ML033380905
| ML033380905 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/04/2003 |
| From: | Ring M NRC/RGN-III/DRP/RPB1 |
| To: | Kanda W FirstEnergy Nuclear Operating Co |
| References | |
| IR-03-006 | |
| Download: ML033380905 (5) | |
Text
December 4, 2003 EA-03-197 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081
SUBJECT:
REGULATORY CONFERENCE TO DISCUSS PRELIMINARY WHITE INSPECTION FINDING AT THE PERRY NUCLEAR PLANT (INSPECTION REPORT 50-440/03-06(DRP)
Dear Mr. Kanda:
This letter confirms the discussion between members of our staffs to have a Regulatory Conference at 2:00 p.m. on December 17, 2003, at the U.S. Nuclear Regulatory Commission Region III office at 801 Warrenville Road, Suite 255, in Lisle, Illinois. The Conference is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.
The purpose of the Regulatory Conference is for you to provide your perspective on the significance of the preliminary White inspection finding related to the failure to implement adequate procedures for the Division I emergency service water (ESW) pump. The preliminary White inspection finding is discussed in Inspection Report 50-440/03-06(DRP), issued on October 30, 2003.
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 See Attached Distribution
DOCUMENT NAME: G:\\ML033380905.wpd (See previous concurrence)
To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII
- RIII
- RIII RIII RIII NAME RLerch for LRamadan/trn KLambert for BClayton MRing DATE 12/02/03 12/02/03 12/04/03 OFFICIAL RECORD COPY
W. Kanda cc w/encl:
G. Leidich, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
W. Kanda ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1