October 2003 Monthly Operating Report for Perry
ML033250333
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/12/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2747L
Download: ML033250333 (3)


Text

FENOC Perry Nuclear Power Plant 10 Center Road PO. Box 97 FirstEnergy Nuclear Operating Company Perry. Ohio 44081 November 12, 2003 PY-CEI/NRR-2747L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant DocketNo. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the October 2003 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

'~~~~~~~~~~~~~~~~~ !

g 1,A

i.

' ~~~~~~-

t '....

.*.{

OPERATING DATA REPORT UNIT:

Perry DATE:

11/6/03 1.

2.

3.

4.

5.

6.

7.

Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: October 2003 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 8.

9.

10.

11.

Ho Ho Un Ne

-This Month ---

Yr-to-Date-

--Cumulative -

urs Reactor was Critical 745.0 5,877.2 110,780.7 urs Generator On-Line 745.0 5,777.0 108,047.3 it Reserve Shutdown Hours 0.0 0.0 0.0 t Electrical Enermv (MWeHI 920,924.0 6.761.128.0 123.336.339.0 1-.___._1 Page 1

I il UNIT SHUTDOWNS REPORT MONTH - October 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 11/6/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2'

3 I

SUMMARY

The Perry Plant was on line the entire month of October.
1. TYPE:
2. REASON:
3. METHOD:

F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4-Continuation E - Operating Training &

5 - Other License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

Page 2