ML032541051

From kanterella
Jump to navigation Jump to search
Transmittal of EI-2.2, Emergency Staff Augmentation
ML032541051
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/03/2003
From:
Consumers Energy
To: Mcknight J
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML032541051 (7)


Text

.5; Date Entered: Sep 03,2003 TO:

USNRCIWASHINGTON JMCKNIGHT Copy Number::

145 TRANSMITAL NUMBER: -

PROCEDURE NUMBER: El-2.2 TITLE: EMERGENCY STAFF AUGMENTATION TRANSMITTAL: LISTED BELOW ARE NEW/REVISED PROCEDURES WHICH MUST BE IMMEDIATELY INSERTED INTO OR DISCARDED FROM YOUR PROCEDURE MANUAL.

Action Required Section or Description REMOVE AND DESTROY El-2.2, RI8, ENTIRE PROCEDURE REPLACE WITH El-2.2, R/9, ENTIRE PROCEDURE SIGN, DATE, AND RETURN THE ACKNOWLEDGEMENT FORM WITHIN 10 DAYS TO THE PALISADES PLANT DOCUMENT CONTROL SIGNATURE OR INITIALS DATE If applicable, REMOVE ALL travelers and marked up pages In front of this procedure.

A045

Procedure No El-2.2 Revision 9 Effective Date 9/3/03 PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURE TITLE: EMERGENCY STAFF AUGMENTATION Approved: NKBrott l

8/28/03 Procedure Sponsor Date New Procedure/Revision Summarv:

Specific Changes Revision 9 Step 5.4.2 - Changed the clock starting time for evaluating a test of the augmentation system by adding 4 minutes to the starting time for the Community Alert Network. This addition is to account for the time from a drill being declared to the start of the augmentation system.

PALISADES NUCLEAR PLANT Proc No El-2.2 EMERGENCY IMPLEMENTING PROCEDURE Revision 9 Page I TITLE: EMERGENCY STAFF AUGMENTATION Table of Contents 1.0 PERSONNEL RESPONSIBILITY 1

2.0 PURPOSE.............................................................................

1

3.0 REFERENCES

I 3.1 SOURCE DOCUMENTS.........

0........................................

3.2 REFERENCE DOCUMENTS.................................

1 4.0 INITIAL CONDITIONS ANDIOR REQUIREMENTS I

5.0 PROCEDURE............

2 5.1 INITIATION...............

.2

......... 2 5.2 PLANT SECURITY

........... 2 5.3 STAFF AUGMENTATION MAINTENANCE 3

5.4 TESTING RESULTS 3

6.0 ATTACHMENTS AND RECORD

..................... 4 6.1 ATTACHMENTS..

4.............

4 6.2 RECORDS 4

7.0 SPECIAL REVIEWS 4

PAUSADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURE Proc No EI-2.2 Revision 9 Page 1 of 4 TITLE: EMERGENCY STAFF AUGMENTATION USER ALERT INFORMATION USE PROCEDURE The activities covered by this procedure may be performed from memory.

1.0 1.1 1.2 2.0 3.0 3.1 3.1.1 3.2 3.2.1

-3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 4.0 PERSONNEL RESPONSIBILITY The Site Emergency Director (SED) shall initiate this procedure.

Plant Security personnel shall initiate the augmentation notification system.

PURPOSE To provide a method of staff augmentation that will ensure sufficient staffing under emergency conditions.

REFERENCES SOURCE DOCUMENTS Palisades Site Emergency Plan REFERENCE DOCUMENTS Emergency Augmentation Instruction Booklet Palisades Administrative Procedure 10.46, nPlant Recordsn Palisades Site Emergency Plan, Section 5, Figure 5-2 PPAC-SEP002, Testing of Augmentation System:

PPAC-SEP008, 'Staff Augmentation Update" Palisades Administrative Procedure 3.01, "Plant Review Committeeo INITIAL CONDITIONS ANDIOR REQUIREMENTS Staff augmentation and/or personnel accountability are mandatory actions at the Alert classification and above. These actions may be performed before an Alert is declared at the discretion of the SED.

PALISADES NUCLEAR PLANT Proc No El-2.2 EMERGENCY IMPLEMENTING PROCEDURE Revision 9 Page 2 of 4 TITLE: EMERGENCY STAFF AUGMENTATION 5.0 PROCEDURE USER ALERT INFORMATION USE PROCEDURE The activities covered by this procedure may be performed from memory.

