ML032810539

From kanterella
Jump to navigation Jump to search
Stations - Response to NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations
ML032810539
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 10/01/2003
From: Funderburk C
Dominion Resources
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-467, RIS-03-014
Download: ML032810539 (4)


Text

Dominion Resources Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 ,4, Dominion-October 1, 2003 U.S. Nuclear Regulatory Commission Serial No.: 03-467 Attention: Document Control Desk NL&OS/MM Washington, D.C. 20555-0001 Docket Nos.: 50-280/281 50-338/339 License Nos.: DPR-32/37 NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION UNITS I AND 2 NORTH ANNA POWER STATION UNITS I AND 2 NRC REGULATORY ISSUE

SUMMARY

2003-14 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2003-14, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).

No new commitments are intended by this letter. If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.

Very truly yours, C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

for Virginia Electric and Power Company Attachments poc)3

cc: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St. SW, Suite 23T85 Atlanta, Georgia 30303-8931 Mr. C. Gratton NRC Senior Project Manager Mr. S. R. Monarque NRC Project Manager Mr. G. J. McCoy NRC Senior Resident Inspector Surry Power Station Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 071312005 Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden O PERATOR L CEN SING estimate to the Records Management Branch (T-6 E6). U.S. Nuclear Regulatory Commission. Washington, DC 20555-0001. or by Internet e-mail to EXAMINATION DATA Infocoliectsnrc.gov. and to the Desk Officer, Office of Information and Regulatory fairs, NEOB.10202, (3150-0131), Office of Management and Budget, Washington. DC 20503. If a means used to impose an hIformation collection does not display a currenty valid 0MB control number, the NRC ma not conduct or sponsor, and a person Is not required to respond to, the

_ _ ~~~~~~~~~~~~~inomaton collection.

FACILITY NRC REGION Surry Power Station Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2004 CY 2005 CY 2006 CY2007 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 Cy2005 Cy 2006 CY2007 NUMBER OF REACTOR OPERATORS 7 10 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 4 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 4 NUMBER OF SENIOR REACTOR OPERATORS - UMITED PROPOSED DATES PRIMARY DATE Feb. 23, 2004 Oct. 3, 2005 July 9, 2007 ALTERNATE DATE March 1, 2004 Oct. 10, 2005 July 16, 2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2004 Cy 2005 NUMBER MARCH JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 I

CANDIDATES - .

NRC FORM 536 ("203) PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07131005 (52003) Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments rearding burden OPERATOR LICENSING estimate to the Records Management Branch r-c E6) U.S.Internet Commission, Washington, DC 20555-0001. or by Nuear Regulatory e-mail to EXAMINATION DATA lnfocollects~nrc.gov. and to the Desk Officer, Office of Information and Regulatory Dfairs, NEOB-10202 (3150-0131), Office of Management and Budget. Washington. DC 20503. dfa means used t Impose en hformatlon collection does not disply a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the hformallon collection.

FACILITY NRC REGION North Anna Power Station Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 200 4 CY2005 CY2006 CY2007 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY2005 CY2006 CY 2 07 NUMBER OF REACTOR OPERATORS 6 12 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 2 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 5 4 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE June 21, 2004 April 24, 2006 Nov. 5, 2007 ALTERNATE DATE June 28, 2004 May 1 2006 Nov. 12, 2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2004 CY 2005 NUMBER MARCH l_JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEDE NUMBER OF CANDIDATES 14 NRC FORM 536 5-2003) PRINTED ON RECYCLED PAR