October 2003 Monthly Operating Report for Limerick Units 1 & 2
ML033250331
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/14/2003
From: Bryan Hanson
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, T.S. 6.9.1.6
Download: ML033250331 (4)


Text

a:

-1.

Exek1 nsm Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 November 14,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for October 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of October 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of October 2003 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Bryan C. Hanson Plant Manager-LGS Attachments cc:

H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector 7 '

I

~

i. :

.1 1!,

.. ::i:

,I,:.

1,

X s

e-bcc:

R. DeGregoro - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4

Unit:

Docket No:

Date:

  • Completed by:

Telephone:

Limerick 1 50-352 11/14/03 Greg Lee (610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-October 2003 1 Design Electrical Rating (MWe-Net) 11191.00 l

Maximum Dependable Capacit (MWe-Net) 1134.00 l

Month Year to Date I Cumulative Hours Reactor Critical (Hours) 745.00 7,234.07 137,102.47 Hours Generator On-Line (Hours) 745.00 7,208.101 135,117.20 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00

  • -I.Net Electrical Energy (MWh)

-a-

-i-869,385.00-1

-- 8,343,473.00--

140,112;297.00 1 B.

UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None During October 2003

SUMMARY

Unit 1 began the month of October 2003 at 100.0% of rated thermal power (RTP).

There were no power changes during the month of October 2003.

Unit 1 ended the month of October 2003 at 100.0% RTP.

Type F-Forced S-Scheduled Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION _

Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event None During October

i Unit:.

Docket No:

Date:

Completed by:

Telephone:

Limerick 2 50-353 11/14/03 Greg Lee (610)718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-October 2003 Design Electrical Rating (MWe-Net)

I1191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 l Month Year to Date Cumulative Hours Reactor Critical (Hours)

J 745.00 6,858.60 112,986.10 Hours Generator On-Line (Hours) 745.00 6,788.72 111,223.72 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00

-Net Electrical Energy (MWh)

_-1 870;297;00 -7,666,263.00- -

19;300;506:00 B. UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yyI mdd)

Off-line Duration (hrs)

None during October 2003

SUMMARY

Unit 2 began the month of October 2003 at 99.9% of rated thermal power (RTP).

There were no power changes for the month of October 2003.

Unit 2 ended the month of October 2003 at 99.9% RTP.

Type F-Forced S-Scheduled Reason Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated I No.& Type of Actuation -

-Plant Condition_ Description of Event I

None During October