|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19004A3022018-12-19019 December 2018 Emergency Plan Changes Revision 61 to Revision 62 ML17006A3862017-01-0505 January 2017 FEMA - Submittal of After Action Report/Improvement Plan for Susquehanna Steam Electric Station 2016 Plume Exercise Evaluated on October 18, 2016 ML15264A6932015-09-21021 September 2015 SSES EAL Scheme Bases Document Redline Strike-out in Support of 9/23 Public Meeting PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases2015-03-19019 March 2015 Revision (X) to EP-RM-004, EAL Classification Bases PLA-7279, Submittal of Revision 56 to Emergency Plan2015-01-19019 January 2015 Submittal of Revision 56 to Emergency Plan ML0627801812006-09-22022 September 2006 Rev. 4 to TSB2, Technical Specifications Bases Unit 2 Manual and Rev. 75 to Manual Table of Contents ML0519904452005-07-0707 July 2005 Technical Specification Bases Unit 1 Manual, Revision 1 ML0410505062004-04-0707 April 2004 EP-PS-137, Rev 0, TSC NRC Communicator. ML0410504572004-04-0707 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-126, Control Room (CR) Communicator. ML0410503912004-04-0707 April 2004 Transmittal of EP-PS-135, NRC Communicator: Emergency Plan Position Specific Procedure ML0410504682004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-243, Rev 5, Radiological Liaison. ML0410504632004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure EP-PS-221-1, Nearsite Emergency Monitoring Team: Emergency Plan-Position Specific Procedure. ML0410504602004-04-0202 April 2004 Transmittal of Emergency Plan Implementing Procedure, EP-PS-248, Environmental Sample Director. ML0409904242004-04-0101 April 2004 to EP-PS-248, Environmental Sample Director. ML0409004192004-03-23023 March 2004 EP-PS-113, Security Coordinator: Emergency Plan-Position Specific Procedure. ML0408406142004-03-10010 March 2004 EP-PS-101, Emergency Director (Ed). ML0408406122004-03-0808 March 2004 EP-PS-307, Engineering Support Manager. ML0408406062004-03-0808 March 2004 EP-PS-102, Technical Support Coordinator. ML0405503942004-02-16016 February 2004 Revision 10 to EP-PS-351, News Manager. ML0405503912004-02-16016 February 2004 EP-PS-367, General Office Operations Manager. ML0403502512004-01-28028 January 2004 EP-PS-245, Dose Assessment Supervisor. ML0403502642004-01-27027 January 2004 EP-PS-130, Rev 17, HP II Dose Calculator. ML0403502692004-01-27027 January 2004 EP-PS-244, Rev 7, Dose Assessment Staffer. ML0403502602004-01-27027 January 2004 EP-PS-104, Rev 17, Radiation Protection Coordinator (Rpc). ML0403502562004-01-27027 January 2004 EP-PS-105, TSC Dose Calculator. ML0402906032004-01-19019 January 2004 EP-PS-104, Rev. 17, Radiation Protection Coordinator (Rpc). ML0402905562004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-207, Rev. 11, EOF Support Supervisor: Emergency Plan Position Specific Procedure. ML0402905652004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-200, Rev. 16, Recovery Manager: Emergency Plan Position Specific Instruction. ML0402905412004-01-19019 January 2004 Revision 19 to EP-PS-100, Emergency Director/Control Room. ML0402905752004-01-19019 January 2004 Emergency Plan Implementing Procedure EP-PS-127, Rev. 16, TSC Emergency Plan Communicator: Emergency Plan Position Specific Procedure. ML0402905822004-01-19019 January 2004 EP-PS-114, Chemistry Coordinator. ML0402905942004-01-19019 January 2004 EP-PS-248, Environmental Sample Director. ML0402905982004-01-19019 January 2004 EP-PS-243, Radiological Liaison. ML0402906052004-01-19019 January 2004 Revision 19 to EP-PS-101, TSC Emergency Director. ML0402906082004-01-19019 January 2004 Revision 18 to EP-PS-212, EOF Communicator. ML0402905872004-01-19019 January 2004 EP-PS-247, Rev. 2, Field Team Director. PLA-5644, Proposed Emergency Plan Revision Requiring NRC Approval2004-01-16016 January 2004 Proposed Emergency Plan Revision Requiring NRC Approval ML0336405902003-12-19019 December 2003 Transmittal of EP-PS-100, Rev. 19 Emergency Director/Control Room: Emergency Plan-Position Specific Procedure. ML0335703252003-12-12012 December 2003 EP-PS-126, Revision 19, Control Room Communicator ML0335702972003-12-12012 December 2003 EP-PS-100, Emergency Director/Control Room. ML0335702992003-12-12012 December 2003 EP-PS-354, Media Operations Center (MOC) Communicator. ML0335703002003-12-12012 December 2003 EP-PS-212, Rev 18, EOF Communicator. ML0335703012003-12-12012 December 2003 EP-PS-207, Rev 11, Site Support Manager. ML0335703212003-12-12012 December 2003 EP-PS-137, Rev 0, TSC NRC Communicator. ML0335703232003-12-12012 December 2003 EP-PS-135, Rev 0, NRC Communicator. ML0335703242003-12-12012 December 2003 EP-PS-127, Rev 16, Technical Support Center (TSC) Communicator. ML0335703292003-12-12012 December 2003 EP-PS-114, Rev 10, Chemistry Coordinator: Emergency Plan-Position Specific Procedure. ML0335703302003-12-12012 December 2003 EP-PS-111, Rev 4, TSC Lead Engineer. ML0335703322003-12-12012 December 2003 EP-PS-103, Rev 6, Operations (OPS) Coordinator. ML0335703342003-12-12012 December 2003 EP-PS-102, Rev 23, Technical Support Coordinator. 2018-12-19
[Table view] |
Text
Sep. 17, 2003
-, - .A' Page 1 of 1 MANUAL HARD COPY DSTRIBUTIib¶N s: ; .i DOCUMENT TRANSMITTAL 2003-42478
.I USER INFORMATION:
- tt. "
. ., t :--
ACH*RO M EMPL#:2840I CA#: 0363 - .,_ 4 _11 Addres UCSA2 ". , A -
o - - .
