ML032801701

From kanterella
Jump to navigation Jump to search
Ltr - 10/07/03 Clinton Addendum 120 Day Notice Letter
ML032801701
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/07/2003
From: Lanksbury R
Division of Reactor Safety III
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
Download: ML032801701 (4)


Text

October 7, 2003 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Dear Mr. Skolds:

Our previous letter dated September 8, 2003, identified that preparation of the Clinton licensing examination would be based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." However, in a subsequent telephone conversation on September 29, 2003, between Mr. Hironori Peterson, Chief Examiner, and Mr. Ken McCall, Operations Training Manager, we understand that the examination will be prepared using the guidelines in Revision 9 of NUREG-1021. The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

Thank you for your cooperation in this matter. Mr. K. McCall has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. H. Peterson at 630-829-9707, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 See Attached Distribution

J. Skolds cc:

Site Vice President - Clinton Power Station Clinton Power Station Plant Manager Regulatory Assurance Manager - Clinton Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing T. Shortell, Training Manager

October 7, 2003 Mr. John L. Skolds, President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Dear Mr. Skolds:

Our previous letter dated September 8, 2003, identified that preparation of the Clinton licensing examination would be based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." However, in a subsequent telephone conversation on September 29, 2003, between Mr. Hironori Peterson, Chief Examiner, and Mr. Ken McCall, Operations Training Manager, we understand that the examination will be prepared using the guidelines in Revision 9 of NUREG-1021. The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

Thank you for your cooperation in this matter. Mr. K. McCall has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. H. Peterson at 630-829-9707, or me at 630-829-9631.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 See Attached Distribution DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML032801701.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII C RIII N

NAME HPeterson:tr RLanksbury DATE 10/01/03 10/07/03 OFFICIAL RECORD COPY

J. Skolds cc:

Site Vice President - Clinton Power Station Clinton Power Station Plant Manager Regulatory Assurance Manager - Clinton Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing T. Shortell, Training Manager ADAMS Distribution:

AJM DFT JBH1 RidsNrrDipmIipb GEG HBC PLL DRPIII DRSIII PLB1 JRK1