Text
s s
~ ~~~~~~~~~~~~~~~~~~~
Nuclear Power Plant FENOC 10 Center Road RO. Box 97 FrstEnergy Nuclear Operating Comlpany Perry, Ohio 44081 October 14, 2003 PY-CEI/NRR-2740L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the September 2003 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
10/9/03
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: September 2003
- 4.
Utility
Contact:
T. Phelps
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
- 7.
Maximum Dependable Capacity (Net MWe):
1260 1235 This Month -
- 8.
Hours Reactor was Critical 720.0
- 9.
Hours Generator On-Line 720.0
- 10.
Unit Reserve Shutdown Hours 0.0
- 11.
Net Electrical Enerav (MWeH) 809.632.0
-Yr;to-Date 5.132.2 5.032.0 0.0 5.840,204.0 Cumulative 110.035.7 107.302.3 0.0 122.415.9;415.0 Page 1
I0 UNIT SHUTDOWNS REPORT MONTH - September 2003 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/9/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours
- 2) 3 I
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SUMMARY
- The Perry Plant was on line the entire month of September.
- 1. TYPE:
- 2. REASON:
l
- 3. M F: Forced A - Equipment Failure (explain) 1 S: Scheduled B - Maintenance or Testl 2
C - Refueling 3
D - Regulatory 4
E - Operating Training &
5 License Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
ETHOD:
- Manual
- Automatic Scram
- Continuation
-Other Page 2