Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President November 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Withdrawal of Proposed License Amendment, Changes to Post-Accident Monitoring Instrumentation Requirements

REFERENCES:

1.

Entergy letter to the NRC, 2.02.072, Request for Amendment to the Technical Specifications - Changes to Post-Accident Monitoring Instrumentation Requirements dated August 19, 2002.

2.

Entergy letter to the NRC, 2.03.019, Request for Amendment to the Technical Specifications - Changes to Post-Accident Monitoring Instrumentation Requirements, dated February 14, 2003.

3.

Entergy letter to the NRC, 2.03.034, Request for Amendment to the Technical Specifications - Changes to Post-Accident Monitoring Instrumentation Requirements, dated Mach 27, 2003.

4.

Entergy letter to the NRC, 2.03.044, Request for Amendment to the Technical Specifications - Changes to Post-Accident Monitoring Instrumentation Requirements, dated April 14, 2003.

LETTER NUMBER:

2.03.130

Dear Sir or Madam:

The purpose of this letter is to inform the NRC that Entergy is withdrawing the proposed License Amendment (Reference 1) to the Pilgrim Technical Specifications regarding the Post-Accident Monitoring Instrumentation Requirements and the supplements provided in References 2 to 4 (listed above).

203130

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Letter Number: 2.03.130 Page 2 Subsequent to our submittals (References 1 to 4), the NRC published in the Federal Register a final rule regarding combustible gas control in containment, on September 16, 2003. In addition, on September 25, 2003, the NRC also published a notice of availability of a model application concerning technical specification improvements, including changes to the hydrogen and oxygen monitor requirements. Entergy will evaluate these Federal Register notices and utilize the information as appropriate.

There are no new commitments made in this letter. If you have any questions, please contact Mr. Bryan Ford 508-830-8403.

Sincerely, Michael A. Balduzzi cc:

Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Robert Walker Radiation Control Program Commonwealth of Massachusetts Exec Offices of Health & Human Services 174 Portland Street Boston, MA 02114 Mr. Steve McGrail, Director Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 Senior Resident Inspector Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19408 203130