ExeknaM Exelon Generation Company, LLC www.exeloncorp.com Nuclear LaSalle County Station 2601 North 21'Road Marseilles, IL 61341-9757 November 14, 2003 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374
Subject:
Monthly Operating Report for October 2003 Enclosed is the Exelon Generation Company (EGC), LLC, Monthly Operating Report for LaSalle County Station covering the period from October 1 through October 31, 2003. This report is submitted in accordance with Technical Specification 5.6.4.
Should you have any questions concerning this letter, please contact Mr. Glen T. Kaegi, Regulatory Assurance Manager, at (815) 415-2800.
Respectfully, Glen T. Kaegi Regulatory Assurance Manager LaSalle County Station Enclosure cc:
Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - LaSalle County Station
..DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE OPERATING DATA REPORT 50-373 LaSalle 1 November 05,2003 Stevie Du Pont (815) 415-2197 REPORTING PERIOD:
October 2003
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,154.00 1,111.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 745.00 745.00 0.00 855,009.00 Yr-to-Date 7,296.00 7,296.00 0.00 8,170,107.00 Cumulative 122,941.20 120,712.90 1.00 121,713,268.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments I
2 Reason:
A Equipment Failure (Explain)
Method:
I Manual B
C D
E F
G H
Maintenance or Test Refueling Regulatory Restriction Operator Training & License Examination Administration Operational Error (Explain)
Other (Explain) 2 3
4 5
Manual Trip/Scram Automatic Trip/Scram Continuation Other (Explain)
SUMMARY
- The unit operated at full power with the following exception: October 25, 2003 - Power was reduced to approximately 885 Mwe to perform flow control line adjustments. The unit was returned to full power on October 26.
UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE
- 1.
Challenges other than routine surveillance testing to Safety/Relief Valve Operations-None Page 1 of 2
OPERATING DATA REPORT
-DOCKET NO.
50 UNIT NAME DATE Nc COMPLETED BY STt TELEPHONE (8
REPORTING PERIOD:
-374 iSalle 2 ivember 05, 2003 evie Du Pont
- 15) 415-2197 October 2003
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,154.00 1,111.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 745.00 745.00 0.00 860,604.00 Yr-to-Date 6,422.72 6,299.45 0.00 7,025,821.00 Cumulative 114,459.32 113,328.85 0.00 115,351,262.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Reason Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Down 2 Comments I
2 Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
3 4
5 Manual Trip/Scram Automatic Trip/Scram Continuation Other (Explain)
SUMMARY
- The unit operated at full power during the month of October without exception.
UNIQUE REPORTING REQUIREMENTS FOR UNIT TWO
- 1. Challenges other than routine surveillance testing to Safety/Relief Valve Operations-None Page 2 of 2