Category:Letter
MONTHYEARIR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24151A6322024-05-30030 May 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:Meeting Summary
MONTHYEARML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24176A1252024-06-28028 June 2024 Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding the Hydrologic Analysis Updates ML24155A0422024-06-13013 June 2024 Meeting Summary: Public Scoping Webinars for the Environmental Review of the Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML24142A5152024-05-28028 May 2024 April 22, 2024, Summary of Public Mtg with Tennessee Valley Authority to Discuss Use of Risk-Informed Process Evaluation for a Proposed License Amendment Request Elimination of Limiting Condition for Operation Actions for the Rod Worth Mini ML24155A0432024-04-18018 April 2024 Meeting Summary ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24057A0402024-02-27027 February 2024 Summary of February 7, 2024, Public Meeting with Tennessee Valley Authority to Preliminarily Discuss the Planned Approach for the Browns Ferry Nuclear Plant Hydrologic Analysis ML24043A0462024-02-16016 February 2024 Summary of Meeting with TVA to Discuss Use of Risk-Informed Process Evaluation (RIPE) for a Proposed LAR Regarding Elimination of Limiting Condition for Operation Actions for Rod Worth Minimizers ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23157A1272023-06-13013 June 2023 Meeting Summary for Environmental Pre-Submittal Meeting for Subsequent License Renewal Application on May 11, 2023 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22319A1952022-12-0202 December 2022 Summary of October 13, 2022, Meeting with Tennessee Valley Authority to Discuss Planned Alternative Requests for the Fifth 10-Year Inservice Testing Program Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22298A1612022-11-17017 November 2022 Summary of Public Meeting on SAMA with TVA ML22266A2742022-09-28028 September 2022 Summary of September 22, 2022, Public Meeting with Tennessee Valley Authority to Discuss a Request to Use a Later Edition of the ASME OM Code ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22103A2472022-04-14014 April 2022 Summary of April 12, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Revised Criticality Analysis License Amendment Request ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21266A0532021-10-20020 October 2021 Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 ML21273A1922021-10-12012 October 2021 September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect ML21251A1122021-09-14014 September 2021 Summary of September 7, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21155A0212021-06-0808 June 2021 Summary of Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20162A1532020-06-25025 June 2020 Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20094M9012020-04-13013 April 2020 Summary of April 2, 2020 Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of a License Amendment Request Adoption of 10 CFR 50.69 ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18242A4882018-09-24024 September 2018 Summary of Pre-Application Conference Call with Tennessee Valley Authority to Discuss Proposed Changes to Modifications Associated with Approved NFPA 805 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant ML18068A0792018-03-15015 March 2018 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 ML18053A5362018-03-0101 March 2018 Summary of February 7, 2018, Pre-Application Conference Call with TVA a Planned License Amendment Request to Change the Emergency Response Organization Staffing ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML17131A2512017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17061A6722017-04-0606 April 2017 Summary of February 15, 2017, Meeting with Tennessee Valley Authority on Updates to the Transmission System Regarding Extended Power Uprate for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17017A4552017-02-0303 February 2017 Summary of Meeting with Tennessee Valley Authority Regarding Maximum Extended Load Line Limit Plus Pre-Application Meeting for Browns Ferry Nuclear Plant ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16210A4532016-08-16016 August 2016 07/19/2016 Summary of Meeting with Tennessee Valley Authority Regarding Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant (CAC Nos. MF6741, MF6742, and MF6743) ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary 2024-09-23
[Table view] |