Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group October 15, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 September 2003 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 5.6.4.
Should you have questions, please contact Mr. Thomas S. O'Meara at (410) 495-6940.
Very truly yours, KJN/CAN/bjd Attachments cc:
J. Petro, Esquire J. E. Silberg, Esquire Director, Project Directorate I-l, NRC G. S. Vissing, NRC H. J. Miller, NRC Resident Inspector, NRC R. l. McLean, DNR J. Wright, INPO K. N. Larson, ANI J--Ioaq-
I OPERATING DATA REPORT Docket No. 50-317 Calvert Cliffs Unit 1 October 1, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
SEPTEMBER 2003 845 825 Year-to-Date Cumulative to Date This month 1.
2.
3.
4.
NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED(MWH) 720.0 720.0
- 0. 0 607,094 6,551.0 6,551.0 0.0 5,628, 864 189, 840.4 186,676.7 0.0 152,796,127
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-317 Calvert Cliffs - UI October 1, 2003 Herman 0. Olsen (410) 495-6734 REPORTING MONTH September 2003 NO.
DATE TYPE DURATION REASON' METHOD OF CAUSE/CORRECTIVE ACTIONS F:
FORCED (HOURS)
SHUTTING S:
SCHEDULED DOWN 2 COMMENTS There were no shutdowns this month.
' Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2 Method:
I - Manual 2 - Manual Scram.
3 - Automatic Scram.
4 - Continued 5 - Other
DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I October 1, 2003
SUMMARY
OF OPERATING EXPERIENCE September 2003 The unit began the month at 100% power.
Power was reduced to approximately 96% on 09/06/2003 at 0200 for Moderator Temperature Coefficient Testing (PSTP-4). Testing was completed and the unit returned to 100% power on 09/07/2003 at 1321.
I~~~~~~~~~~~~~~~~~~~
OPERATING DATA REPORT Docket No. 50-318 Calvert Cliffs Unit 2 October 1, 2003 Prepared by Herman 0. Olsen Telephone:(410)495-6734 REPORTING PERIOD DESIGN ELECTRICAL RATING (NET MWe)
MAXIMUM DEPENDABLE CAP'Y (NET MWe)
SEPTEMBER 2003 845 835 Year-Cumulative to-Date to Date This month 720.0 4,958.0
- 1.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 2. HOURS GENERATOR ON LINE
- 3. UNIT RESERVE SHUTDOWN HOURS
- 4. NET ELECTRICAL ENERGY GENERATED(MWH) 720.0 0.0 4,924.5 0.0 182,517.8 180,629.2 0.0 148,807,360 619,244 4,220,930
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-318 Calvert Cliffs-U2 October 1, 2003 Herman 0. Olsen (410) 495-6734 REPORT MONTH September 2003 I Reason:
A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error H - Other 2
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Other
DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 October 1, 2003
SUMMARY
OF OPERATING EXPERIENCE September 2003 The unit began the month at 100% reactor power.
Power was reduced to approximately 87% on 09/06/2003 at 2228 for Main Turbine Valve Testing.
Testing was completed and the unit returned to 100% power on 09/07/2003 at 0200.