September 2003 Monthly Operating Report for Perry Unit 1
ML032950334
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/14/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2740L
Download: ML032950334 (3)


Text

s s

FENOC

~ ~~~~~~~~~~~~~~~~~~~

Nuclear Power Plant FENOC 10 Center Road RO. Box 97 FrstEnergy Nuclear Operating Comlpany Perry, Ohio 44081 October 14, 2003 PY-CEI/NRR-2740L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the September 2003 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

10/9/03

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period: September 2003

4.

Utility

Contact:

T. Phelps

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

7.

Maximum Dependable Capacity (Net MWe):

1260 1235 This Month -

8.

Hours Reactor was Critical 720.0

9.

Hours Generator On-Line 720.0

10.

Unit Reserve Shutdown Hours 0.0

11.

Net Electrical Enerav (MWeH) 809.632.0

-Yr;to-Date 5.132.2 5.032.0 0.0 5.840,204.0 Cumulative 110.035.7 107.302.3 0.0 122.415.9;415.0 Page 1

I0 UNIT SHUTDOWNS REPORT MONTH - September 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/9/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours

2) 3 I

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

SUMMARY

The Perry Plant was on line the entire month of September.
1. TYPE:
2. REASON:

l

3. M F: Forced A - Equipment Failure (explain) 1 S: Scheduled B - Maintenance or Testl 2

C - Refueling 3

D - Regulatory 4

E - Operating Training &

5 License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

ETHOD:

- Manual

- Manual Scram

- Automatic Scram

- Continuation

-Other Page 2