NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION p1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-prnted) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, will be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not Include proprietary materials.
DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed 09125t2003 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s)
Project 690, Dockets 50-369, 370, 413, 414, 335, 389, Plant/Facility Name 285,261,244,395,238,249,254,265 TAC Number(s) (if available)
Reference Meeting Notice 9/10/03 Purpose of Meeting (copy from meeting notice)
Discussions between the NRC Lic. Renewal Steering Com. & NEI LR Working Group and renewal applicant management meetings NAME OF PERSON WHO ISSUED MEETING NOTICE TITL E Stephen T. Hoffman Sr. Project Manager OFFICE NRR DMSION DRIP BRANCH RLEP Distribution of this form and attachments:
Docket File/Central File PUBLIC NRC FORM 5S (9.1999)
PRINTED ON RECYCLED PAPER This flon was designed using InForms PO
AGENDA NRC LICENSE RENEWAL STEERING COMMITTEE MEETING WITH NEI AND THE LICENSE RENEWAL APPLICANTS SEPTEMBER 25,2003 (Times are approximate)
I.
Meeting between the NRC License Renewal Steering Committee and the NEI License Renewal Working Group A. Status of applications 1:00 p.m.-1:4(
(1) McGuire, 1 & 2, and Catawba, 1 & 2 Duke Energy (2) St. Lucie, 1 & 2 FPL (3) Fort Calhoun OPPD (4) H.B. Robinson, 2 CP&L (5) R.E. Ginna RG&E (6) Virgil C. Summer SCE&G (7) Dresden, 2 & 3, and Quad Cities, 1 & 2 Exelon (8) Farley, 1 & 2 Southern Nuclear B. License renewal interest NRC 1:40 p.m.-1:45 C. Lessons learned and license renewal NEI/NRC 1:45 p.m.-2:15 guidance development (1) Status of interim staff guidance (2) Improved review process D. Public participation Members of 2:15 p.m.-2:3C the public
)p.m.
5p.m.
5p.m.
Op.m.
E. Summary NRC 2:30 p.m.-2:35 p.m.
Break 2:35.m.-2:45 p.m.
II. Meeting between NRC management and license renewal applicants A. Status of applications 2:45 p.m.-3:45 p.m.
(1) St. Lucie, 1 & 2 FPUNRC (2) Fort Calhoun OPPD/NRC (3) H.B. Robinson, 2 CP&UNRC (4) R.E. Ginna RG&E/NRC (5) Virgil C. Summer SCE&G/NRC (6) Dresden 1 & 2, and Quad Cities 1 & 2 Exelon/NRC B. Public participation Members of 3:45 p.m.-4:00 p.m.
the public C. Adjourn 4:00 p.m.
Prolected Schedule of License Renewal Applications Through FY06
=
FY02 IFY03 IFY04 FY05 FY06 Slot Plant Submit 10 02 30 14Q 1Q 2
130 40 1
2 30 4
10 12Q 130 40 10 120 130 40 FY01 3
Catawba 1, 2 Jun-01 4
McGuire 1,2 Jun-01 FY02 L
1 1
St. Lie 1,2 Nov-01 2
Fort Calhoun Jan-02 3
Robinson 2 Jun-02 4
Ghnna Aug-02 5
Summer Aug-02 FY03 I 1
Dresden 2,3 Jan-03 2
Quad Cities 1,2 Jan-03 3
Farley 1,2 Sep-03 FY04 1
ANO-2 Oct-03
=IloT 2
D.C. Cook 1,2 Nov-03 3
Browns Ferry 1,2.3 Dec-03
-1I 4
Millstone 2,3 Jan-04 5
Unannounced 1,2 Feb-04 too 6
Nine Mile Pt. 1,2 May-04 7
Beaver Valley 1,2 Sep-04 FY05 I
Unannounced1 Oct-04 w
T 2
Brunswick 1,2 Dec-04 WMISSM 3
Davis-Besse Dec04 am RON TT rI 4
Pilgrim Dec-04T 5
Unannounced 2ai 6
Monticello 2Q-7 Entergy Plant (1)
Ju-05r FY06 1
Projected Oct-Os 2
Entergy Plant (1)
Dc'-5 3
Unannounced 1 Mar-06 T
