November 19, 2003 Mr. Robert P. Powers Executive Vice President - Generation Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107-1395
SUBJECT:
ORDERS MODIFYING LICENSES FOR REVISED DESIGN BASIS THREAT AND FOR TRAINING AND PHYSICAL FITNESS ENHANCEMENTS APPLICABLE TO SECURITY FORCE PERSONNEL (TAC NOS. MB9281, MB9282, MB9385 AND MB9386)
Dear Mr. Powers:
On April 29, 2003, the U.S. Nuclear Regulatory Commission (NRC or the Commission) issued Orders modifying the operating licenses for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 to: (1) require compliance with a revised design basis threat (DBT); (2) implement new security force personnel training and physical fitness requirements; and (3) prescribe compensatory measures related to fitness-for-duty enhancements applicable to security force personnel.
When it issued the Orders, the Commission recognized that you voluntarily and responsibly implemented additional security measures following the events of September 11, 2001.
However, as part of the Commissions review of the security and safeguards program, the Commission determined that enhancements to the DBT, as currently specified in Title 10 of the Code of Federal Regulations (10 CFR), Section 73.1(a), were required. The NRC further determined that security force personnel tactical and firearms proficiency, physical fitness, and fitness-for-duty requirements needed to be enhanced. The Commission also concluded that, based on the current threat environment, these Orders were to be effective immediately.
The Orders require responses and actions within specified time frames. This letter addresses your response to the Orders pertaining to the revised DBT and the new security force personnel training and physical fitness requirements. The Commission replied to your response to the fitness-for-duty Order in separate correspondence, dated July 10, 2003.
Section III.A.1 of the Order implementing new security force personnel training and physical fitness requirements states that licensees must comply with the new requirements described in the Order, except to the extent that more stringent requirements are set forth in the licensees security plan and security training and qualifications plan.Section III.A.1 of the DBT Order requires licensees to submit revised physical security plans, safeguards contingency plans, and guard training and qualification plans, including an implementation schedule, based on the revised DBT, to the Commission for review and approval no later than April 29, 2004. The Order requires licensees to implement the revised physical security plans, revised safeguards contingency plans, and revised security force personnel training and qualification plans no later than October 29, 2004.Section IV of both Orders noted that, in accordance with
10 CFR 2.202, licensees must submit an answer to the Orders and may request a hearing on the Orders, within thirty-five (35) days of the date of the Orders and, where good cause is shown, consideration would be given to extend the time to request a hearing.
The Orders also required licensees to notify the Commission within thirty-five (35) days if:
(1) the licensee was unable to comply with the requirements specified in the attachments to the Orders; (2) compliance with the requirements is unnecessary; (3) implementation of any of the requirements would result in a violation of the provisions of any Commission regulation of the facility license; or (4) implementation of any of the requirements described in the attachments to the Orders would adversely impact safe operation of the facility.Section III.C.1 of the security force personnel training and physical fitness Order required licensees to submit to the Commission, within thirty-five (35) days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.
By letters dated May 30, 2003, you submitted responses to the Orders for the Donald C. Cook Nuclear Plant. In your responses, you indicated that you consented to the DBT and security force personnel training Orders and did not request a hearing. The NRC staff has reviewed your responses, and finds that you have satisfied the thirty-five (35) day reporting requirements for both Orders.
In your response to the DBT Order, you also requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. By letter dated September 25, 2003, the NRC provided you a copy of Chairman Diazs response to Mr. Colvin, dated July 18, 2003, which clarified the five DBT-related issues.
Please contact Robert Fretz at 301-415-1324, if you have any other questions on these issues.
Sincerely,
/RA/
Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316 cc: See next page
10 CFR 2.202, licensees must submit an answer to the Orders and may request a hearing on the Orders, within thirty-five (35) days of the date of the Orders and, where good cause is shown, consideration would be given to extend the time to request a hearing.
The Orders also required licensees to notify the Commission within thirty-five (35) days if:
(1) the licensee was unable to comply with the requirements specified in the attachments to the Orders; (2) compliance with the requirements is unnecessary; (3) implementation of any of the requirements would result in a violation of the provisions of any Commission regulation of the facility license; or (4) implementation of any of the requirements described in the attachments to the Orders would adversely impact safe operation of the facility.Section III.C.1 of the security force personnel training and physical fitness Order required licensees to submit to the Commission, within thirty-five (35) days of the date of the Order, a schedule for achieving compliance with each requirement described in Attachment 2 to the Order.
By letters dated May 30, 2003, you submitted responses to the Orders for the Donald C. Cook Nuclear Plant. In your responses, you indicated that you consented to the DBT and security force personnel training Orders and did not request a hearing. The NRC staff has reviewed your responses, and finds that you have satisfied the thirty-five (35) day reporting requirements for both Orders.
In your response to the DBT Order, you also requested that the NRC provide clarification of five DBT-related issues described in the safeguards attachment to a letter from Mr. Colvin, President and CEO of the Nuclear Energy Institute, to Chairman Diaz dated May 16, 2003. By letter dated September 25, 2003, the NRC provided you a copy of Chairman Diazs response to Mr. Colvin, dated July 18, 2003, which clarified the five DBT-related issues.
Please contact Robert Fretz at 301-415-1324, if you have any other questions on these issues.
Sincerely,
/RA/
Ledyard B. Marsh, Director Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316 cc: See next page DISTRIBUTION:
PUBLIC TMarsh DLPM Project Directors GGrant, Region III OGC CHolden DLPM Section Chiefs PD Reading Files ACRS JClifford DLPM Project Managers GTracy, NSIR RFretz VNerses DLPM Licensing Assistants JPeralta, NSIR ADAMS Accession Number: ML032970126
- See previous concurrence OFFICE PDI-2/LPM PDI-2/LA PDI-2/SC*
NSIR/DNS*
PDI/D*
DLPM/D NAME RFretz CRaynor JClifford GTracy CHolden LMarsh DATE 11/13/03 11/13/03 10/30/03 11/03/03 11/07/03 11/14/03 OFFICIAL RECORD COPY
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Director, Design Engineering and Regulatory Affairs Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P. O. Box 30241 Lansing, MI 48909-7741 David A. Lochbaum Nuclear Safety Engineer Union of Concerned Scientists 1707 H Street NW, Suite 600 Washington, DC 20036 Michael J. Finissi, Acting Site VP and Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Robert P. Powers American Electric Power Executive Vice President - Generation Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107