ML032730587

From kanterella
Jump to navigation Jump to search
0 to EP-PS-114, Chemistry Coordinator: Emergency Plan-Position Specific Procedure
ML032730587
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/17/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML032730587 (3)


Text

-, -

.A' Sep. 17, 2003 Page 1

of 1 MANUAL HARD COPY DSTRIBUTIib¶N s

. i DOCUMENT TRANSMITTAL 2003-42478 USER INFORMATION:

ACH*RO M

EMPL#:2840I CA#: 0363 Addres UCSA2 Ph 25 4

s r

I 3

^s*

wdt

.i;;

,.t.

.I

tt.

., t :--

.,_ 4 _11

"., A o -

-

TRANSMITTAL INFORMATION:

1'

~~~~~~.'

I

- > J

@5-., ~f

-_J

._1 14

.I

., i TO:'tit l;t;,.:

to'9/

2-403 -9.

LOCATION:

DOCUMENT CONTROL DESK FROM:

NUCLEAR..RECORDS -rOCUMENT CONTROL CENTER.

'N.U-SA-& -

K_'HE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONICMAN4UAL,A&9S.JQ3 114 -

114 -

CHEMISTRY COORDINA.TOR: EMERGENCY.PLAN-POSITION SPECIFI-C PRQcL*EtJ1E.!'--

It REMOVE MANUAL TABLt OF CONTEUT$. DATE- 06/26/20 ADD MANUAL TABLE OF CONTENTS DATE: 09/16/2003 CATEGORY: PROCEDURES TYPE: EP ID:

EP-PS-114 REPLACE:

REV:10 REPLAC.E:.-.REV:10---

UPDATES FOR HARD COI%4AfUALS WILL BE DISTRIBUTED WITHIN. 5 -DAYS IN ACC OR1ANCE -I-TH- -EPAR1-MENT--

PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDE..COMPLETE.. ;3l WY9URLNIMS IOXJ-UPQN.,

RECEIP`TWfS' HARD COPY. FO SEEAECTR'oNflOMANUA' OSE.,

ELECTRONICALLY REVIEW THE APPROPRIATE DOCU$1Eth'-fiND ACKNOWLEDGE qOMPL.ETK0 I-XIk7YqU.Qq?-fM#;p9X.,

I

.;idr'v K-,--

Ao04s

Tab 6 EP-PS-1 14-6 Affected Unit Control No.

PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION E3 This is a Drill O This is NOT a Drill Preparer:

The EMERGENCY CLASSIFICATION is:

O3 Unusual Event O3 Alert E3 Site Area Emergency 0 General Emergency Basis: EAL #

This represents:

O Initial Classification Escalation E3 Reduction 0 No Change in.the Classification Status Emergency Action(s) Implemented onsite:

O None O Local.Area Evacuation o Site Accountability Bases:

-S Evacuation of non-essential personnel O Ki to onsite personnel o Other The PROTECTIVE ACTION RECOMMENDATION Is:

E No Protective Action Recommendation Required O Evacuate 0-2 miles and Shelter 2-10 miles l O Relocation O Evacuate 0-10 miles El Control of Access Contamination Controls/Decon E Divert Danville Drinking Water E Other

  • Expected arrival of release at Danville:

This represents:

Initial E Change 3 No Change in the Protective Action Recommendation EP-AD-000-110, Revision 10, Page 1 of 2 (DUPLEX)

f -

Tab 6 EP-PS-1 14-6 The BASIS for the Protective Action Recommendation Is:

Plant Status Status of Radioactive Release: Event-related release In progress? 0 Yes 0 No Total Site Release Rate Airborne l

Liquid

< Tech Requirements Limit 13 I0 2 Tech Requirements Limit

° O

NOTE:

TRM Limits (Ci/min): Noble Gas 1.OOE+6; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Based on:

Effluent Monitors 0 Field Measurements 0 Engineering Judgement Data measured in the field confirm release rate estimations: 0 Yes 0 No 3 N/A Weather Conditions:

Wind Speed_

Wind Direction_

Dose Projections: 0 TEDE s 1 rem or thyroid CDE >

rem at 2 miles o TEDE > I rem or thyroid CDE > 6 rem at EPB 3 TEDE < 1 rem and thyroid CDE 5 rem at EPB Other:

Approval: ______________________

DateMme:_

Emergency Director or Recovery Manager approval required if change in Classiication or Protective Action Recommendation.

RPC or DASU approval if no change in the Classification or Protective Action Recommendation.

Transmittal:

0 Verbal 0 Electronic 0 Both Communicated To:

NAME AGENCY DATE/TIME EP-AD-000-1 10, Revision 10, Page 2 of 2 (DUPLEX) -