September 16, 2003

Jeff S. Forbes, Vice President,

Operations - Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INITIAL LICENSED OPERATOR EXAMINATION 50-416/2004-301

Dear Mr. Forbes:

In a telephone conversation on September 9, 2003, between Messrs. T. O. McKernon and

M. Rash, Operations Training, arrangements were made for the administration of an initial

licensing examination at the Grand Gulf Nuclear Station during the weeks of February 2 and 9,

2004.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in Revision 8, Supplement 1 of NUREG-1021, "Operator Licensing Examination

Standards for Power Reactors." The NRC regional office will discuss with your staff any

changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 10, 2003. The written and operating examinations and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by December 8, 2003.

Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. Any delay in receiving the

required examination and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402. Appendix E of

NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the

written examination is being administered. Further, the NRC will conduct an examination

validation during the week of January 5, 2004.

To permit timely NRC review and evaluation, your staff should submit the preliminary license

application (Office of Management and Budget (OMB) approval number 3150-0090), medical

Entergy Operations, Inc.

-2-

certification (OMB approval number 3150-0024), and waiver request (OMB approval

number 3150-0090) at least 30 days before the first examination date (January 7, 2004). If the

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted no later than January 26, 2004.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0101, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. M. Rash has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Tom McKernon at (817) 860-8153, or me at

(817) 860-8159.

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-416

License: NPF-29

cc:

Senior Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Entergy Operations, Inc.

-3-

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, DC 20005-3502

Jay Barkley, Chief

Energy & Transportation Branch

Environmental Compliance and

Enforcement Division

Mississippi Department of

Environmental Quality

P.O. Box 10385

Jackson, Mississippi 39289-0385

President, District 1

Claiborne County Board of Supervisors

P.O. Box 339

Port Gibson, Mississippi 39150

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable Richard Ieyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

Jackson, Mississippi 39225

Dr. Brian W. Amy

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39215

Entergy Operations, Inc.

-4-

Robert W. Goff, Program Director

Division of Radiological Health

Mississippi Dept. of Health

P.O. Box 1700

Jackson, Mississippi 39215-1700

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Entergy Operations, Inc.

-5-

Electronic distribution by RIV:

Acting Regional Administrator (TPG)

DRP Director (ATH)

Acting DRS Director (GMG)

Senior Resident Inspector (TLH4)

Branch Chief, DRP/A (WDJ)

Senior Project Engineer, DRP/A (TRF)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS:  Yes

 No Initials: ______

 Publicly Available  Non-Publicly Available

 Sensitive

 Non-Sensitive

SOE:OB

C:OB

TOMcKernon/lmb

ATGody

/RA/

/RA/

9/15/03

9/15/03

OFFICIAL RECORD COPY