MONTHYEARML24036A3382024-02-0505 February 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 8 Meeting Slides ML24030A4672024-01-30030 January 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 1 Meeting Slides ML23249A1592023-09-13013 September 2023 License Renewal Application Pre-Application Meeting: September 13, 2023 ML23255A0012023-09-13013 September 2023 PG&E Slides for 9/13 Public Meeting Related to Diablo Canyon License Renewal ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23143A0882023-05-24024 May 2023 May 24, 2023, Public Meeting Slides Related to Diablo Canyon License Renewal ML23118A0902023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides ML23143A0952023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides for PG&E Presentation ML23079A0452023-03-16016 March 2023 RIC 2023 Slides - Maureen Zawalick TH19 ML22339A1022022-12-0505 December 2022 Pg_E Presentation for NRC Public Meeting ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 ML22200A0722022-07-21021 July 2022 PG&E Slides for Post-Shutdown Decommissioning Activities Report Public Meeting, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan - July 21, 2022 ML21223A0842021-08-11011 August 2021 Slides for Post Shutdown EP pre-submittal Public Teleconference 8-30-2021 ML21060B1872020-01-26026 January 2020 Enclosure 3 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Slides ML19165A0092019-06-14014 June 2019 Pre-Submittal Meeting - Presentation Slides ML18333A1092018-11-28028 November 2018 Presentation Slides for Diablo Public Meeting to Discuss Proposed Exemption Request for Decommissioning Funds ML17296A2222017-08-29029 August 2017 Presentation on Reactor Decommissioning for the August 29, 2017 at Congressman Salud Carbajal'S Public Meeting at San Luis Obispo Near Diablo Canyon ML15232A0102015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15216A4112015-08-0404 August 2015 TSTF-505: August 4, 2015 Public Meeting ML15216A4082015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15209A9442015-07-28028 July 2015 June 24, 2015, Summary of Annual Assessment Meeting with Pacific Gas and Electric and Public Open House Regarding Diablo Canyon Power Plant 2014 Performance ML15202A0982015-07-21021 July 2015 Slides for the August 5, 2015 Diablo Canyon Power Plant License Renewal Application Public Scoping Meeting ML15117A0692015-04-28028 April 2015 Pacific Gas and Electric Co. April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15117A2262015-04-28028 April 2015 Nuclear Regulatory Commission April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15035A0062015-02-0404 February 2015 Meeting Presentation, Diablo Canyon Power Plant Process Protection System Replacement Lessons Learned Using ISG 6 NRC Meeting on Digital I&C. ML15029A0942015-02-0303 February 2015 Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation ML15014A2232015-01-14014 January 2015 Slides Regulatory Conference - January 14, 2015 ML14188A9702014-07-0808 July 2014 14-07-08 ISG-06 Experience Presentation July 8 2014 Digital IC Meeting ML14155A3742014-06-0404 June 2014 May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13150A1712013-11-19019 November 2013 1978 - Rhrp Cavitation ML13274A5142013-10-0202 October 2013 License Slides, 10/2/13 Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 (TAC ML13269A0052013-09-26026 September 2013 Licensee Slides for 9/26/13 Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B ML13268A0022013-09-25025 September 2013 Slide Presentation for 9/25/13 Preapplication Meeting - Use of Leak-before-break for Fuel Structural Analyses and Coolable Geometry ML13268A0052013-09-24024 September 2013 Slide Presentation for 9/24/13 Pre-application Meeting, Diesel Generator License Amendment Request ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13066A7402013-03-0707 March 2013 Licensee Slides from 3/7/13 Pre-Application Meeting with Pacific Gas and Electric Company(Tac MF0687 & MF0688) ML13044A7352013-02-12012 February 2013 Licensee Slides from 2/12/13 Public Meeting to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13024A4052013-01-24024 January 2013 Licensee Slides from 1/24/13 Meeting to Discuss Offsite Power ML13018A1342013-01-15015 January 2013 Pacific Gas and Electric Handouts from January 15, 2013 Meeting Regarding Pending License Amendment Request Related to Diesel Generator Technical Specifications ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12347A3102012-12-12012 December 2012 Summary of Meeting with Public on Diablo Canyon Power Plant ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12226A2552012-08-0707 August 2012 License Slides from 8/7/12 Meeting with Pacific Gas and Electric Regarding Future License Amendment Associated with Diesel Generator Technical Specifications ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review ML1117205702011-06-20020 June 2011 Licensee Slides from 6/20/11 Pre-Licensing Meeting on Seismic License Amendment Request ML1116405342011-06-0707 June 2011 Slides from Meeting with Pacific Gas and Electric Company Regarding Diablo Canyon Process Protection System Replacement 2024-02-05
