ML033290532
| ML033290532 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/25/2003 |
| From: | Ring M NRC/RGN-III/DRP/RPB1 |
| To: | Kanda W FirstEnergy Nuclear Operating Co |
| References | |
| EA-03-007 | |
| Download: ML033290532 (3) | |
Text
November 25, 2003 EA-03-007 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT REPLY TO NOTICE OF VIOLATION DATED MARCH 4, 2003
Dear Mr. Kanda:
This acknowledges receipt of your letter dated October 24, 2003, which was a revision to your letter dated April 3, 2003, in response to our letter dated March 4, 2003, transmitting a Notice of Violation.
We have reviewed the corrective actions as described in your letter, and we have no further questions at this time. Your corrective actions will be examined during a future supplemental inspection using Inspection Procedure 95001 in accordance with the Action Matrix (Exhibit 5) of NRC Manual Chapter 0305. Current planning has targeted the first part of December 2003, for this IP 95001 inspection.
In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 See Attached Distribution
DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033290532.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII (EICS)
E RIII RIII NAME MMitchell/trn KLambert for BClayton MRing DATE 11/25/03 11/25/03 11/25/03 OFFICIAL RECORD COPY
W. Kanda cc:
G. Leidich, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
W. Kanda ADAMS Distribution:
AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)
C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1