ML033100158
| ML033100158 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/22/2003 |
| From: | Office of Nuclear Material Safety and Safeguards |
| To: | |
| References | |
| FOIA/PA-2003-0395, NMSS-02-A-0002, RIII-02-A-0005 | |
| Download: ML033100158 (1) | |
Text
CASE CHRONOLOGY Page 1 ALLEGATION NUMBER:
NMSS-2002-A-0002
[FACILITY:
Holtec 11 U. S. Tool & Die DATE l
ACTIVITY l
SECTION 1
03/04/2002 Wayne Hodges phone call from alleger Algr docs 03/08/2002 Rec'd Rill-2002-A-0005 Concerns 1 & 8 from RilAlgr docs 03/13/2002 Alleger meeting w/ Wayne Hodges, SFPO Notes 04/04/2002 ARB ARB 04/18/2002 Letter to alleger regarding additional information promised by Correspondence alleger that had not yet been received.
04/18/2002 Memo to Rill, request inspection assistance Correspondence 04/25/2002 OAC phone call from alleger Algr docs 04/25/2002 Rill letter to alleger re RII-2002-A-0005 Correspondence 05/02/2002 Status letter to alleger Correspondence 05/07/2002 OAC phone call from alleger re Inspection Notes 05/08/2002 Alleger email letter to Ril (forwarded by Rill 6/18/02)
Algr docs 05/28/2002 Closeout letter to alleger Correspondence 05/31/2002 Rill fax of material from alleger Algr docs 06/13/2002 Alleger email letter (rec'd 6/17/02) - Response after closure Algr docs 07/10/2002 Closeout letter to alleger - re 1 t response after closure Correspondence 08/19/2002 OAC phone call from alleger Algr docs 08/19/2002 Alleger email letter - further Response after closure Algr docs 08/22/2002-
-Alleger-email letter'further-explanation-to 8/19/02 letter ----
-Algrdocs -
09/23/2002 Closeout letter to alleger - re 2nd response after closure Correspondence