ML033280753
| ML033280753 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 09/08/2003 |
| From: | Cooper P Nuclear Management Co |
| To: | NRC/RGN-III |
| References | |
| 50-282/03-301, 50-306/03-301 | |
| Download: ML033280753 (1) | |
Text
Prairie Island 2003 Initial license Examination Outline Review Comments No.
Source Comment Resolution 1.
ES-401-2 Tier 1/Group 1 W/E11 Loss of Emergency Coolant Recirc - KA EK1.2 cannot be tied to 10CFR55.43 is there an SRO learning objective tied to this KA? ES-401 D.1.c Repicked KA and selected EA2.1 2.
ES-401-2 Tier 1/Group 2 000003 Dropped Control Rod - KA AK1.03 is not tied to 10CFR55.43 is there an SRO learning objective tied to this KA? ES-401 D.1.c Repicked KA and selected AA2.03 3.
ES-401-2 Tier 2/Group 1 012 Reactor Protection - K.302 is not tied to 10CFR55.43 is there an SRO learning objective tied to this KA? ES-401 D.1.c Repicked KA and selected G 2.2.25 4.
ES-401-2 Tier 2/Group 1 064 Emergency Diesel Generator -
K6.07 is not tied to 10CFR55.43 is there an SRO learning objective tied to this KA? ES-401 D.1.c Repicked KA and selected G 2.2.22 5.
ES-301-1 SRO Admin Topic Conduct of Operations - JPM Review A Temporary Procedure Change. K/As associated with reviewing procedure changes fall under the area of equipment control not conduct of operations - NUREG 1122, Rev 2. Page 2-5 KA 2.2.6 Reselected JPM Obtain and verify a controlled procedure copy - New JPM KA G 2.1.21 6.
ED-D-1 Scenario A Whats the purpose of Event 6? Its not taken credit for on ES-301-5. If the steam line rupture is inboard of the MSIVs then not being able to shut them will not change the mitigation strategy.
Event 6 forces the crew into a response not obtained and results in changing to procedure ECA 2.1 7.
ES-D-1 Scenario C/ES-301-5 Do not list the ATWS as a Major event if you are going to take credit for it as a component failure. ES-301 D.5.d Will make editorial change.
Prairie Island 2003 Initial license Examination Outline Review Comments 8.
2003 Audit Exam Scenario Summary Why is DI-46158C, MSIV fails, repeated in the audit exam and on Scenarios A and B?
There are different actions required from the crew between Scnarios A&B in the Exam.