November 28, 2003 EA-02-031 EA-03-057 EA-03-059 Mr. Alfred J. Cayia Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

PUBLIC MEETING TO DISCUSS THE RESULTS OF THE NRC INSPECTION PROCEDURE 95003 SUPPLEMENTAL INSPECTION AT THE POINT BEACH NUCLEAR PLANT

Dear Mr. Cayia:

This letter confirms the discussion between Mr. Mike Kunowski of the NRC staff and Ms. Fritzie Flentje of the Nuclear Management Company to have a meeting at 6:30 p.m. (CST) on Tuesday, December 16, 2003, at the Holiday Inn, 4601 Calumet Avenue, in Manitowoc, Wisconsin.

From July 28 to October 3, 2003, the NRC conducted an inspection in accordance with NRC Inspection Procedure (IP) 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input.

The inspection was conducted to review your corrective actions for the Red inspection finding associated with the auxiliary feedwater system. Details of this finding were provided in Inspection Reports 50-266/01-17(DRS); 50-301/01-17(DRS), dated April 3, 2002, and 50-266/02-15(DRP); 50-301/02-15(DRP), dated April 2, 2003. In addition, the IP 95003 supplemental inspection also took a diagnostic look at your corrective action, emergency preparedness, and engineering programs.

The purpose of the meeting is for the NRC to discuss the results of the IP 95003 supplemental inspection. The meeting is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.

A. Cayia If you have any questions regarding this meeting, please contact me at (630) 829-9620.

Sincerely,

/RA/

Anton Vegel, Chief Branch 7 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:

R. Kuester, President and Chief Executive Officer, We Generation John Paul Cowan, Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager Jonathan Rogoff, Esquire General Counsel D. Cooper, Senior Vice-President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission J. Kitsembel, Electric Division Wisconsin Public Service Commission State Liaison Officer D. Markwardt, Manitowac County Board Chairman N. Crowley, Director, Manitowac Emergency Management G. Novickis, Chairman, Kewaunee County Board The Honorable Darin A. Jeanquart G. Buckley, Two Rivers City Manager L. Hucek, Director, Kewaunee Emergency Management C. Meyer, President, Village of Mishicot K. Duveneck, Two Creeks Town Chairman INPO DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033320168.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MKunowski:dtp AVegel DATE 11/24/03 11/28/03 OFFICIAL RECORD COPY

A. Cayia ADAMS Distribution:

WDR DFT DWS OEDO RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1 BJK1 FJC JGL JLD LAD OEMAIL OEWEB MDS1 RJS2 PLA RWB1 MRJ1 MAS JRJ RML2 BAB2 WMD LSG SAR WHR DWW