August 2003 Monthly Operating Report for Susquehanna Units 1 and 2
ML032690866
Person / Time
Site: Susquehanna  
Issue date: 09/11/2003
From: Richard Anderson
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005674
Download: ML032690866 (7)


Text

I mu - -

p p ~~v Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem IBoulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@pphieb.com September 11, 2003 U. S. Nuclear Regulatory Comnmission Attn: Document Control Desk Mail Station OPI-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005674 The August 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.

Very truly yours, Richard L. Anderson JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman 2e r6- ;'

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 09/10/2003 J. J. Hennings (570) 542-3747 OPERATING STATUS I.

2.

3.

4.

Unit Name:

Susquehanna Steam Electric Station (U )

Reporting Period:

August 2003 Design Electrical Rating (Net MWe):

1115 Maximum Dependable Capacity (Net MWe):

1105 5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

804,432 Yr.-to-Date 5831 5831 5815.7 0

6,353,212 Cumulative 177,360 147,695.5 145,469.5 0

149,606,741 NOTES:

Page 1 of 1 V

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 9/1 12003 J. J. Hennings (570) 542-3747 REPORT MONTH August 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting To Prevent Recurrence Down

~~~~~~~~Reactor 3

No Shutdowns this month.

Summary: There were two planned power reductions in the month of August: A control rod sequence exchange was performed at 76% power on 8/23/2003 and 100% power was restored on 8/25/2003. On 8/30/2003, Control Rod adjustments were made at 84% power and 100% power was achieved on 8/31/2003.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

I - Manual 2-Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page I of I

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Date:

9/10/03 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenzes to Main Steam Safety Relief Valves None.

Z-I OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 9/10/03 J. J. Hennings (570) 542-3747 OPERATING STATUS 1.

2.

3.

4.

Unit Name:

Susguehanna Stea Reporting Period:

August; Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net M an Electric Station (U2) 2003 1182*

We):

1140*

5.

6.

7.

8.

9.

Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 744 744 744 0

843,127 Yr.-to-Date 5,831 4,817.4 4,772.9 0

5,267,963 Cumulative 162,600 140,966.8 138,979.6 0

145,378,957 NOTES:

  • During the U2 1 1"' Refueling Outage, the Main Turbine was replaced with a newly designed HP and three LP turbines. The Design Rating and Maximum Dependable Capacity rating changed following the analysis of the official Performance/Acceptance Test performed in early June. Maximum Dependable Capacity rating is now 1140 MWe Net. The Design Electrical Rating of 1182 MWe Net is the nominal value identified in the FSAR (1220 MWe Gross) and corresponds closely to the Winter Production Rating.

Page I of I

Ft UNIT SHUTDOWNS

ANN 4 DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 9/10/03 J. J. Hennings (570) 542-3747 REPORT MONTH August 2003 No.

Date Type Duration Reason Method of Cause & Corrective Action I

(Hours) 2 Shutting to Prevent Recurrence Down Reactor l Summary:

There were no power changes in August.

l No shutdowns this month.

Summary: There were no power changes in August.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page I of 1

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

09/10t2003 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.