a:
-1.
Exek1 nsm Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 November 14,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Monthly Operating Report for October 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of October 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of October 2003 for Units 1 and 2.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, Bryan C. Hanson Plant Manager-LGS Attachments cc:
H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector 7 '
I
~
- i. :
.1 1!,
.. ::i:
,I,:.
1,
X s
e-bcc:
R. DeGregoro - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4
Unit:
Docket No:
Date:
- Completed by:
Telephone:
Limerick 1 50-352 11/14/03 Greg Lee (610) 718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-October 2003 1 Design Electrical Rating (MWe-Net) 11191.00 l
Maximum Dependable Capacit (MWe-Net) 1134.00 l
Month Year to Date I Cumulative Hours Reactor Critical (Hours) 745.00 7,234.07 137,102.47 Hours Generator On-Line (Hours) 745.00 7,208.101 135,117.20 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00
- -I.Net Electrical Energy (MWh)
-a-
-i-869,385.00-1
-- 8,343,473.00--
140,112;297.00 1 B.
UNIT SHUTDOWN No.
Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)
Off-line Duration (hrs)
None During October 2003
SUMMARY
Unit 1 began the month of October 2003 at 100.0% of rated thermal power (RTP).
There were no power changes during the month of October 2003.
Unit 1 ended the month of October 2003 at 100.0% RTP.
Type F-Forced S-Scheduled Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
C.
SAFETY/RELIEF VALVE OPERATION _
Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During October
i Unit:.
Docket No:
Date:
Completed by:
Telephone:
Limerick 2 50-353 11/14/03 Greg Lee (610)718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-October 2003 Design Electrical Rating (MWe-Net)
I1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 l Month Year to Date Cumulative Hours Reactor Critical (Hours)
J 745.00 6,858.60 112,986.10 Hours Generator On-Line (Hours) 745.00 6,788.72 111,223.72 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00
-Net Electrical Energy (MWh)
_-1 870;297;00 -7,666,263.00- -
19;300;506:00 B. UNIT SHUTDOWN No.
Date Type Generator Reason Method Corrective Actions/Comments (yyI mdd)
Off-line Duration (hrs)
None during October 2003
SUMMARY
Unit 2 began the month of October 2003 at 99.9% of rated thermal power (RTP).
There were no power changes for the month of October 2003.
Unit 2 ended the month of October 2003 at 99.9% RTP.
Type F-Forced S-Scheduled Reason Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated I No.& Type of Actuation -
-Plant Condition_ Description of Event I
None During October