4 Susquehanna,.2 4Q 5 __
Entergy Plant(2)
Jul-06 l
6 Wolf Creek Sep-06 Application under review - NO HEARING (22 months)
Application under review - Opportunity for HEARING PENDING (30 months)
Application under review - Opportunity for HEARING GRANTED (30 months)
Planned Applications - Schedule NO HEARING (22 months)
September 22, 2003 1
ISG Status 1
ISG-01 GALL report contains one acceptable way, not only way To clarify that GALL report contains one acceptable way, not only way Completed 11/23/01 2
ISG-02 To add SBO scoping Completed Station Blackout Scoping (SBO) 4/1/02 3
ISG-03 To clarify the acceptable aging Completed Concrete Aging Management Program management programs (AMPs) 11/23/01 in GALL and SRP 4
ISG-04 To clarify AMPs X1.M26 and Completed Fire Protection System Piping M27 12/3/02 5
ISG-05 To include fuse clips and fuse Completed Identification and Treatment of Electrical Fuse block for fuse holders and to add 3/10/03 Holders a new AMP for fuse clips (i.e.,
metallic) 6 Identification and Treatment of Housing of To clarify a need for AMR for Awaiting NEI Response Active Components housing of fans, dampers, and H/C coils 7
Scoping Guidance for Fire Protection To clarify fire protection scoping Under Staff Review Systems, Structures, and Components 2
ISG Status (continued) 8 Updating the Improved Guidance Documents, ISG Process To establish ISG process.
Deleted from ISG list per meeting with NEI on 2113/03 (non-technical issue) 9 Scoping Criteria 10 CFR 54.4 (a) (2)
To clarify the scoping criteria in 10 CFR 54.4 (a) (2)
Awaiting NEI Response 10 Class of '03 Standard License To standardize license renewal format Completed Renewal Application Format for 2003 applicants 4/7/03 11 Aging Management of To review this fatigue issue as an ISG Environmental Fatigue for process, as agreed by 9/18/02 meeting Awaiting NEI response Carbon/Low Alloy Steel 12 Operating Experience with Cracking To capture experience related to Under Staff Review of Class 1 Small Bore Piping cracking of Class 1 small bore piping 13 Management of Loss of Preload on To review use of Loose Parts Under Staff Development Reactor Vessel Intemals Bolting Monitoring System for management of Using the Loose Parts Monitoring loss of preload on reactor vessel System internals bolting 14 Operating Experience with Cracking To capture experience related to Under Staff Development on Bolting cracking of bolting 3
ISG Status (continued) 15 Revision to Generic Aging Lessons Learned (GALL) aging management program (AMP) XL.E2 To Incorporate NEI's proposed revision to GALL AMP XLE2 Awaiting NEI Response 16 Time-Limited Aging Analyses (TLAA)
To maximize the efficiency of the LRA Awaiting NEI Response supporting information for license review process and minimize RAls renewal applications 17 Development of inspection program for To review bus bar Insulation problem due Under Staff Review electrical bus ducts (GALL AMP XI.E4) to water intrusion in bus ducts and develop AMP 18 Revision to GALL AMP XI.E3 for Develop AMP to prevent moisture Under Staff Development inaccessible cable (medium voltage) collection in man hole.