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24036A3382024-02-0505 February 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 8 Meeting Slides ML24030A4672024-01-30030 January 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 1 Meeting Slides ML23255A0012023-09-13013 September 2023 PG&E Slides for 9/13 Public Meeting Related to Diablo Canyon License Renewal ML23249A1592023-09-13013 September 2023 License Renewal Application Pre-Application Meeting: September 13, 2023 ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23143A0882023-05-24024 May 2023 May 24, 2023, Public Meeting Slides Related to Diablo Canyon License Renewal ML23118A0902023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides ML23143A0952023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides for PG&E Presentation ML23079A0452023-03-16016 March 2023 RIC 2023 Slides - Maureen Zawalick TH19 ML22339A1022022-12-0505 December 2022 Pg_E Presentation for NRC Public Meeting ML22236A5472022-08-24024 August 2022 NRC Slides for Decommissioning Engagement Panel 8-24-2022 Meeting ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 ML22200A0722022-07-21021 July 2022 PG&E Slides for Post-Shutdown Decommissioning Activities Report Public Meeting, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan - July 21, 2022 ML21223A0842021-08-11011 August 2021 Slides for Post Shutdown EP pre-submittal Public Teleconference 8-30-2021 ML20310A2792020-11-0505 November 2020 Slides for Defueled TS Pre-Submittal Public Teleconference November 24, 2020 (L-2020-LRM-0101) ML21060B1872020-01-26026 January 2020 Enclosure 3 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Slides ML19233A0722019-08-27027 August 2019 NEIMA Meeting Slides Public ML18295A0732018-10-24024 October 2018 Final Diablo Canyon Decommissioning Engagement Panel Meeting Oct 24 2018 ML17296A2222017-08-29029 August 2017 Presentation on Reactor Decommissioning for the August 29, 2017 at Congressman Salud Carbajal'S Public Meeting at San Luis Obispo Near Diablo Canyon ML16335A4392016-11-30030 November 2016 PG&E Reg Conference Presentation - NRC-11152016 ML15232A0102015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15216A4112015-08-0404 August 2015 TSTF-505: August 4, 2015 Public Meeting ML15216A4082015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15209A9442015-07-28028 July 2015 June 24, 2015, Summary of Annual Assessment Meeting with Pacific Gas and Electric and Public Open House Regarding Diablo Canyon Power Plant 2014 Performance ML15202A0982015-07-21021 July 2015 Slides for the August 5, 2015 Diablo Canyon Power Plant License Renewal Application Public Scoping Meeting ML15117A2262015-04-28028 April 2015 Nuclear Regulatory Commission April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15117A0692015-04-28028 April 2015 Pacific Gas and Electric Co. April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15035A0062015-02-0404 February 2015 Meeting Presentation, Diablo Canyon Power Plant Process Protection System Replacement Lessons Learned Using ISG 6 NRC Meeting on Digital I&C. ML15029A0942015-02-0303 February 2015 Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation ML15014A2232015-01-14014 January 2015 Slides Regulatory Conference - January 14, 2015 ML14195A3742014-07-10010 July 2014 Update of Industry Actions Related to Diablo Canyon OE ML14188A9702014-07-0808 July 2014 14-07-08 ISG-06 Experience Presentation July 8 2014 Digital IC Meeting ML14155A3742014-06-0404 June 2014 May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13150A1712013-11-19019 November 2013 1978 - Rhrp Cavitation ML13150A1812013-11-19019 November 2013 Trade-Off Between Tank Vortexing Margin and ECCS Function ML13274A5142013-10-0202 October 2013 License Slides, 10/2/13 Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 (TAC ML13269A0052013-09-26026 September 2013 Licensee Slides for 9/26/13 Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B ML13268A0022013-09-25025 September 2013 Slide Presentation for 9/25/13 Preapplication Meeting - Use of Leak-before-break for Fuel Structural Analyses and Coolable Geometry ML13268A0052013-09-24024 September 2013 Slide Presentation for 9/24/13 Pre-application Meeting, Diesel Generator License Amendment Request ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13066A7402013-03-0707 March 2013 Licensee Slides from 3/7/13 Pre-Application Meeting with Pacific Gas and Electric Company(Tac MF0687 & MF0688) ML13044A7352013-02-12012 February 2013 Licensee Slides from 2/12/13 Public Meeting to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13024A4052013-01-24024 January 2013 Licensee Slides from 1/24/13 Meeting to Discuss Offsite Power ML13018A1342013-01-15015 January 2013 Pacific Gas and Electric Handouts from January 15, 2013 Meeting Regarding Pending License Amendment Request Related to Diesel Generator Technical Specifications ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12226A2552012-08-0707 August 2012 License Slides from 8/7/12 Meeting with Pacific Gas and Electric Regarding Future License Amendment Associated with Diesel Generator Technical Specifications ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a 2024-02-05
[Table view] |
Text
This tool is referred to as "RABBIT' at Diablo Canyon Power Plant.
