ML032740134
ML032740134 | |
Person / Time | |
---|---|
Site: | Ginna |
Issue date: | 09/22/2003 |
From: | Watts R Rochester Gas & Electric Corp |
To: | Clark R Document Control Desk, NRC/NRR/DLPM/LPD1 |
References | |
Download: ML032740134 (1) | |
Similar Documents at Ginna | |
---|---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19162A1752019-06-0606 June 2019
[Table view]10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML18033A7332018-01-26026 January 2018 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18033A7342018-01-26026 January 2018 EP-AA-1012, Addendum 3, Revision 5, R. E. Ginna Nuclear Power Plant Emergency Action Levels. ML18024A4762018-01-11011 January 2018 Attachments 1-4: 10CFR50.54(q)(5) Procedure Change Summary Analysis, EP-AA-1007, Rev. 33, EP-AA-1008, Rev 30 and EP-AA-1012, Rev. 4 ML18024A4742018-01-11011 January 2018 Submittal of Radiological Emergency Plan Annex Revisions ML17138A1232017-05-0303 May 2017 Exelon Nuclear Radiological Emergency Plan Addendum Revisions, Including Revision 3 to EP-AA-1006, Addendum 3 and Revision 4 to EP-AA-1012, Addendum 3 ML16207A1132016-07-14014 July 2016 Radiological Emergency Plan Annex Revisions ML16209A0542016-07-14014 July 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, R.E. Ginna, Nuclear Radiological Emergency Plan Annex Revisions ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure ML16040A2622016-01-29029 January 2016 Emergency Plan Implementing Procedure, EP-AA-I 12-100O-F-58, Revision C, CR Operations Communicator Checklist (Cng). ML16040A2612016-01-29029 January 2016 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, and R.E. Ginna - Transmittal of Radiological Emergency Implementing Procedure Revisions ML12037A1172011-12-21021 December 2011 EPIP-1-0, Ginna Station Event Evaluation and Classification, Revision Xx, Page 1 of 2 ML12037A1162011-12-21021 December 2011 R. E. Ginna - Emergency Action Level Changes ML12037A1182011-12-21021 December 2011 EPIP-1-0, Ginna Station Event Evaluation and Classification, Revision Xx, Page 2 of 2 ML0712200942007-04-24024 April 2007 R. E. Ginna - Emergency Preparedness Emergency Response Organization Drill Participation Performance Indicator ML0532604802005-11-0101 November 2005 Enclosure H, Pages 45-50 of the Ginna Station Emergency Plan, Appendix G, Analysis of Evacuation Travel Times, of the Ginna Station Emergency Plan, and Ginna Station Discretionary Actions for Emergency Conditions, Effective April 28, 2005 ML0517305362005-06-10010 June 2005 Emergency Operating Procedures ML0511100642005-04-0707 April 2005 Emergency Operating Procedures R.E. Ginna Nuclear Power Plant ML0506302542005-02-17017 February 2005 R. E. Ginna Nuclear Power Plant, Emergency Operating Procedures ML0412503662004-04-22022 April 2004 R. E. Ginna - EPIP 4-8, Rev 5 to, Testing of Ginna Sirens Form Technical Support Center. ML0412604032004-04-20020 April 2004 R. E. Ginna - Transmittal of Emergency Operating Procedures ML0404301912004-02-0505 February 2004 Revision to Emergency Plan Implementing Procedures ML0403002532004-01-14014 January 2004 Revision 30 to EPIP 1-11, Revision 30 to EPIP 2-11, Revision 23 to EPIP 2-12, Revision 29 to EPIP 5-1, and Revision 32 to EPIP 5-2 ML0332300512003-11-0707 November 2003 Revision to Emergency Plan Implementing Procedures ML0330103392003-10-14014 October 2003 Revision 5 to EPIP 1-13, Local Radiation Emergency. ML0329007292003-10-0808 October 2003 Revision 13 to EPIP 2-6, Emergency Dose Projections - Midas Program, and Revision 8 to EPIP 5-9, Testing of Off Hours Notification of the Response Organization and Quarterly Telephone Number Checks. ML0327401342003-09-22022 September 2003 Revised