Ph 25 4 -
&;;s r ;. #' I 3 ! ; ^s* wdt .i;; ,.t . -
TRANSMITTAL INFORMATION:
1' ~~~~~~.' _ I
._1
- - > J@5-., -~f-_J . , 14 i . .I TO:'tit l;t;,.: to'9/ 2-403-9. '*
LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR..RECORDS -rOCUMENT CONTROL CENTER .
'N.U-SA-&- _ .
K_'HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONICMAN4UAL ,A&9S.JQ3 .;. -
114 - 114 - CHEMISTRY COORDINA.TOR: EMERGENCY.PLAN-POSITION SPECIFI-C PRQcL*EtJ1E.!'-- ... It REMOVE MANUAL TABLt OF CONTEUT$. DATE- 06/26/20 I
ADD MANUAL TABLE OF CONTENTS DATE: 09/16/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-114 REPLACE: REV:10 REPLAC.E:.- .REV:10---
UPDATES FOR HARD COI%4AfUALS WILL BE DISTRIBUTED WITHIN. 5 -DAYS IN ACC OR1ANCE -I-TH- -EPAR1-MENT--
PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDE..COMPLETE.. ;3l WY9URLNIMS IOXJ-UPQN., .
RECEIP`TWfS' HARD COPY. FO OSE.
SEEAECTR'oNflOMANUA' ELECTRONICALLY REVIEW THE APPROPRIATE DOCU$1Eth'-fiND ACKNOWLEDGE qOMPL.ETK0 I-XIk7YqU.Qq?-fM#;p9X.,
. . , . .;idr'v K-,--
Ao04s
Tab 6 EP-PS-1 14-6 Affected Unit Control No. .
PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION E3 This is a Drill O This is NOT a Drill Preparer: -
The EMERGENCY CLASSIFICATION is:
O3 Unusual Event O3 Alert E3 Site Area Emergency 0 General Emergency Basis: EAL #
This represents:
O Initial Classification Escalation E3 Reduction 0 No Change in.the Classification Status Emergency Action(s) Implemented onsite:
O None -S Evacuation of non-essential personnel O Local.Area Evacuation O Ki to onsite personnel " - - .
o Site Accountability o Other Bases:
The PROTECTIVE ACTION RECOMMENDATION Is:
E No Protective Action Recommendation Required O Evacuate 0-2 miles and Shelter 2-10 miles l O Relocation O Evacuate 0-10 miles El Control of Access
.___________________________________. Contamination Controls/Decon E Divert Danville Drinking Water E Other
- Expected arrival of release at Danville:
This represents: Initial E Change 3 No Change in the Protective Action Recommendation EP-AD-000-110, Revision 10, Page 1 of 2 (DUPLEX)
- - f -
Tab 6 EP-PS-1 14-6 The BASIS for the Protective Action Recommendation Is:
Plant Status Status of Radioactive Release: Event-related release In progress? 0 Yes 0 No Total Site Release Rate Airborne l Liquid
< Tech Requirements Limit 13 I0 2 Tech Requirements Limit ° O NOTE: TRM Limits (Ci/min): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)
Based on: Effluent Monitors 0 Field Measurements 0 Engineering Judgement Data measured in the field confirm release rate estimations: 0 Yes 0 No 3 N/A Weather Conditions: Wind Speed_ Wind Direction_
Dose Projections: 0 TEDE s 1 rem or thyroid CDE > rem at 2 miles o TEDE > I rem or thyroid CDE > 6 rem at EPB 3 TEDE < 1 rem and thyroid CDE 5 rem at EPB Other:
Approval: ______________________ DateMme:_
Emergency Director or Recovery Manager approval required if change in Classiication or Protective Action Recommendation.
RPC or DASU approval if no change in the Classification or Protective Action Recommendation.
Transmittal: 0 Verbal 0 Electronic 0 Both Communicated To:
NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 10, Page 2 of 2 (DUPLEX) -