ML032810424

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations
ML032810424
Person / Time
Site: Sequoyah  
Issue date: 09/26/2003
From: Salas P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-03-014
Download: ML032810424 (3)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 September 26, 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C. 20555 In the Matter of Tennessee Valley Authority )

Docket Nos.50-327 50-328 SEQUOYAH NUCLEAR PLANT (SQN)

PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS NRC REGULATORY ISSUE

SUMMARY

(RIS) 2003-14 This letter is in response to the NRC RIS 2003-14 dated August 27, 2003.

The enclosure provides the requested information.

If you have any questions, please call me at J. D. Smith at (423) 843-6672.

(423) 843-7170 or and Industry Affairs Manager Enclosure cc:

See page 2

[A3 Pited on recyced paw

U.S. Nuclear Regulatory Commission Page 2 September 26, 2003 Enclosure cc (Enclosure):

Mr. Luis A. Reyes Regional Administrator, Region II ATTN: M. E. Ernstes U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931

1 NRC FORM Si6

&NUCLEAR REGULATORY COUAGSW0N1 APPROISD BY1WO S"ISI UPIRES rM11A f.:r-XD!

601"MI d b.*m.

fef ap a 40 don"y wAh Uan to f kSre.tn I ope4tw..qlae kwy. TWOibomaoo wlosm is wand to Olati bdet OPERATOR UCENSING I

' to.hBIwawty-S1 MU Nuac't.

oM EXAMINATION DATA of "l-o#"a t

eoEOlio S.

04k.

dltrIda ft C*Sg dn m=nt M thed ntoordu e nor aa~~.

  • nid
  • ersen h. not rqnwlr~d h. o.~pon4 b, tha K*.:,~~~~~~~~~~~~~~~kamIa

.akem Sequoyah Nuclear Plant Rll A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cr04 CY05 crO6 cO7 ESTMMATED NUMBER OF LICENSEE-PREPARED 1

1 J 0

EfM.TEDRUIMVIEROF hIROCPREPARED 0

0 0

EXAMNATIOS 00 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER C 04 cY'05 cr06 cr07 NUMBER OF REACTOR OPERATORS 8

O 8

O NUMBER OF SENIOR REACTOR OPERAORS ISTANT 1

0 0

0 NUMBER OF SENIOR REACTOR 4

OPERATORS; U-AOE 3

3 O

NUMBER OF SENIOR REACTOR OPERATORS - LTED 0

0 0

0 PROPOSED DATES PRIMARY MTE 06/07/04 04/18/05 04/17/06 N/A LT.ERNMf DATE 06/21/04 04/25/05 04/24/06 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION lts'f4mm !.%6 e-t