Summary of Meeting with Excel Representative on Review Status of TSTF Travelers
ML032790564
Person / Time
Issue date: 10/06/2003
From: Boyce T
NRC/NRR/DIPM
To: Pietrangelo A
Nuclear Energy Institute
Hearn, P, NRR/DIPM/IROB, 301-415-11
References
Download: ML032790564 (6)


Text

October 6, 2003 Mr. Tony Pietrangelo, Director Risk and Performance Based Regulation Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708

SUBJECT:

SEPTEMBER 23, 2003:

SUMMARY

OF MEETING WITH EXCEL REPRESENTATIVE ON REVIEW STATUS OF TSTF TRAVELERS

Dear Mr. Pietrangelo:

The purpose of this letter is to transmit the summary of a meeting with EXCEL Services Corporation regarding Technical Specifications Task Force (TSTF) issues. The meeting was held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on September 23, 2003. The meeting dealt with the status of the TSTFs which had become subject to fees as a result of a letter from William D. Becker (NRC) to you on January 10, 2003.

Sincerely,

/RA/

Thomas H. Boyce, Section Chief Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation

Enclosures:

1. Meeting Summary
2. Attendees List cc w/encl: See attached page

ML032790564 DOCUMENT NAME: G:\\TSS\\HEARN\\TSTF FEE MEETING

SUMMARY

1.WPD OFFICE TSS:IROB:DIPM SC:TSS:IROB:DIPM NAME PCHearn THBoyce DATE 10/06/2003 10/06/2003

cc:

Mr. Biff Bradley Risk & Performance Regulation Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708 Mr. Donald Hoffman EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Mr. Brian Mann EXCEL Services Corporation 12624 Amershire Court Glen Allen, VA 23059

DISTRIBUTION:

ADAMS PUBLIC TSS R/F TSS Staff DMatthews/FGillespie (RidsNrrDrip)

WDBeckner (RidsNrrDripRorp)

GMHolahan (RidsNrrDssa)

RJBarrett (RidsNrrSpsb)

LTMarsh (RidsNrrDlpm)

JNHannon (RidsNrrDssaSplb)

TRQuay (RidsNrrDipmlqmb)

OGC (RidsOgcRp)

ACRS/ACNW (RidsAcrsAcnwMailCenter)

NSaltos (NTS)

WScott (WES)

GSShukla (GSS)

FMReinhart (FMR)

RFDudley (RFD)

DFThatcher (DFT)

MACaruso (MAC)

MLScott (MLS3)

EMMcKenna (EMM)

MACunningham (MAC3)

ASKuritzky (ASK1)

MTMarkley (MTM)

SDAlexander (SDA)

MDrouin (MXD)

MCThadani (MCT)

TAReed (TAR)

SUMMARY

OF THE SEPTEMBER 23, 2003, NRC MEETING WITH TSTF REPRESENTATIVE TO DISCUSS THE PROPOSED CHANGES TO THE STS NUREGs Members of the staff met with EXCEL Services Corporation to discuss the status of TSTFs which had become subject to fees as a result of the January 10, 2003 letter from William D. Becker to Tony Pietrangelo. The TSTF changes discussed during the meeting involved editorial changes, incorporation of RAI responses and changes that were not substantial.

During the meeting the majority of the TSTFs were categorized as subject to fees or subject to withdrawal from consideration for review. The remaining few were defined by Excel as needing a minimum number of hours of review for completion. The term a minimum number of hours of review for completion was defined as the time required for the staff to review and process a Part 170 Exemption.

The staff intends to incorporate TSTFs that require a minimum number of hours of review for completion, and that will improve the STS, into the next revision to the STS. This revision (Rev. 3) is tentatively scheduled to be issued before the end of 2003. The determination that a particular TSTF meets the minimum number of hours for review completion will be determined by the TSS reviewer of the particular TSTF. We also agreed that the publication of Revision 3 would not be delayed if industry did not submit the TSTF information necessary for the staff to complete the reviews requiring a minimum number of hours to complete.

At the end of the meeting the participants discussed the feasibility of establishing an NRC in-house electronic data base that contained the 103 nuclear plants technical specifications. Both the industry and NRC representatives thought that the concept had potential value but needed to be analyzed further for cost/benefits.

ATTENDEES LIST SEPTEMBER 23, 2003 NAME ORGANIZATION Thomas Boyce NRC/NRR/IROB/DIPM Pete Hearn NRC/NRR/IROB/DIPM Leslie Hill NRC/NRR/IROB/DIPM Don Hoffman EXCEL Brian Mann EXCEL