MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000336/20233022023-03-0707 March 2023 Operator Licensing Retake Examination Report 05000336/2023302 IR 05000336/20223012022-11-22022 November 2022 Initial Operator Licensing Examination Report 05000336/2022301 IR 05000423/20223022022-03-0707 March 2022 Operator Licensing Retake Examination Report 05000423/2022302 IR 05000423/20213012021-11-10010 November 2021 Initial Operator Licensing Examination Report 05000423/2021301 IR 05000336/20203012020-11-12012 November 2020 Initial Operator Licensing Examination Report 05000336/2020301 IR 05000423/20193012019-10-28028 October 2019 Initial Operator Licensing Examination Report 05000423/2019301 IR 05000336/20183012018-11-20020 November 2018 Initial Operator Licensing Examination Report 05000336/2018301 IR 05000423/20173012018-02-0606 February 2018 Initial Operator Licensing Examination Report 05000423/2017301 IR 05000336/20173022017-03-0808 March 2017 Initial Re-take Operator Licensing Examination Report 05000336/2017302 IR 05000336/20163012016-11-23023 November 2016 Initial Operator Licensing Examination Report 05000336/2016301 IR 05000423/20153012015-11-0202 November 2015 Er 05000423/2015301; September 14 to 18, 2015 and September 21, 2015; Millstone Power Station, Unit 3; Initial Operator Licensing Examination Report IR 05000336/20143012015-01-0808 January 2015 Er 05000336/2014301; September 29-October 31, 2014; Millstone Power Station, Unit 2; Initial Operator Licensing Examination Report IR 05000423/20133012014-01-16016 January 2014 Er 05000423/2013301; December 2-9, 2013; Millstone Power Station, Unit 3, Initial Operator Licensing Examination Report IR 05000336/20113012011-12-0606 December 2011 Er 05000336-11-301, on 10/ 3-11/2011, Millstone Power Station, Unit 2, Initial Operator Licensing Examination Report IR 05000423/20113022011-08-0404 August 2011 Er 05000423/11-302, on 7/11-7/18/2011, Millstone Power Station, Unit 3, Initial Operator Licensing Examination Report IR 05000423/20093022009-11-0202 November 2009 Er 05000423-09-302; September 14-22, 2009; Millstone Power Station, Unit 3; Initial Operator Licensing Examination Report IR 05000336/20093012009-05-18018 May 2009 Er 05000336/2009301, January 26 - February 24, 2009, Millstone Power Station, Unit 2, Initial Operator Licensing Examination Report ML0331604982003-11-12012 November 2003 Senior Reactor Operator Initial Examination Report No. 050000336/2003-302 2023-03-07
[Table view] |
See also: IR 05000336/2003302
Text
November 12, 2003
Mr. David A. Christian, Sr. Vice President
and Chief Nuclear Officer
Dominion Resources
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: MILLSTONE UNIT 2 SENIOR REACTOR OPERATOR INITIAL EXAMINATION
REPORT NO. 05000336/2003-302
Dear Mr. Christian:
This report transmits the results of the senior reactor operator (SRO) licensing examination
conducted by the NRC during the period of September 22-25, 2003 and of the post-examination
review during the period September 26 - October 8, 2003. This examination addressed areas
important to public health and safety and was developed and administered using the guidelines
of the Examination Standards for Power Reactors (NUREG-1021, Revision 9).
Based on the results of the examination, all six Senior Reactor Operator Upgrade applicants
passed all portions of the examination.
Mr. DAntonio discussed performance insights observed during the examination with members
of your staff on September 25, 2003. On October 10, 2003, final examination results, including
individual license numbers, were given during a telephone call between Mr. DAntonio and
Mr. Bob Cimmino.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). These records include the final examination and are available in ADAMS, RO/SRO
Written - Accession Number ML033140078; SRO/RO Operating Section A - Accession Number
ML033140099; SRO/RO Operating Section B - Accession Number ML033140103; and
SRO/RO Operating Section C - Accession Number ML033140118). ADAMS is accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading
Room).
Mr. David A. Christian 2
Should you have any questions regarding this examination, please contact me at (610) 337-
5183, or by E-mail at RJC@NRC.GOV.
