FPL NOV 1 7 2003 L-2003-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 11/04/03 Linda Tudor
- (305) 246-6408 Reporting Period October, 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 i
s
________E.-__
Month Year-to-date Cumulative No. of hours reactor was critical 120.0 6671 198033.7 No. of hours generator was on line (service hours) 120.0 6671 193616.2 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 39977 4597693 127556783 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2) 20030022 10/0612003 S
624.0 C
1 RF21 (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F - Administrative G - Operational Error (Explain)
H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power until September 21, 2003. A power coastdown then commenced and continued through October 5, 2003. On October 6, 2003, Unit 4 was manually tripped in accordance with plant procedures from approximately 30% power to commence the Cycle 21 refueling outage. Unit 4 went on-line on November 5, 2003.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 11/04/2003 Linda Tudor
' (305) 246-6408 Reporting Period October, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
!71$wW11w '
Month Year-to-date Cumulative No. of hours reactor was critical 745.0 6529.8 201069.2 No. of hours generator was on line (service hours) 745.0 6487.8 198696 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 529065 4442998 129802075 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% powver for the month of October 2003.