MISCELLANEOUS CORRESPONDENCE FOR THE POINT BEACH INITIAL EXAMINATIQN - SEPT 2003
D, / r e &Lc.c/
c 4 -
Wisconsin Electric Point Beach Nuclear Plant 6610 Nuclear Rd.
Two Rivers, WI 54241 Phone 920 755-2321 A WISCONSIN ENERGY COMPANY NPL 2000-0065 February 2,2000 Mr. D. E. Hills, Chief Operator Licensing Branch U. S. NUCLEAR REGULATORY COMMISSION Region I11 Sc) 1 b'arrewille %ad Lisle, IL 60532-435 1
Dear Mr. Hills:
.. 7 '
POINT BEACH NUCLEAR PLANT REQUEST FOR NRC PREPARATION OF OPERATOR LICENSING EXAMINATIONS In update to our response to NRC Administrative Letter 99-03, the following proposed initial operator licensing examinations and schedules for 2002 and 2003:
2002 2003 Number of Reactor Operator Applicants 6
3 3
Number of Senior Operator Applicants Number of Senior Operator Upgrade Applicants 4
3 1
We propose that the 2002 examinations be administered in January, while the 2003 examinations would be administered in May.
We would appreciate the NRC preparing these examinations. We understand, however, that because of resource constraints you may not be able to accommodate this request. Please notify us if you are unable to prepare the examinations or if there is a conflict with the proposed examination dates.
es & Licensing FAFMa
Nuclear Management Company, LLC Point Beach Nuclear Plant 66 10 Nuclear Road Two Rivers, WI 54241 NPL 2000-0416 September 18,2000 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Stop P1-137 Washington, DC 20055-00 1 LadiedGentlemen:
DOCKETS 50-266 AND 50-301 RESPONSE TO REGULATORY ISSUE
SUMMARY
2000-14 POINT BEACH NUCLEAR PLANT, UMTS 1 AND 2 Regulatory Issue Summary (RIS) 2000- 14, Preparation and Scheduling of Operator Licensing Examinations, was issued on September 6,2000. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning generic fundamentals examinations through CY 2002 and initial operator license examinations through CY 2004.
Attached is a completed NRC Form 536 that provides the requested information for Point Beach Nuclear Plant, Units 1 and 2 Dan Cole
- Manager, Site Assessment Attachment CC:
Chief, Operator Licensing Branch, NRC Region I11
Rc FORM
.m CY2002 CY 2001 PROPOSEDNUMEER 536 CY 2004 CY 2003 USNUCLEARREGULATORY COMMISSiON I
1 OPERATOR LICENSING EXAMINATION DATA I
I
\\CiI.irf Point Beach Nuclear Plant ALTERNATE DATE
\\. PROPOSED EXAMINATION PREPARATION SCHEDULE February June December NRC RE3W I11 C Y ~ 0 1 PROPOSED NUMBER FIRST SECOND THIRD I
0 (1 R0/1.ROC R0/1 SRO Emwm NUMBER OF LICENSEE-PREPARED MAMINATIONS cy 2 0 0 2 FIRST SECOND THIRD I
ESTIMATED NUMBER OF ECU(IN4TIONS NRC-PREP ARED I. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2004 1 R0/1 SRC NUMBER OF REACTOR OPERATORS 0
I NUMBER OF SENIOR REACTOR OPERATORS - INSTAKT 0
5 3
NUMBER OF SENIOR REACTOR OPERATORS - UPGRAOE O
I 4
3 NUMBER OF SENIOR REACTOR OPERATORS - UMITU)
I I
I I
I I
PROPOSED DATES 1 January Povember I
PRIMARY DATE ESTIMATED NUMBER CF CANDIDATES J
e:
b,&
I
-k4YQ/dA Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC N
Cornminod to Nuclear Exce NRC 2001-067 September 27,2001 Document Control Desk U. S. Nuclear Regulatory Commission Mail Stop P1-137 Washington, DC 20055-001 Ladies/Gen tlemen:
DOCKETS 50-266 AND 50-301 POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 RESPONSE TO REGULATORY ISSUE
SUMMARY
300 1-17 Regulatory Issue Summary (RIS) 2001-17, Preparation and Scheduling of Operator Licensing Examinations, was issued on August 22, 2001. The RIS asked that within 30 days licensees voluntarily submit schedular information concerning seneric fundamentals examinations through CY 2003 and initial operator license examinations through CY 2005.
