III/DRP/RPB1
To:
References
EA-03-197
Download: ML033381038 (2)


Text

REVISED REVISED REVISED December 04, 2003 THIS IS A REVISED NOTICE NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE EA-03-197 Name of Licensee:

First Energy Nuclear Operating Co.

Name of Facility:

Perry Nuclear Plant, Unit 1 Docket No:

50-440 Date and Time of Meeting:

Wednesday, December 17, 2003, from 2:00 p.m. - 5:00 p.m. CDT Location of Meeting:

U. S. Nuclear Regulatory Commission Region III Office Suite 255 801 Warrenville Road Lisle, Illinois 60532 Purpose of Meeting:

The meeting is a Regulatory Conference to obtain the licensees perspective on the significance of a preliminary White inspection finding related to the failure to implement adequate procedures for the Division I emergency service water (ESW) pump reassembly.

The finding is also an apparent violation and is being considered for escalated enforcement action. The preliminary White inspection finding is discussed in Inspection Report 50-440/03-06(DRP) issued on October 30, 2003 (ADAMS Accession No. ml033040217).

Category:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

G. Grant, Deputy Regional Administrator S. Reynolds, Acting Division Director, Division of Reactor Projects M. Ring, Chief, Branch 1, Division of Reactor Projects Others as designated

REVISED REVISED REVISED Notice of Significant Licensee Meeting Licensee Attendees:

B. Kanda, Vice President T. Rausch, Plant Manager T. Lentz, Director, Nuclear Engineering K. Cimmorelli, Maintenance Manager L. McGuire, Supervisor, Design Engineering V. Higaki, Manager, Nuclear Regulatory Affairs Others as designated NOTE:

Attendance at this meeting by NRC personnel should be made known to Mark Ring via e-mail (MAR@nrc.gov) or by telephone ((630) 829-9703) by COB on December 12, 2003.

Approved by: ____/RA__________________

Mark A. Ring, Chief Branch 1 Division of Reactor Projects

REVISED REVISED REVISED Notice of Significant Licensee Meeting Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR D. Weaver (DWW), Region III Coordinator, OEDO W. Ruland (WHR), Project Directorate, Division of Licensing and Project Management, NRR S. Sands, Project Manager, Project Directorate, Division of Licensing Project Management, NRR F. Congel (FJC), Director, OE J. Dixon-Herrity (JLD), OE OEMAIL OEWEB S. Reynolds (SAR1), Acting Director, Division of Reactor Projects, RIII P. Hiland (PLH), Acting Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, RDL, KXR)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA