MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] |
Text
Sep. 17, 2003 Page 1 of 1 MANUAL HARD COPY DlSTRIBUTI0fN - '
DOCUMENT TRANSMITTAL 2003-42491 USER INFORMATTON:
ACH- ROS EMPL#:284&1CA#: 0363 Addres UCSA2 P #: 254-3 An~~~~~~~~.4 ...i. .......... i _ ......... a.,;..:
TRANSMITTAL INFORMATION:
TO:: I o '.-7./2O03
.'0 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDSDOCUMENT CONTROL CENTER NUCSA,,,2)__
BE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
110 - 110 - MAINTENANCE/I&C COOaDINATOR: EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE-;"',
REMOVE MANUAL TABLE OF CONTENTS bATE:
A' 08/22/2003 ADD MANUAL TABLE OF CONTENTS DATE: 09/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-110 REPLACE: REV:5 REPLACE: REV:5. . . .....
REMOVE: PCAF 2003.-160,2 Rs;EV: N/A ADD: PCAF 2003-1602 REV: N/A UPDATES FOR HARD COPI MANUALS WItt Et 'Di3TAIUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMEN'T-*i. i PROCEDURES. PLEAq,E MAKE ALL. CHANGES.,AND ACKNOWLEDGE COMPLETE IN YOUR' NIMS IlqBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE I-N YOUR NIMS INBOX. - ;
PSD1AS
Tab 8 EP-PS-1 10-8 Affected Unit Control No.
PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION 0 This is a Drill 0 This is NOT a Drill Preparer:
The EMERGENCY CLASSIFICATION Is:
0 Unusual Event 0 Alert 0 Site Area Emergency 01 General Emergency Basis: EAL #
This represents:
0 Initial Classification 0 Escalation 0 Reduction 0 No Change in the Classification Status Emergency Action(s) Implemented onsite:
O None .0 Evacuation of non-essential personnel O Local Area Evacuation - O KI to onsite personnel o Site Accountability 0 Other Bases:
The PROTECTIVE ACTION RECOMMENDATION Is:
O No Protective Action Recommendation Required 0 Evacuate 0-2 miles and Shelter 2-10 miles 0 Relocation 0 Evacuate 0-10 miles 0 Control of Access
.0 Contamination Controls/Decon 0 Divert Danville Drinking Water* 0 Other
- Expected arrival of release at Danville:
This represents: 0 Initial 0 Change 0 No Change in the Protective Action Recommendation EP-AD-000-1 10, Revision 10, Page 1 of 2 (DUPLEX)
Tab 8 EP-PS-1 10-8 The BASIS for the Protective Action Recommendation is:
Plant Status Status of Radioactive Release: Event-related release In progress? D Yes D No Total Site Release Rate Airborne l Uquid
< Tech Requirements Limit ED 03
Ž Tech Requirements Limit E3 0 NOTE: TRM Limits (,uCI/min): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)
Based on: 0 Effluent Monitors 3 Field Measurements 3 Engineering Judgement Data measured in the field confirm release rate estimations: 0 Yes 0 No 0 WA Weather Conditions: Wind Speed__ Wind Direction_
Dose Projections: 0 TEDE > 1 rem or thyroid CDE > 5 rem at 2 miles o TEDE > 1 rem or thyroid CDE > 5 rem at EPB o TEDE < 1 rem and thyroid CDE < 5 rem at EPB -
Other:
Approval: Date/Time:_
Emergency Director or Recovery Manager approval required if change in Classification or Protective Action Recommendation.
RPC or DASU approval if no change in the Classification or Protective Action Recommendation.
Transmittal: 0 Verbal 0 Electronic 0 Both Communicated To:
NAME AGENCY DATE/TIME _
EP-AD-000-1 10, Revision 10, Page 2 of 2 (DUPLEX)