Attached is a completed NRC Form 536 that provides the re.quested information for Point Beach Nuclear Plant, Units 1 and 2 Thomas J. Webb Licensing Director Attachment FAF/tyf cc:
Chief, Operator Licensing Branch, NRC Region III 6590 Pluclear Road L v o Rivers. Wisconsin 52241 Telephone : 3 20.7.5.5.3 32 1 Page 1 of 1 NRC 2001-067 NRC FORM 536 (8-2000)
US. NUCLEAR REGULATORY COMMISSION CY 2 CY 3 OPERATOR LICENSING EXAMiNATlON DATA CY 3 CY 5 FACILITY 1
APPROVED BY OMB:.NO. 3150-0131 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records Management Branch (T-6 6). U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail io bjsl Onrc.gov. and to the Desk Officer, Office of Information and Regulatory AHairs, NEOB-10202, (3150-0131). Office of Management and Budget.
Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
EXPIRES: 07/31/2002 I NRCREGION 1
0 1
Point Beach Nuclear Plant. Units 1 and 2 I
111 0
A. PROPOSED EXAMIb PROPOSED NUMBER 0
0 0
ESTIMATED NUMBER OF LICENSEE-PREPARED CY 2 CY 3 CY 4 EXAMINATIONS ESTIMATED NUMBER OF CY$
NRC-PREPARED 5
EXAMINATIONS B. INITIAL OPERATOR 2
0 3
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 3
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2
0 3
NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3
NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 2
0 3
PROPOSED DATES PRIMARY DATE 0
ALTERNATE DATE 0
0 0
1/2002 9/2003 N/A 6/2005 CY 02 PROPOSED NUMSER FIRST SECOND THIRD ESTIMATED NUMBER OF CANDIDATES 4
0 0
CY 03 FIRST SECOND THIRD 0
0 0
0 I
1 I
a2002 I
10/2003 I N/A I
7/2005
November 30, 2001 Mr. M. Reddemann Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 661 0 Nuclear Road Two Rivers, WI 54241
SUBJECT:
CALENDAR YEAR 2003 SCHEDULING OF NRC REGION Ill LICENSED OPERATOR EXAMINATIONS
Dear Mr. Reddemann:
The purpose of this letter is to enlist your support in the scheduling of calendar year 2003 initial licensed operator examinations in NRC Region Ill. The enclosure of this letter lists requests received from Region Ill facility licensees for licensed operator examinations for that calendar year. A large number of those examination requests fall within the months of September through December 2003. In addition, Region Ill facility licensees have provided us with projected dates during which they would expect to conduct licensed operator requalification examinations during that year. This information indicates that the NRC operator licensing staff would need to conduct six of the eight calendar year 2003 Region Ill licensed operator requalification baseline inspections during those same months. Consequently, the projected workload for the Region Ill operator licensing examiners during the final quarter of calendar year 2003 will be difficult to accomplish.
We have contacted the other NRC regional and headquarters offices to ascertain the availability of qualified examiners from outside Region Ill. Based on current projections, we can accommodate the majority of the exams near the requested dates, but will have to schedule several exams approximately two months prior to or beyond the requested quarter.
Before we finalize the calendar year 2003 exam dates, we want to provide you the opportunity to re-evaluate your training and examination schedule and determine whether you can realign your request to outside the fourth calendar quarter of 2003. Please contact us to revise or reaffirm your request by calling Mr. David Hills (630-829-9733) of my staff within fifteen days of the date of this letter. We will proceed with scheduling the calendar year 2003 examinations after December 15,2001.
OFFICE Rlll Id Rlll AJ I I
I NAME DEHills:sd J G r o b b - i v DATE 1 1 ~ 0 1 1 1 / S O J In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.aov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely, John A. Grobe, Director Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
List of 2003 Examinations Requested cc w/enci:
R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager F. Cayia, Plant Manager K. Hoops, Manager, Kewaunee Plant J. O'Neill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer W. Parks Walker, Training Department DOCUMENT NAME: G:DRS\\Poil 1-0ldrs.wpd
ADAMS Distribution:
WDR DFT BAW JGLI RidsNrrDipmlipb GEG HBC PGKI JFL C. Ariano (hard copy)
DRPlll DRSlll PLBI JRKl M. Bies (Concurrence Copy)
February 20,2002 Mr. M. Reddemann Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
Dear Mr. Reddemann:
In response to your facility management letter dated September 27, 2001, and as augmented by discussions with Chuck Sizemore of your staff on January 10, 2002, we have tentatively scheduled an initial licensing examination for your operator license applicants at the Point Beach Nuclear Plant during the week of October 20, 2003. Validation of the examination will occur at the station during the week of September I, 2003. In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of August 18, 2003, to begin our review of your submitted examination.
Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.
Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.
Dell McNeil has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9737.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell McNeil of my staff at 630-829-9737.
