Re Rescheduling of a Planned Baseline Inspection
ML032940107
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/19/2003
From: Dave Hills
NRC/RGN-III/DRS/MEB
To: Peifer M
Nuclear Management Co
References
Download: ML032940107 (7)


Text

October 19, 2003 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324

SUBJECT:

RESCHEDULING OF A PLANNED BASELINE INSPECTION

Dear Mr. Peifer:

We have rescheduled a biennial heat sink inspection at your Duane Arnold Energy Center.

This change was communicated during a telephone conversation between Mr. R. Murell of your staff and Mr. G. ODwyer on October 8, 2003. The inspection to review the plants heat sink performance, originally scheduled for the week of October 20, 2003, has been rescheduled for the week of November 17, 2003. Please provide the information as specified in the attached list. The requested information is needed to support the inspection. If you have any questions regarding our schedule or the material being requested, please contact G. ODwyer of my staff at (630) 829-9624.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49

Enclosure:

Requested Information to Support Heat Sink Inspection See Attached Distribution

October 19, 2003 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324

SUBJECT:

RESCHEDULING OF A PLANNED BASELINE INSPECTION

Dear Mr. Peifer:

We have rescheduled a biennial heat sink inspection at your Duane Arnold Energy Center.

This change was communicated during a telephone conversation between Mr. R. Murell of your staff and Mr. G. ODwyer on October 8, 2003. The inspection to review the plants heat sink performance, originally scheduled for the week of October 20, 2003, has been rescheduled for the week of November 17, 2003. Please provide the information as specified in the attached list. The requested information is needed to support the inspection. If you have any questions regarding our schedule or the material being requested, please contact G. ODwyer of my staff at (630) 829-9624.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-331 License No. DPR-49

Enclosure:

Requested Information to Support Heat Sink Inspection See Attached Distribution DOCUMENT NAME: G:\\DRS\\ML032940107.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E RIII RIII NAME GODwyer:tr BBurgess DHills DATE 10/17/03 10/17/03 10/19/03 OFFICIAL RECORD COPY

M. Peifer cc w/encl:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

J. Cowan, Chief Nuclear Officer T. Palmisano, Senior Vice President J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel B. Lacy, Nuclear Asset Manager Chairman, Linn County Board of Supervisors State Liaison Officer Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Representative

M. Peifer cc w/encl:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

J. Cowan, Chief Nuclear Officer T. Palmisano, Senior Vice President J. Bjorseth, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel B. Lacy, Nuclear Asset Manager Chairman, Linn County Board of Supervisors State Liaison Officer Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Representative ADAMS Distribution:

WDR DFT DSH RidsNrrDipmIipb GEG HBC GAW1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1

Enclosure 1

Initial Document Request I.

Information Requested Expeditiously The following information is requested to be provided as soon as possible, but no later than November 7, 2003, to support the biennial "Heat Exchanger Performance" inspection procedure 71111.07. Information should be provided for the selected heat exchangers: 1E053B3 Jacket CLNG water heat exchanger and 1E201B - RHR Heat Exchanger B. In so far as possible, information should be provided electronically.

1.

Copies of the procedures used to monitor or inspect heat exchanger performance.

2.

A list of issues, with a short description, associated with heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing that are documented in your corrective action system. (since last biennial inspection) 3.

Copy of system description and/or design basis document for the heat exchangers under review (as applicable).

II.

Information Requested to be Available on First Day of Inspection We request that the following information be available to the inspector once he arrives onsite November 17, 2003:

1.

Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance monitored. Include documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for these tests. (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests. Include drawings showing the piping configurations and flowpaths for normal operation and testing for the HXs. Also indicate where the instruments used for the tests were located. Describe the measures to ensure proper fluid mixing for temperature considerations.

2.

Copy of the evaluations of data for the two most recent completed tests confirming the thermal performance of each heat exchanger.

3.

Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers.

4.

Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria).

5.

The clean and inspection maintenance schedule for each heat exchanger.

Enclosure 2

6.

Copy of the document describing the inspection results for the last two clean and inspection activities completed on each heat exchanger.

7.

Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger.

8.

Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger.

9.

Copy of the design specification and as-built heat exchanger data sheets for each heat exchanger.

10.

Copy of the vendor/component drawings for each heat exchanger.

11.

Copy of the calculations which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping.

12.

Copy of heat exchanger performance trending data tracked for each heat exchanger.

13.

Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers.

14.

Copies of the documents that verify the following for the ultimate heat sink:

sufficient reservoir capacity; provision to ensure freedom from clogging due to macrofouling (silt, mussel shells, debris, etc.);

provisions controlling for biotic fouling; and functionality during adverse weather conditions, e.g., icing or high temperatures.

If the information requested above will not be available, please contact Gerard ODwyer as soon as possible at (630) 829-9624 or E-mail - gfo@NRC.gov.