ML032870042

From kanterella
Jump to navigation Jump to search
Response to Request for Information Regarding NRC RIS 2003-14, Dtd 09/29/03
ML032870042
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/29/2003
From: Peschel J
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Conte R
References
NYN-03083, RIS-03-014
Download: ML032870042 (3)


Text

RECEIVED REG!ON 1 FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000

"-03 0 8 3 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001 Seabrook Station ResDonse to Request for Information Regarding NRC US 2003-14 On August 27, 2003, the NRC issued Regulatory Issue Summary 2003-14, "Preparation and Scheduling of Operator Licensing Examinations."

This RIS requested information from licensees regarding proposed licensed operator examination schedules and estimated number of applicants, to assist the NRC in planning resources.

Accordingly, enclosed is the requested information.

Should you have any questions regarding this matter, please contact me at (603) 773-7194.

Very truly yours, FPL Energy Sea ok, LLC p

s M. Peschel Regulatory Programs Manager cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G. T. Dentel, NRC Senior Resident Inspector an FPL Group company

ENCLOSUm 1 TO NYN-03083

NRC FORM 536 (5-2[)03)

U S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA Seabrook Station I

APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/200!

Estimated burden per res onse to comply with this, voluntary informatio collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Chis information collection IS used to plan budget and resources for operator examinations. Send comments re arding burde estimate to the Records Management Branch (T-6 E6). U.S. NuJear Regulator Commission, Washington, DC 20555-0001, or by internet e-mall t infocoilects@nrc.gov. and to the Desk Officer, Office of Information an Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management an Budget, Washington, DC 20503.

If a means used to impose an informatio collection does noi display a currently valid OM8 control number, the NRC ma not conduct or sponsor, and a person is not required to respond to. th Information collection.

1

~

A. PROPOSED EXAMINATION PREPARATION SCHEDULE cy 2,005 cy 2,006 cy 2,007 CY 2,004 -

PROPOSED NUMBER ESTIMATED NUMBER OF WMINATIONS ESTIMATED NUMBER OF WMINATIONS 0

1 0

1 0

0 0

0 LICENSEE-PREPARED NRC-PREPARED

-I JUNE SEPTEMBER DECEMBER le. INITIAL OPERATOR LICENSE EXAMINATIONS CY MARCH SEPTEMBER DECEMBEF cy 2,004 -

PROPOSED NUMBER I

NUMBER OF REACTOR OPERATORS 0

I I

I NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0

NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0

NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE lo I I

0 4

1 0

01 /31/2005

-I--

8 4

0 0

05/14/2007

~

05/2 1 /2007 IC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

ESTIMATED NUMBER OF I CANDIDATES I NRC FORM 536 (5-2003)

PRINTED ON RECYCLED PAPER