0I FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach. FL 34957 September 10, 2003 L-2003-228 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly ODeratinc Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Vice President St. Lucie Plant WJ/spt Attachments
-7, A
an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I September 4,2003 W. D. Mead, Jr.
(772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximum Dependable Capacity (Mwe-Net)_
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line_
-5. Unit Reserve Shutdown Hours_
- 6. Net Electrical Energy (MWH) 830 839 MONTH 744 744 0.0 638134
-YTD-5831 5831 0.0 5003822 CUMULATIVE 190615 188781.3 0.0 154599956
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit i September4,2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: August 2003 Unit I operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
'p 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I September 4,2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: August 2003 Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor3 Prevent Recurrence
__._X__ ~_[__tIopeatedatssenialy pwerorheetir month of Augus I
2 3
F Forced S Scheduled Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D0 Regulatoiy Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 Manual 2 - Manual Scram 3 - Automatic Scram 4-Continued
- 5. Load Reduction
- 9. Other (Explain)
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St Lucie Unit 2 September 4,2003 W. D. Mead, Jr.
(772) 467-7293 REPORTING PERIOD: August 2003
- 1. Design Electrical Rating (Mwe-Net)
- 2. Maximurn Dependable Capacity (Mwe-Net)_
- 3. Number of Hours Reactor Critical__
- 4. Number of Hours Generator On Lne_____
- 5. Unit Reserve Shutdown Hours_
- 6. Net Electrical Energy (MWH) 830 839 MONTH 744 744 0.0 632199
-YTD-4489.2 4384.45 0.0 3609232 CUMULATIVE 153247.8 151384.75 0.0 124767945
t *I
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St Lucie Unit 2 September 4,2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: August 2003 Unit 2 operated at essentially full power through the entire month of August.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 September 4, 2003 W. D. Mead, Jr.
(772) 467-7293 REPORT MONTH: August 2003
[ Number Date Typel Duration Reason2 Method of Cause & Corrective II I
(Hours)
Shutting Down Action to l_______
______ I Reactor3 Prevent Recurrence l
=
Unit 2 operated at essentially fun power for the entire month of August.
1 2
3 F Forced S Scheduled Reason A - Equipment Failure (Explain)
B. Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F. Administrative G - Operational Error (Explain)
H -Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continued 5-Load Reduction 9 - Other (Explain)