Summary of Public Meetings to Discuss Firstenergy'S Plans to Address Safety Conscious Work Environment and Safety Culture
ML033230201
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/18/2003
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML033230201 (3)


Text

November 18, 2003 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE OCTOBER 1, 2003, PUBLIC MEETINGS TO DISCUSS FIRSTENERGYS PLANS TO ADDRESS SAFETY CONSCIOUS WORK ENVIRONMENT AND SAFETY CULTURE On October 1, 2003, the Nuclear Regulatory Commission (NRC) held a public meeting at the NRC Region III office in Lisle, Illinois. The meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss the licensees plans to address safety conscious work environment and safety culture. The meeting notice and transcript can be found in ADAMS as ml032601033 and ml032890761; respectively. A list of NRC and licensee meeting participants can be found in Enclosure 1.

The licensees presentation can be found in ADAMS as ml032760119, which includes the meeting agenda.

The presentation slides, meeting transcript, and many other documents related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Meeting Participants See Attached Distribution DOCUMENT NAME: C:\ORPCheckout\FileNET\ML033230201.wpd

  • See previous concurrence To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME MPhillips/trn* CLipa DATE 11/04/03 11/ /03 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encls: G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy State Liaison Officer, State of Ohio R. Owen, Ohio Department of Health Ohio Public Utilities Commission C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Emergency Management Agency S. Isenberg, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable Robert Purney The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown S. Arndt, President, Ottawa County Board of Commissioners The Honorable Joe Ihnat INPO D. Lochbaum, Union of Concerned Scientists P. Gunter, Nuclear Information and Resource Service J. Riccio, Greenpeace

FirstEnergy Nuclear Operating Company ADAMS Distribution:

DFT S. Rosenberg, OEDO RidsNrrDipmlipb J. Caldwell, RIII B. Clayton, RIII DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure 1 Meeting Participants NRC J. Caldwell, Regional Administrator G. Grant, Deputy Regional Administrator J. Grobe, Chairman, Davis-Besse Oversight Panel C. Pederson, Director, Division of Reactor Safety C. Lipa, Chief, Branch 4, Division of Reactor Projects C. S. Thomas, Senior Resident Inspector, Davis-Besse D. Passehl, Project Engineer M. Phillips, Project Engineer G. Wright, Safety Culture Inspection Team Leader Present from NRC Headquarters via videoconference:

W. Ruland, Vice-Chairman, Davis-Besse Oversight Panel A. Mendiola, Section Chief, Division of Licensing and Project Management, NRR J. Hopkins, Project Manager, NRR L. Jarriel, Agency Allegation Advisor, Safety Culture Inspection Team Member C. Goodman, Safety Culture Inspection Team Member J. Persensky, Safety Culture Inspection Team Member S. Bloom, Project Manager, NRR FirstEnergy Nuclear Operating Company G. Leidich, President L. Myers, Chief Operating Officer M. Bezilla, Site Vice President and Acting Plant Manager J. R. Fast, Director, Organizational Effectiveness F. VonAhn, Vice President, Quality Oversight D. Gudger, Supervisor, Regulatory Affairs J. Hagan, Senior Vice President, Engineering A. Lewis, Shift Manager, Operations J. Reuter, Radiation Protection Staff R. Zuichowicz, Maintenance Mechanic and Chief Union Steward