Sincerely,
/RA/
Richard J. Conte, Chief
Operational Safety Branch
Division of Reactor Safety
Docket No. 50-336
License No. DPR-65
Enclosure: Initial Examination Report No. 05000336/2003-302
cc w/encl:
J. A. Price, Site Vice President - Millstone
C. L. Funderburk, Director, Nuclear Licensing and Operations Support
D. W. Dodson, Acting Manager - Licensing
L. M. Cuoco, Senior Counsel
V. Juliano, Waterford Library
S. Comley, We The People
J. Buckingham, Department of Public Utility Control
E. Wilds, Director, State of Connecticut SLO Designee
First Selectmen, Town of Waterford
D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN
J. M. Block, Attorney, CAN
G. Winslow, Citizens Regulatory Commission (CRC)
J. Markowicz, Co-Chair, NEAC
E. Woollacott, Co-Chair, NEAC
W. Meinert, Massachusetts Municipal Wholesale Electric Company
C. Brinkman, Manager, Washington Nuclear Operations
Mr. David A. Christian 3
Distribution w/encl: <VIA E-MAIL>:
Region I Docket Room (with concurrences)
S. Schneider, SRI - Millstone Unit 2 and Unit 3
H. Miller, ORA
J. Wiggins, ORA
T. Madden, OCA
J. Jolicoeur, OEDO
J. Clifford, NRR
R. Ennis, PM, NRR
G. Wunder, Backup PM, NRR
V. Nerses, PM, NRR
B. McDermott, RI
K. Jenison, RI
D. Screnci, PAO
J. White, INPO (whitejl@inpo.org)
J. DAntonio, Chief Examiner, DRS
C. Buracker, DRS
W. Lanning, DRS
R. Crlenjak, DRS
DRS Master Exam File
DRS OL Facility File
DRS File
DOCUMENT NAME: C:\MYFILES\Copies\MP2ExamReport.wpd ADAMS PKG: ML030420159
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRP R1/DRS/OSB
NAME CBuracker JDAntonio BMcDermott RJConte
DATE 11/03/03 11/10/03 11/10/03 11/ /03
OFFICIAL RECORD COPY
U. S. NUCLEAR REGULATORY COMMISSION
REGION I
Docket No: 50-336
License No: DPR-65
Report No: 05000336/2003-302
Licensee: Dominion Nuclear Connecticut
Facility: Millstone, Unit 2
Dates: September 22-25, 2003 (Operating Test Administration)
September 18, 2003 (Written Examination Administration)
October 8, 2003 (Licensee Post Exam Letter) Received
October 9, 2003
September 29 - October 9, 2003 (Examination Grading and
Evaluation)
Examiners: Joseph M. DAntonio, Operations Engineer (Chief Examiner)
John Caruso, Senior Operations Engineer
Approved by: Richard J. Conte, Chief
Operational Safety Branch
Division of Reactor Safety
Enclosure
SUMMARY OF FINDINGS
IR 05000336/2003-302; 09/18/03-09/25/03; Millstone, Unit 2; Initial Operator Licensing
Examination.
The written examinations were administered by the facility and the operating tests were
administered by two NRC region-based examiners. There were no inspection findings of
significance. The NRCs program for overseeing the safe operation of commercial nuclear
power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated
July 2000.
A. NRC-Identified and Self-Revealing Findings
Cornerstone: Mitigating Systems
All six Senior Reactor Operator Upgrade applicants passed their examinations.
There were no inspection findings of significance.
B. Licensee-Identified Violations
None
ii Enclosure
Report Details
1. REACTOR SAFETY
Mitigating Systems - Senior Reactor Operator (SRO) Initial License Examination
a. Scope of Review
The NRC examiners reviewed the facility developed written and operating initial
examinations and together with Millstone Unit 2 training and operations personnel
verified or ensured, as applicable, the following:
- The examination was prepared and developed in accordance with the guidelines
of Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors. A review was conducted in the Region I office and at the
Millstone 2 plant and training facility. Final resolution of comments and
incorporation of test revisions were conducted during and following the onsite
preparation week.
- Simulation facility operation was proper.
- A test item analysis was completed on the written examination for feedback into
the systems approach to training program.
- Examination security requirements were met.
The NRC examiners administered the operating portion of the examination to all
applicants during September 22-25, 2003. The written examination was administered
by the Millstone training staff on September 18, 2003. Final facility exam grading,
analysis, and comments were received by the NRC on October 9, 2003 as documented
by letter dated October 8, 2003.
b. Findings
Grading and Results
All six SRO applicants passed all portions of the initial licensing examination.
The facility had no post-examination comments.
Enclosure
2
4OA6 Meetings, including Exit
The examination period was from September 18 to October 8, 2003, and it included
administration, grading, and review of licensee post exam documents. On
September 25, 2003, the NRC provided preliminary observations and comments to
Millstone 2 staff during an outbrief from the site. On October 10, 2003, examination
results and license numbers were provided to a Millstone 2 management representative
via telephone.
Enclosure
KEY POINTS OF CONTACT
Licensee Personnel
Mike Wilson, Manager of Nuclear Training
Trad Horner, Supervisor Nuclear Training
Bob Cimmino, Senior Instructor
NRC Personnel
Joseph DAntonio, Operations Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened and Closed
NONE
Attachment 1