ML032721528
| ML032721528 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/29/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB5737 | |
| Download: ML032721528 (2) | |
Text
MCPR 3.2.2 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO MCPR)
LCO 3.2.2 APPLICABILITY:
All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.
THERMAL POWER 21.6% RTP.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Any MCPR not within A.1 Restore MCPR(s) to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> limits.
within limits.
B.
Required Action and B.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to < 21.6t RTP.
Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify all MCPRs are greater than or equal Once within to the limits specified in the COLR.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 2 21.6t RTP AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)
I CLINTON 3.2-2 Amendment No. 159
MCPR 3.2.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.2.2.2 Determine the MCPR limits.
Once within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each completion of SR 3.1.4.1 AND Once within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each completion of SR 3.1.4.2 AND Once within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each completion of SR 3.1.4.4 CLINTON 3.2-2a Amendment No. 159