% TM Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem (Boulevard Berwick,PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson @pplweb.com October 14,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005685 The September 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman I ea
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/13/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.
2.
3.
4.
Unit Name:
Susquehanna Steam Electric Station (Ul)
Reporting Period:
September 2003 Design Electrical Rating (Net MWe):
1115 Maximum Dependable Capacity (Net MWe):
1105 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 580.3 561 0
571,945 Yr.-to-Date 6,551 6,411.3 6,376.7 0
6,925,157 Cumulative 178,080 148,275.8 146,030.5 0
150.178,686 NOTES:
Page 1 of 1
S.*s I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 10/13/2003 J. J. Hennings (570) 542-3747 REPORT MONTH September 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down
____________R eactor 3 1
9/24/03 F
159 G
3 Unplanned automatic scram due to low reactor water level following an inadvertent trip of a Feedpump during Feedpump testing. Human Performance items were addressed. Plant equipment checks were performed and evaluations concerning equipment operating margins were initiated.
Summary: Other than the September 24 scram an unplanned manual power reduction to 60% power was performed on 9110103. The power reduction was due to a small fire at the "B" Reactor Feedpump Turbine which required shutting the Feedpump down.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
1 -Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page 1 of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
10/13/03 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
'P.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/13/03 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U2)
- 2.
Reporting Period:
September 2003
- 3.
Design Electrical Rating (Net MWe):
1182*
- 4.
Maximum Dependable Capacity (Net MWe):
1140*
5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 720 720 720 0
818,701 Yr.-to-Date 6,551 5,537.4 5,492.9 0
6,086,664 Cumulative 163,320 141,686.8 139,699.6 0
146,197,658 NOTES:
- During the U2 1 1 Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. The Design Rating and Maximum Dependable Capacity rating changed following the analysis of the official Performance/Acceptance Test performed in early June. Maximum Dependable Capacity rating is now 1140 MWe Net. The Design Electrical Rating of 1182 MWe Net is the nominal value identified in the FSAR (1220 MWe Gross) and corresponds closely to the Winter Production Rating.
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 10/13/2003 J. J. Hennings (570) 542-3747 REPORT MONTH September 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: The only significant power change in September was for a planned Control Rod Sequence Exchange on 9/6/03. Power was reduced to approximately 68%, and returned to 100% power on 9/7/03.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of I
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date-10113/2003 Completed by:
J. J. Hennings Telephone:
(570) 542-3747 Chal!enges to Main Steam Safety Relief Valves None.