ML032880066

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment Nos. 203, 195, 218 and 212, Revising the Technical Specifications to Relax the 24-Month Surveillance Frequency of Instrumentation Line Excess Flow Check Valves
ML032880066
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 10/10/2003
From:
NRC/NRR/DLPM/LPD3
To:
References
TAC MB7732, TAC MB7733, TAC MB7734, TAC MB7735
Download: ML032880066 (2)


Text

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.4 Verify continuity of the traversing 31 days incore probe (TIP) shear isolation valve explosive charge.

SR 3.6.1.3.5 Verify the isolation time of each power In accordance operated, automatic PCIV, except for with the MSIVs, is within limits. Inservice Testing Program SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance 2 3 seconds and s 5 seconds. with the Inservice Testing Program SR 3.6.1.3.7 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.8 Verify-a representative sample of reactor 24 months instrumentation line EFCVs actuate to the isolation position on an actual or I

simulated instrument line break signal.

SR 3.6.1.3.9 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS (continued)

Dresden 2 and 3 3.6.1.3-8 Amendment No.203/195

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.4 Verify continuity of the traversing 31 days incore probe (TIP) shear isolation valve explosive charge.

SR 3.6.1.3.5 Verify the isolation time of each power In accordance operated, automatic PCIV, except for with the MSIVs, is within limits. Inservice Testing Program SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance

> 3 seconds and s 5 seconds. with the Inservice Testing Program SR 3.6.1.3.7 Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.8 Verify a representative sample of reactor 24 months instrumentation line EFCVs actuate to the isolation position on an actual or I

simulated instrument line break signal.

SR 3.6.1.3.9 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System. BASIS (continued)

Quad Cities 1 and 2 3.6. 1.3-7 Amendment No. 218/212