Nuclear Operating Company!
S&hfl9Ft ha&Z Pa2I9 MtbwAdo )
September 15, 2003 NOC-AE-03001599 File No.: G02 10CFR50.71 STI: 31654407 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for August. 2003 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for August 2003. If you should have any questions on this matter, please contact R.L.
Hill at (361) 972-7667.
F.H. Mallen General Manager, Financial Support Attachments: 1)
STPEGS Unit 1 Monthly Operating Report - August 2003
- 2)
, STPEGS Unit 2 Monthly Operating Report - August 2003
(-Jxt
NOC-AE-03001599 Page 2 cc:
(paper copy)
(electronic copy)
Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MNI 16 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT AUGUST 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:
Dae7/r0 E.D. IWIN Date
MONTHLY
SUMMARY
South Texas Project Unit 1 began the reporting period shutdown for repairs on bottom mounted instrumentation penetrations on the reactor pressure vessel. The unit was returned to service on August 9, at 1246 and achieved full power on August 11, at 1740.
On August 12, at 1011 the unit was removed from service to allow main turbine intercept valve oil leak repairs. The unit was returned to service on August 12, at 2141 and achieved full power on August 14, at 0202.
The unit concluded the month operating at full power.
OPERATING DATA REPORT DOCKET NO.
50498 UNIT I
DATE Sept. 9. 2003 COMPLETED BY R-L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 8/1/03-8/31/03 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWH)
- 11.
REACTOR SERVICE FACTOR (%)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (%)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (as)
- 17.
UNIT FORCED OUTAGE RATE (%)
THIS MONTH 586.4 0
541.6 0
1.928.715 629.641 78.8 78.8 72.8 72.8 67.7 67.7 27.2 YR TO DATE 20557.4 0
2.505.4 9,276hj76 3.093.387 43.9 43.9 43.0 43.0 42.4 42.4 51.9 CUMULATIVE 101.086.5 0
99.398.5 0
371.227.239 121.309Q442 76.8 76.8 75.5 75.5 73.7 73.7 15.1
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWTER LEVEL DOCKET NO.
50-498 UNIT 1
DATE Sept. 9. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 0
0 0
0 0
0 0
23 115 809 1126 416 817 1271 1275 1275 17 18 19 20 21 22 23 24 1273 1272 1270 1271 1274 1276 1277 1276 1274 1273 1274 1273 1274 1274 1275 25 26 27 28 29 30 31
UNIT SEUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-498 UNIT 1
DATE Sept. 9. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH AUGUST 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor 03-04 04/20/03 F
190.9 F
9 01-03-003 RC PEN Investigate and repair bottom mounted instrumentation penetration indications.
03-05 08/12/03 F
11.5 F
1 N/A TA V
Main turbine intercept valve oil leak repair.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT AUGUST 2003 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By:
h i
90' jr/;
E.D.
PIN Date
MONTHLY
SUMMARY
South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.
OPERATING DATA REPORT DOCKETNO.
50-499 UNIT 2
DATE Sept. 9. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS
- 1.
REPORTING PERIOD: 8/1/03-8/31/03 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIM[UM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
- 4.
REASONS FOR RESTRICTION (IF ANY): N/A
- 5.
NUMBER OF HOURS REACTOR CRITICAL
- 6.
REACTOR RESERVE SHUTDOWN HOURS
- 7.
HOURS GENERATOR ON LINE
- 8.
UNIT RESERVE SHUTDOWN HOURS
- 9.
GROSS THERMAL ENERGY GENERATED (MWH)
- 10.
NET ELECTRICAL ENERGY GENERATED (MWWH)
- 11.
REACTOR SERVICE FACTOR (as)
- 12.
REACTOR AVAILABILITY FACTOR (%)
- 13.
UNIT SERVICE FACTOR (%)
- 14.
UNIT AVAILABILITY FACTOR (as)
- 15.
UNIT CAPACITY FACTOR - Using MDC (%)
- 16.
UNIT CAPACITY FACTOR - Using DER (as)
- 17.
UNIT FORCED OUTAGE RATE (as)
THIS MONTH 744.0 0
744.0 0
2,838,565 930.259 100.0 100.0 100.0 100.0 100.0 100.0 0.0 YR TO DATE 4.217.7 0
4.184.1 0
15.778.287 5,210,779 72.3 72.3 71.8 71.8 71.5 71.5 28.2 CUMULATIVE 98.775.4 0
96.476.5 0
360,.191938 117.388.746 79.3 79.3 77.5 77.5 75.4 75.4 14.3
- 18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
- 19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.
50499 UNIT 2
DATE Sept. 9. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2
3 4
5 6
7 8
9 10 11 12 13 14 1243 1243 1245 1232 1234 1247 1249 1234 1237 1256 1255 1237 1251 1259 1260 1253 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1257 1256 1254 1255 1256 1258 1257 1256 1252 1253 1254 1254 1254 1255 1257 15 16
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-499 UNIT 2
DATE Sept. 9. 2003 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH AUGUST I
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)
Shutting Event Code Code Down Report #
Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD Il__
I I
I I
I I
I 1
F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4
EEE 805-1983 5
PORVS AND SAFETY VALVE
SUMMARY
There were no PORV or Safety Valves challenged during the reporting period.