Emergency Plan Implementing Procedures ML0327605212003-09-22022 September 2003 2 to EPIP-1-0, Revision 32 to EAL Technical Basis, Revision 56 to EPIP 1-5, Revision 6 to EPIP 2-8, and Revision 8 to EPIP 2-17 ML0323200162003-08-0808 August 2003 Revision to Emergency Plan Implementing Procedures ML0317605922003-06-20020 June 2003 Revision to Emergency Plan Implementing Procedures ML0314201002003-05-0808 May 2003 Revision to Emergency Plan Implementing Procedures ML0313305402003-05-0505 May 2003 Revision to Emergency Plan Implementing Procedures ML0308500352003-03-20020 March 2003 Revision to Emergency Plan Implementing Procedures ML0306409142003-02-25025 February 2003 R. E. Ginna, Emergency Operating Procedures Including AP Index, AP-CR-1, Rev. 19, Control Room Inaccessibility; AP-ELEC.1, Rev. 24, Loss of 12A And/Or 12B Busses; AP-RCC.3, Rev. 6, Dropped Rod Recovery ML0306404272003-02-25025 February 2003 Revision to Emergency Plan Implementing Procedure, EPIP 4-7, Public Information Oranization Staffing - Attachment 10 ML0306403662003-02-25025 February 2003 Revision to Emergency Plan Implementing Procedure, Procedure Index - Attachment 3, Nuclear Safety Audit Review Board Members ML0306402532003-02-25025 February 2003 Revision to Emergency Plan Implementing Procedure ML0305605472003-02-12012 February 2003 R. E. Ginna Nuclear Station - Emergency Operating Procedures ML0302304862003-01-13013 January 2003 Revision to Emergency Plan Implementing Procedures ML0300304232002-12-19019 December 2002 Emergency Operating Procedures ML0233901152002-11-21021 November 2002 Emergency Operating Procedures for R. E. Ginna Nuclear Power Plant ML0233600812002-11-19019 November 2002 Emergency Operating Procedures for R. E. Ginna ML0228905092002-10-0808 October 2002 Revision to Emergency Plan Implementing Procedures for R.E. Ginna Nuclear Power Plant ML0224801112002-08-30030 August 2002 Rochester Gas and Electric Corp., EPIP 1-11, Revision 27, Survey Center Activation ML0224801232002-08-27027 August 2002 Revision to Emergency Plan Implementing Procedures ML0224103352002-08-13013 August 2002 Emergency Operating Procedures for R.E. Ginna Nuclear Power Plant, ECA-0.2, Revision 14 - FR-Z.1, Revision 6 ML0224103132002-08-13013 August 2002 Emergency Operating Procedures for R.E. Ginna Nuclear Power Plant, Contents - EOP ES-1.3, Revision 34 ML0223208262002-08-0909 August 2002 Revision to Emergency Plan Implementing Procedures R.E. Ginna Nuclear Power Plant ML0217704762002-06-11011 June 2002 Part 1 of 2, R. E. Ginna Nuclear Power Plant - Revision to Emergency Plan Implementing Procedures 2019-06-06 Category:Letter MONTHYEARIR 05000244/20243012024-10-22022 October 2024
[Table view]Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25 |
Text
I asL~JL~ An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
- 585 546-2700 www rge.com September 22, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop 0-8-E9)
Project Directorate 1-1
Subject:
Revision to Emergency Plan Implementing Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:
In accordance with 10 CFR 50.4(b)(5), enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures (EPIP).
We have determined, per the requirements of 10 CFR 50.54(q), that the procedure changes do not decrease the effectiveness of our Nuclear Emergency Response Plan.
Very truly yours,
/21el"aIJaT Uld' Richard J. Wafts Manager, Nuclear Training Department Enclosures xc: USNRC Region 1 (2 copies of letter and 2 copies of each procedure)
Resident Inspector, Ginna Station (1 copy of letter and 1 copy of each procedure)
RG&E Nuclear Safety and Licensing (1 copy of letter)
Dr. Robert C. Mecredy (2 copies of letter only)
RJW/jtw AC