ML033300023
| ML033300023 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/25/2003 |
| From: | Ernstes M Division of Reactor Safety II |
| To: | Stall J Florida Power & Light Co |
| References | |
| Download: ML033300023 (6) | |
Text
November 25, 2003 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - TURKEY POINT
Dear Mr. Stall:
In a telephone conversation on November 12, 2003, Mr. Richard S. Baldwin, Senior Operations Engineer, and Mr. Greg Laughlin, Operations Training Superintendent, made arrangements for the NRC to inspect the licensed operator requalification program at the Turkey Point Nuclear Power Plant. The inspection is planned for the week of January 26, 2004, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI Standard 3.5-1998.
In accordance with 10 CFR 55.59(c), the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in the Enclosure, in order to support the NRCs inspection program needs. Mr. Laughlin has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
FP&L In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Richard S. Baldwin at (404) 562-4642 or myself at (404) 562-4638.
Sincerely,
/RA/
Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41
Enclosure:
Materials Request List cc w/encl:
T. O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Walter Parker Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Michael O. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Don Mothena, Manager Nuclear Plant Support Services Florida Power & Light Company Electronic Mail Distribution (cc w/encl contd - see page 3)
FP&L (cc w/encl contd)
Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Attorney Florida Power & Light Company Electronic Mail Distribution Linda Tudor Document Control Supervisor Florida Power & Light Company Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution County Manager Metropolitan Dade County Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Curtis Ivy City Manager of Homestead Electronic Mail Distribution McHenry Cornel Training Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL 33035
FP&L Distribution w/encl:
E. Brown, NRR C. Evans (Part 72 Only)
L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE
/RA/
/RA/
/RA/
NAME RBaldwin MErnstes JMunday DATE 11/20/03 11/20/03 11/24/03 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033300023.wpd
Enclosure Materials Request List The items listed below are being requested per telephone conversation on November 20, 2003, to support the upcoming IP-71111.11 B inspection in January 2004 at Turkey Point Nuclear Power Plant. Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by January 12, 2004. Please have the items listed in paragraph "B" ready for our review upon arrival on January 26, 2004.
A.
In-office inspection material:
1.
Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2.
A copy of the last biennial requal written examination. (2RO/SRO exams) 3.
List of personnel scheduled for requal testing the week of 09/22/03.
4.
Copies of simulator scenarios for this exam.
5.
Program evaluation for the previous 2 years training cycle.
6.
A list of all personnel that reactivated their licenses since the last requal inspection.
7.
Simulator:
List of all open simulator discrepancies (DRs).
Copy of the Simulator Management and Configuration Procedures.
List of all closed simulator DRs for last 12 months.
List of Simulator Performance tests.
B.
On-site inspection material:
1.
Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2.
All training feedback forms since the last requal inspection.
3.
All remedial training packages since the last requal inspection.
4.
Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.
5.
Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
2 6.
Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7.
All Medical Exam Records with a copy of the individuals licence available. A list for review will be presented during the inspection week.
8.
Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9.
Copy of an Organizational Chart for the training department including the simulator group.
10.
Complete list of all Licensed individuals complete with license restrictions.
11.
Security procedures for the simulator.