9 to EP-PS-101, Emergency Director (ED) - TSC Emergency Plan-Position Specific Procedure.
ML032750649
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/17/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
28401 EP-PS-101, Rev 19
Download: ML032750649 (4)


Text

Sep. 17, 2003 Page 1 of 1 MANUAL HARD COPY DIStRr8TjU'N. .w..., ' .;

DOCUMENT TRANSMITTAL 2003-42426 USER IN O614A T'IqO:

-GE L#CHlCRS L*8_4-ICA:

0EP3 U36 -Cj;3>

Addres UCSA2 -'.'*:-;

ne#: 254-TRANSMITTAL INFORMATION.

TO:- k%4 z N

,- -, Vtr1*

09/1772oQ03i;_ f;,j'U. i LOCA IffN: MlCUMENT-CONTROL-DESK--'

FROM: NUCLE'AR 'RECORDS DOCUMENT CONTROL CENTER.,

'NUCSA-2) :5 -. ;i-:. i

HE@FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

101 - 101 - EMERGENCY DIRECTOR (ED)-TSC EMERGENCY PLAN-POSITION SPEqIFI: PF,-OCEDURE  ;. .

REMOVE MANUAL TABLE F`61TEqT'-S-'DATE." o9i'09/20O03 ADD MANUAL TABLE OF CONTENTS DATE: 09/16/2003 0ATOR7: PROCEDURES TYPE: EP ID: EP-PS-101 REPLACE: REV:19 REPLACE: REV:19 REMOVE: PCAF 2003-164,42 ,REV: N/A ADD:'PCAr 2003-1642 REV: N/A UPDATE-S -F.OR HARD 'COPY .MA'kiAI2SLWIPL-E VISTRIBUtED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMEN -u.H;;..:.-

PROCEDURES. PLEASE MAKE.ALL CHANGES AND. . .w.., -

ACKNOWLEDGE CdMkPLETE IN YOUR NImI'X-INBdX 'UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE..IN YOUR NIMS INBOX. .

Tab 11 EP-PS-1 01-1 1 EMERGENCY EXPOSURE EXTENSION REQUEST DATE l_ _ _ l _ TIME _ TEAM TYPE OF DOSE EXTENSION (v):

0 Extend to 25 Rem oExtend to _ _ Rem Approved by/date (RPC/DASU): .

Approved by/date (ED/RM): /

Current Jifetime year, dose, dose, E-plan Name Soc Sec # Sianature mrem mrem Function Signature of volunteer denotes an understanding and an awareness of the risks involved, including the numerical levels of dose at which acute effects of radiation will be incurred and numerical estimates of the risk of delayed effects.

EP-AD-000-135, Revision 7, Page 1 of 3

Tab 11 EP-PS-1 01-1 1 ALARA REVIEW Check /

A. PERSON-REM ESTIMATION

1. Assess the number of workers 4. Assure all workers have essential, required. productive tasks.
2. Evaluate the use of fewer workers. 5. Assure workers have available exposure.
3. Investigate experience of workers 6. Evaluate criteria for emergency exposure.

selected.

B. PLANNING

1. Preplanning meeting with supervisors 4. Prefabrication considered.

and/or workers required. 5. Evaluate use of remote handling devises

2. Access to and exit from work are or other special tools.

planned. 6. Cold equipment mockupsm, rehearsals, or

3. Evaluate staging/setup in accessible other practical exercise.

low dose rate area.

C. EXPOSURE REDUCTION CONTROLS

1. Evaluate need for timekeeping. 7. System or equipment to be drained and
2. Consider use of water bucket flushed.

shielding for carrying hot parts. 8. Assess exposure reduction by permitting

3. Consider use of shielded drums or decay of radiation sources during reactor lead pigse for carrying hot parts. -shutdown or system isolation.
4. Consider use of temporary shielding 9. Assess the-need of communication such as lead wool blankets, lead devices such as head sets,7TV cameras, sheets, or lead bricks. others.
5. Consider use of shadow shields 10. Assess practicality of removing utilizing a portable curtain shield. component from radiation area.
6. System or equipment to be filled with 11. Evaluate use of photographs of has water. installed equipments to aid in worker briefings.

D. AIRBORNEICONTAMINATION CONTROL

1. Assess need for respiratory protection 3. Assess necessity of area decon before usage against effectiveness of commencement of work.

engineering controls. 4. Containment structure (tent) required.

2. Assess individual's history of internal 5. Portable ventilation system required.

DAC-Hr exposure to airborne 6. Assess need for flooding or draining contamination. rooms.

7. Assess hot particle or fuel fragment migration.

Performed by EP-AD-O00-135, Revision 7, Page 2 of 3

Tab 11 EP-PS-1 01-1 1 Provided below are the instructions on how to retrieve an individual's occupational exposure information.

1. Log into NIMS, go to RPDPERX screen.
2. Query the individual.
3. Click on DOSE SUMMARIES button.
4. The screen in Figure 1 will appear.
5. The individual's YEAR-TO-DATE (YTD) dose will be provided as 'NRC PERIOD EXPOSURE' for the current calendar year.

EP-AD-000-1 35, Revision 7, Page 3 of 3