19 Revision to GALL AMP XI.M1 1 Revise to include nickel-alloy nozzles and Under Staff Development penetrations 20 Revision to GALL AMP XI.M19 Revise to include steam generator tube Under Staff Development integrity i
4
ST. LUCIE, UNITS 1 AND 2 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Issued final supplemental environmental impact statement (SEIS)
Issued safety evaluation report (SER)
Completed Advisory Committee on Reactor Safeguards (ACRS)
Full Committee meeting on SER FUTURE ACTIVITIES 5/19/03 7/7/03 9/11/03 Issue renewed licenses 10/3/03 5
FORT CALHOUN LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Issued potential open item letter Public meeting on draft SEIS ACRS Full Committee meeting (Tutorial on FCS renewal application)
End of draft SEIS comment period Issued SER with open items ACRS Subcommittee meeting Received responses to SER open items Issued final SEIS Regional Administrator letter Issued final SER 2/20/03 2/26/03 3/6/03 4/10/03 4/21/03 6/11/03 7/7/03 8/11/03 8/29/03 9/5/03 6
FORT CALHOUN LICENSE RENEWAL STATUS FUTURE MILESTONES ACRS Full Committee meeting ACRS letter Staff recommendation to NRR Office Director Renewed license decision 10/1/03 11/03 11/14/03 11/21/03 7
ROBINSON NUCLEAR PLANT LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Issued safety requests for additional information (RAls)
Received safety RAI responses Public meeting to discuss draft SEIS Issued SER with open items (2 open items)
Completed optional final inspection ACRS Subcommittee meeting on SER with open items 2/11/03 4/28/03 6/25/03 8/25/03 9/10/03 9/30/03 8
, I ROBINSON NUCLEAR PLANT LICENSE RENEWAL STATUS FUTURE ACTIVITIES Receive responses to SER open items Issue final SEIS Issue SER ACRS full Committee meeting Staff recommendation to Director, NRR Renewed license decision 11/7/03 12/31/03 1/21/04 3/04 4/12/04 4/19/04 9
GINNA STATION LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Received environmental RAI responses Issued safety RAls Received safety RAI responses Issued draft SEIS Completed scoping inspection Completed AMR inspection Public meeting on draft SEIS 3/13/03 3/21/03 6/12/03 6/25/03 6/27/03 8/15/03 8/6/03 10
GINNA STATION LICENSE RENEWAL STATUS FUTURE ACTIVITIES Issue SER with open items ACRS subcommittee meeting on SER with open items Receive responses to SER open items Issue final SEIS Issue SER Staff recommendation to Director, NRR Renewed license decision 10/9/03 11/4/03 12/24/03 2/6/03 3/8/04 5/28/04 6/4/04 11
SUMMER LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Received environmental RAI responses Issued safety RAls Completed scoping inspection Received responses to safety RAls Issued draft SEIS Completed aging management program audit for GALL programs Completed aging management review inspection Public meeting on draft SEIS 3/20/03 3/28/03 5/16/03 6/12/03 7/11/03 7/17/03 8/22/03 8/26/03 12
SUMMER LICENSE RENEWAL STATUS FUTURE ACTIVITIES Issue SER with open items ACRS Subcommittee meeting on SER with open items Receive responses to SER open items Issue final SEIS Issue SER Staff recommendation to Director, NRR Renewed license decision 10/14/03 12/3/03 12/29/03 2/28/04 3/11/04 6/4/04 6/11/04 13
DRESDEN UNITS 2 AND 3 QUAD CITIES UNITS 1 AND 2 LICENSE RENEWAL STATUS RECENT ACCOMPLISHMENTS Deadline for hearing requests and petitions to intervene Environmental scoping meetings SEIS scoping period ended Completed scoping and screening methodology audit Issued environmental RAls Received environmental RAI responses Completed scoping and screening inspection Issued safety RAls 4/3/03 4/8/03 4/10/03 5/12/03 5/23/03 5/30/03 7/23/03 8/1/03 8/7/03 14
W DRESDEN UNITS 2 AND 3 QUAD CITIES UNITS I AND 2 LICENSE RENEWAL STATUS 0
FUTURE ACTIVITIES Receive safety RAI responses 10/6/03 Complete AMR inspection 10/24/03 Issue draft SEISs 12/5/03 Public meetings on draft SEISs 12/16/03 1/14/04 Issue SER with open items 2/16/04 15