5.1 INITIATION 5.1.1 Staff augmentation during the day shift on weekdays is initiated by sounding the emergency siren and performing personnel accountability.

5.1.2 On backshifts, weekends, and holidays, emergency response personnel are augmented by activating the augmentation notification system.

5.2 PLANT SECURITY NOTE:

The Control Room may call Security to initiate staff augmentation before the emergency siren is sounded.

5.2.1 On back shifts, weekends, and holidays, upon the sounding of the 2-minute emergency siren, a Security Shift Lieutenant should call the Control Room to verify that staff augmentation is to be initiated.

5.2.2 Staff augmentation is initiated by calling Community Alert Network (CAN), an offsite vendor who is responsible for activating the augmentation notification system used to call in the Emergency Response Organization (ERO).

5.2.3 Instructions for calling CAN are contained in the Emergency Augmentation Instruction Booklet located in the Security ID Station, Central Alarm Station (CAS),

and Secondary Alarm Station (SAS).

5.2.4 In the event that the augmentation notification system cannot be initiated by calling CAN, the Security Shift Lieutenant shall notify the Control Room, and begin a manual call in process by activating the Emergency Group Page, and calling in the ERO manually.

5.2.5 Instructions to activate the Emergency Group Page, and making manual telephone calls, are posted at the Security ID Station, CAS, SAS, Technical Support Center (TSC), and the Emergency Operations Facility (EOF).

PALISADES NUCLEAR PLANT Proc No EI-2.2 EMERGENCY IMPLEMENTING PROCEDURE Revision 9 Page 3 of 4 TITLE: EMERGENCY STAFF AUGMENTATION 5.3 STAFF AUGMENTATION MAINTENANCE NOTE:

PPAC-SEP008, Staff Augmentation Update," is to be used to document completion of Steps 5.3.1, 5.3.2, and 5.3.3.

5.3.1 Emergency Planning shall review the data base of the CAN augmentation notification system each month to ensure that ERO personnel are current in their emergency training.

5.3.2 At least quarterly, the augmentation system data base shall be reviewed to ensure

-that:

a.

The number of ERO personnel qualified for each emergency position is adequate.

b.

Telephone numbers of ERO personnel are correct.

5.3.3 At least quarterly, Emergency Planning should verify the completeness and accuracy of each Emergency Augmentation Instruction Booklet. Each verification i) should be documented by signing and dating the verification sign off sheet at the front of each booklet.

NOTE:

PPAC-SEP002, NTesting of Augmentation System," shall be used to document completion of semiannual augmentation tests.

5.3.4 The CAN emergency augmentation system shall be tested semiannually. Tests results shall be evaluated against the Site Emergency Plan, Figure 5-2, OPlant Staffing and Augmentation Guidelines." A memo shall be sent to the Site Director documenting the results of the test evaluation.

5.4 TESTING RESULTS 5.4.1 The Site Emergency Plan, Section 5, Figure 5-2 identifies position titles or expertise required to be augmented within approximately 30 minutes and 60 minutes.

5.4.2 For the purpose of evaluating results of semiannual augmentation tests, 0approximate response time" is defined as +/-25% of 30 minutes and 60 minutes.

The clock starting time will begin 4 minutes before the first call is made by CAN.

The 4 minutes will be added to the estimated time of arrival.

5.4.3 Results less than 100% successful in filling the total number of required positions, will be evaluated for corrective action(s), if needed. This evaluation will be included in the overall evaluation memo noted in Step 5.3.4 of this procedure.

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTING PROCEDURE Proc No EI-2.2 Revision 9 Page 4 of 4 TITLE: EMERGENCY STAFF AUGMENTATION 6.0 6.1 6.2 AT7ACHMENTS AND RECORD ATTACHMENTS None RECORDS Records generated by this procedure shall be filed in accordance with Palisades Administrative Procedure 10.46, "Plant Records."

SPECIAL REVIEWS The scope of this procedure does not include activities that require a 50.59 review.

However, the Palisades Site Emergency Plan does require that revisions to this procedure be reviewed and approved by the Plant Review Committee (PRC), in accordance with Palisades Administrative Procedure 3.01, "Plant Review Committee."

7.0