"RABBIT' is an acronym for "Risk Assessment Based Barrier Impairment Tracking". RABBIT would be accessible through a PC in the control room and would be used by operators in response to degraded fire protection features in the plant.
I
EXAMPLES of Potential Fire Compliance Process Application at a Plant I) Two examples are presented in the form of a computerized tool (RABBIT) to choose among compliance alternatives. Examples include:
A. Impaired fire door between two Vital Switchgear Rooms B. Impaired automatic sprinkler system in CCW Heat Exchanger Room This tool is referred to as "RABBIT" at Diablo Canyon Power Plant.
"RABBIT' is an acronym for "Risk Assessment Based Barrier Impairment Tracking". RABBIT would be accessible through a PC in the control room and would be used by operators in response to degraded fire protection features in the plant.
2
"RABBIT" Block Diagram P...
U.., res 9
'-t. ,
This is a high-level block diagram of how RABBIT might be structured.
There are three stages to this program: the "Identification Stage",
"Mapping Stage", and "Evaluation Stage". The WOG project will support the Evaluation Stage of RABBIT.
In the "Identification Stage", an impairment is discovered and the impaired component identification number is entered into RABBIT.
In the "Mapping Stage", RABBIT queries a database relating fire protection features to fire areas/zones. The fire areas/zones affected by the impairment are determined in this step.
In the "Evaluation Stage", several databases are queried and manipulated to determine the fire CDF given the degradation and potential compensatory measures. Results from the WOG Risk-Informed Fire Protection Compliance Process" will be used to populate the following Evaluation Stage databases: Potential Compensatory Measures, Rules for Assigning Degradation Level, Rules for Changing Degradation to CDF, and Rules for Reducing CDF Based on Compensatory Measures.
3
Enr~a ifntase Userr-Intrfa Intranet-Based User-Interface Welcome to the RABBITS User-interface Enter Component Identification Number Below Then Press "Next" Comp ID l Door 309 I Cancel Next>l In this first example, an operator discovers that Door 309 is failing to close completely due to a problem with the automatic door closure device. The door is labeled "FIRE DOOR Notify Shift Foreman if Inoperable". The operator calls the shift foreman with the door number and describes the impairment. The shift foreman opens the RABBIT program through the company intranet and enters the impaired door number.
4
I i ** 'g~
INIO j';=;
Update of Involved Areas Fire Feature - Fire Door Feature Type - 1.1 2-hour rated
_ Pru~~~~~~~~Wde n
Men FkeAre ArmaD"ccVtkn A," Lalion Calcuiton 13-A 4.6 kV SwIchgasr F Bus Rom. N EL Tb1gr Bldg 2 IS 4 GBkVS.th.rRom. NETbBIde Y G= EL=
Select Level of Feature Degradation Then Press 'Next CancelI 14Back INOMt I RABBIT queries a database with the Door I.D. and returns the affected fire areas/zones. The operator is then prompted to select the level of degradation (High, Medium, or Low) based on established fire protection rules. Similar to the Fire SDP, the "WOG Risk-Informed Fire Protection Compliance Process" will define a set of impaired states for characterizing the level of degradation as High, Medium, or Low. A drop-down menu may be included here to provide guidance to the operator.
5
I lF§Ll:Eseseei IIl I Iltl llA Area Specific CDF Update Fire Area(s) A, 13-B Wndow I E i lComPMeasures I bAo l 3 hrs l l i Incr reased by Factor dol lk.8Q~equired~gS, gCDF 191xl ner"uCDF (Near) 3.33E403l Click Next" Below Instantr For Comp Measures Canc1 j< Back NeXlli RABBIT uses information about the impaired feature and affected fire areas/zones to produce an area specific CDF update. This display is similar to the operations tool O-S, which is used for a(4) risk assessment. The operator is presented here with a visual indication of risk level for the particular impairment:
Red "High" Risk Impairment Yellow "Medium" Risk Impairment Green "Low" Risk Impairment In this example, the impairment is determined to have a high risk impact and require immediate attention.
6
With this screen, the operator is presented with a list of ranked compensatory measures. The operator chooses the most appropriate compensatory measure based on the amount of time required to repair the degradation. This helps operations to more cost-effectively utilize their resources.
