ML032820346

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Revision 17A
ML032820346
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/07/2003
From: Meier M
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-03001609
Download: ML032820346 (2)


Text

NuclearOperting Company SAFE South erns Pro/ed Ekdrc GenemtIng S1 PO. Bx 289 MS worh Ter 77483 UARDS INFORMATION I

MM-M-1 October 7, 2003 NOC-AE-03001609 10CFR73.55 10CFR50.54(p)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED South Texas Project Units 1 and 2 Docket Nos. STN 50-498 and STN 50-499 Physical Security Plan. Revision 17A Enclosed are the original and three (3) copies of the South Texas Project (STP) Physical Security Plan, Revision 17A. Two (2) copies of the plan revision are being forwarded to Nuclear Regulatory Commission Region IV, Regional Administrator and a copy is being forwarded to the Region IV Senior Physical Security Inspector.

STP Nuclear Operating Company (STPNOC) has re-evaluated the current defensive strategy and started implementation of the new defensive strategy to defend against the revised design basis threat described in the April 29, 2003, Order (EA-03-086). This revision contains an interim change that further describes how STPNOC is integrating the requirements of the Interim Compensatory Measures Order (EA-02-026) with the revised DBT Order requirements.

The change does not decrease the safeguards effectiveness of the plan. Therefore, it is being submitted in accordance with 10CFR50.54(p)(2).

The Physical Security Plan and List of Changes provided with this letter require protection as Safeguards Information in accordance with 1 OCFR73.21.

If you have any questions, please contact Mr. P. L. Serra at (361) 972-8053 or me at (361) 972-8720.

Michael D. Meier General Manager, Station Support

Enclosures:

1.

List of Changes for Physical Security Plan (Safeguards Information)

2.

Physical Security Plan, Revision 17A (Safeguards Information) 0 I SAFEGUARDS INFORMATION l STI:31656827

I SAFEGUARDS INFORMATION I

NOC-AE-03001609 Page 2 of 2 cc: wout Attachment except *

(paper copy)

  • Bruce S. Mallett Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
  • U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 (electronic copy)

A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

  • G. Pick Senior Physical Security Inspector, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED I SAFEGUARDS INFORMATION l