FENOC Perry Nuclear Power Plant 10 Center Road PO. Box 97 FirstEnergy Nuclear Operating Company Perry. Ohio 44081 November 12, 2003 PY-CEI/NRR-2747L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant DocketNo. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the October 2003 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
'~~~~~~~~~~~~~~~~~ !
g 1,A
- i.
' ~~~~~~-
t '....
.*.{
OPERATING DATA REPORT UNIT:
Perry DATE:
11/6/03 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: October 2003 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 8.
9.
10.
11.
Ho Ho Un Ne
-This Month ---
Yr-to-Date-
--Cumulative -
urs Reactor was Critical 745.0 5,877.2 110,780.7 urs Generator On-Line 745.0 5,777.0 108,047.3 it Reserve Shutdown Hours 0.0 0.0 0.0 t Electrical Enermv (MWeHI 920,924.0 6.761.128.0 123.336.339.0 1-.___._1 Page 1
I il UNIT SHUTDOWNS REPORT MONTH - October 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 11/6/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2'
3 I
SUMMARY
- The Perry Plant was on line the entire month of October.
- 1. TYPE:
- 2. REASON:
- 3. METHOD:
F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory 4-Continuation E - Operating Training &
5 - Other License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)