w-1 S1-4 BND rO UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA. GEORGIA 30303-8960 September 2, 2003

,-/0-1/0-':3 Rules Review and Directives Branch U.S. Nuclear Regulatory Commission (ereya'l .

-J I

I I

Mail Stop T6-D59 Wasbington, D.C. 20555-0001 11" / ,. I -_

A_}

RE: EPA Review and Comments on co Draft Generic Supplemental Environmental Impact Statement (DGSEIS)

License Renewal of Nudlear Plants, Supplement 15 Regarding Virgil C. Summer Nudlear Station CEQ No. 030322

Dear Sir:

EPA Region 4 reviewed the Draft Generic Supplemental EIS (DGSEIS) pursuant to Section 309 of the Clean Air Act and Section 102 (2)(C) of the National Environmental Policy Act (NEPA). The purpose of this letter is to provide the Nuclear Regulatory Commission (NRC) with EPA's comments regarding potential impacts of the proposed renewal of the Virgil C.

Summer Nuclear Station Operating License (OL).

South Carolina Electric and Gas Company submitted an application to renew the Operating License (OL) for the V.C. Summer Nuclear Station for an additional 20 years. The proposed action, (license renewal), would provide for continued operation and maintenance of existing facilities and transmission lines.

Based on the review of the DGSEIS, the project received a rating of '"EC-1," meaning that some environmental concerns exist regarding aspects of the proposed project. Specifically, protecting the environment involves the continuing need for appropriate storage, and ultimate disposition, of radioactive wastes generated on-site.

The DGSEIS acknowledges that OL renewal of the V.C. Summer Nuclear Station will require continuing radiological monitoring of all plant effluents. Continuing to appropriately store spent fuel assemblies and radioactive wastes on-site is required, in order to prevent impacts.

Ultimately, long-term radioactive waste disposition will require transportation of wastes to a permitted repository site. Further, the DGSEIS states that renewal of the OL would result in fewer environmental impacts than the feasible alternatives for generating power, and the NRC considers impacts of OL renewal to be small Overall, the impacts as defined in the DGSEIS appear to be within acceptable limits. --

Internet Address (URL)

  • http//www.epa.gov Recycled/Recyclable
  • Printed with Vegetable On Based Inks on Recycled Paper (Minimum 30% Postconsume)

Thank you for the opportunity to comrnt on this document. We look forward to reviewing the Final GSEIS. If we can be of further assistance, please contact Ranona McCoimey of my staff at (404) 562-9615.

Sincerely, Heinz J. Mueller, Chief Office of Environmental Assessment