The WOG project will initially investigate the most common forms of compensatory measures (i.e. continuous fire watches, roving fire watches, and possibly portable detection systems), but the methodology may be extended to include other compensatory measures like a roving watch specifically to verify that combustible loading limits have not been exceed, staged firefighting equipment, taking temporary credit for manual actions, etc.
7
LABDLOCANYON POWtR PLANT Area Specific CDF Update Fre Area(s) -13A 13-B Window Comp Measures Notl Required I C ncel I B.d IN.t I The program then returns a new update screen that includes the change in riskilevel based on the chosen action. The values in this screen will change depending on the action selected.
In this particular example, the operator chose to repair the door immediately given the risk significance of the degradation.
8
I: I l it' -I- (' .Nikl f V 1--~-
Second Example a Auto sprinkler system in CCW Heat Exchanger Room out of service Maintenance personnel replacing a check valve had to isolate a portion of the turbine building sprinkler system. This placed the CCW HXR Room sprinkler system out of service.
9
S~~~~~~% I ., %;8t^:t o~ieJ ~I l' En Area Specific CDF Update Fire Area(s) E (CCW HXR Room)
Window q ul' l'~' CDF Increased by Factor of Click Nextw Below l Istantaneous CDF (Near) s For Comp Measures rianc. I< Bck et >
Next j RABBIT presents the following CDF Update screen for this scenario. In this example, the risk-level of the impairment was determined to be relatively low (i.e. green).
10
DIABLO CANYON POWERPLANT Compensatory Measures Screen Fire Area(s) E (CCW KXR Room)
Feature -Sprnkler System Nuboer Compbatry u Measure, RiskRctdionAssodtdWthCop Measure Cop Me.*No.Lo Val".wBelow kda% toF Ao Repair Sprinkler Problem i -- I 2yrs I it NoCompsatory l 4 12E-07 l PossibleCompensatory M.as 2 RoohgFire Watci (24te) 98.4% 221-05l 1586n 3 Ro*cgFreWatc(12 ) 998% ISIE5 al US 4 Cootmf~llireWi't 100% 1.5I03 asS prsctcgl The "AOT" for the impaired sprinkler system with no compensatory measure is shown as 2.5 years. It is important to note here that it IS NOT THE INTENT of this project to justify taking a longer time than normal to repair a degradation. The degradation should be repaired as soon as practical. The intent of this project is to determine a compensatory measure commensurate with safety while repair efforts are in process. To prevent the "Risk Informed Fire Protection Compliance Process" from being used to justify long maintenance times, DCPP is considering a performance-based approach similar to the Maintenance Rule that would flag situations where maintenance takes longer than it has historically for similar types of repairs.
11
g aI s~~~~~~tW
) I\ \)'V I,11;
'I wl1~
Area Specific CDF Update Fire Area(s) E (CCW HXR Room)
Window I
Bch Tex.t a
I In this low-risk example, the operator has the option of not placing a compensatory measure provided the repair is completed prior to the risk-based "AOT" or the normal repair time indicated by DCPP historical performance data, whichever is shorter.
12
III.) L .I " ~
It" ..
Thoughts on Licensing Issues o Per DCPP Operating License:
- "PG&E may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire."
13
Thoughts on Licensing Issues (Cont.)
o Impairment Scenario 1
- RI FP Compliance Process indicates that impairment has a HIGH RISK IMPACT, and that compensatory measures specified by existing program are not sufficient. Additional compensatory measures should be taken and degradation repaired immediately.
14
I IIII. rl(ll% J It I.IIIl Thoughts on Licensing Issues (Cont.)
o Impainnent Scenario (cont.)
- RI FP Compliance Process improves safety and does not adversely impact ability to achieve and maintain safe shutdown.
- No prior NRC approval necessary for this change.
15
- ' ( ci;t,,
C" . ID I-,_
Thoughts on Licensing Issues (Cont.)
o Impairment Scenario 2
- RI FP Compliance Process indicates that impairment has a LOW RISK IMPACT, and that compensatory measures specified by existing program are of minimal benefit.
Currently specified compensatory measures may be reduced to match the risk-significance of the impairment.
16
Ot,-
Thoughts on Licensing Issues (Cont.)
O Impairnent Scenario (cont.)
- RI FP Compliance Process, applying the concept of minimal increase in risk (RG 1.174),
indicates that the compensatory measures can be reduced without adversely affecting the ability to achieve and maintain safe shutdown.
- We propose that no prior NRC approval necessary for this change.
- How comfortable is the NRC with industry use of RG 1.174 approach to Fire Protection LBIE?
There is no industry guidance as to whether PRA can be used to answer the Fire Protection LBIE "no adverse affect question". The WOG team is proposing a risk-informed approach similar to the 50-59 process.
17