OFFICE RIII:DRS I d RII1:DRS I,.L, DATE 02/y/02 02//9/02 02/202 NAME MABies:sd fld&-
DRMcNeil 8-"
DEHills ON---
1 In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/NRC/ADAMS/index.htmI (the Public Electronic Reading Room).
Sin cere I y,
David E. Hills, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:
R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager A. Cayia, Site Director J. O'Neill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department
M. Reddemann ADAMS Distribution:
WDR DFT BAW RidsNrrDipmlipb GEG HBC PGKI DRPlll DRSlll PLBI JRKI DCT M. A. Bies, DRS
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 Mr. M. Warner Site Vice President Kewaunee and Point Beach Nuclear Plants Nuclear Management Company, LLC 661 0 Nuclear Road Two Rivers, WI 54241
Dear Mr. Warner:
May 13, 2002 In response to a telephone conversation that I had with Mr. Chuck Sizemore, Training Supervisor, on May 6, 2002, we have tentatively rescheduled an initial licensing examination for your operator license applicants at the Point Beach Nuclear Plant during the week of September 29, 2003. Validation of the examination will occur at the station during the week of August 25, 2003. In the unlikely event that we are unable to support the examination during the scheduled week, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
As stated in your letter dated September 27, 2001 I your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of August 11, 2003, to begin our review of your submitted examination.
Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.
Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.
Mr. Michael E. Bielby has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9762.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell R. McNeil of my staff at 630-829-9737.
M. Warner OFFICE RIII:DRS 1 ('/
RI II: DRS I fJ RI1I:DRS
,d RIII:DRS NAME MABies:sd w' DRMcNeil DEHills DATE 051 9/02 05& 102 054 9/02 In accordance with IO CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index. html (the Public Electronic Reading Room).
Sincerely, David E. Hills, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc:
R. Grigg, President and Chief Operating Officer, WEPCo R. Anderson, Executive Vice President and Chief Nuclear Officer T. Webb, Licensing Manager D. Weaver, Nuclear Asset Manager T. Taylor, Plant Manager A. Cayia, Site Director J. O'Neill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer W. Walker, Training Department
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 May 15, 2003 Mr. Alfred J. Cayia Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
Dear Mr. Cayia:
In a telephone conversation on May 2, 2003 between Mr. C. Sizemore, Operations Training Supervisor, and Mr. M. Bielby, Chief Examiner, arrangements were made for the administration of licensing examinations at the Point Beach Nuclear Plant the week of September 29, 2003. In addition, the NRC will make an examination validation visit to your facility the week of August 18, 2003.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by June 26, 2003. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by August 11, 2003.
Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 31 50-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
OFFICE [Rlll Id I Rlll I dl I 1 examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
NAME DATE This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on May 31, 2003.
MBielby:aa hc,j, RLanksburyqA 'k 05/7/03 05/&03 v-.
The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (31 50-001 8),
Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. C. Sizemore has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bielby at 630-829-9762, or me at 630-829-9631.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readinn-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 OFFICIAL RECORD COPY
cc:
R. Grigg, President and Chief Operating Officer, WEPCo J. Cowan, Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager J. Jensen, Plant Manager G. Arent, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel M. Nazar, Senior Vice President J. ONeill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer R. C. Milner, Training Department ADAMS Distribution:
WDR DCT DFT DWS Rids NrrDipm 1 i pb GEG HBC PGKl DRPlll DRSlll PLBl JRKl M. A. Bies, DRS
June 9,2003 Mr. Alfred J. Cayia Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, VVI 54241-9516
Dear Mr. Cayia:
Our previous letter dated May 15, 2003, identified that preparation of your licensing examination would be based on the guidelines in Revision 8, Supplement 1, of NUREG-I 021, Operator Licensing Examination Standards for Power Reactors. However, in a subsequent telephone conversation on May 27, 2003, between Mr. Michael Bielby, Chief Examiner, and Mr. Chuck Sizemore, Training Supervisor, we understand that you will prepare the examination based on the guidelines in Revision 9 of NUREG-1021. The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Thank you for your cooperation in this matter. Mr. C. Sizemore has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact M. Bielby at 630-829-9762, or me at 630-829-9631.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by DMcNeil Acting for/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 See Attached Distribution
2 A. Cayia OFFICE Rlll I mI Rlll 1t.l NAME MBielby:sd RLanksbury DATE 06/4/03 06/@/03
-(d I.,
I I
cc:
R. Grigg, President and Chief Operating Officer, WEPCo J. Cowan, Chief Nuclear Officer Licensing Manager D. Weaver, Nuclear Asset Manager J. Jensen, Plant Manager G. Arent, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel M. Nazar, Senior Vice President J. O'Neill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks D. Graham, Director Bureau of Field Operations A. Bie, Chairperson, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution:
WDR DFT DWS RidsNrrDipmlipb GEG HBC PGKI DRPlll DRSlll PLBl JRKI