ML032520685

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Exelon Generation Company, LLC Re Presentation of Facts Surrounding 08/29/2003 Event Notification That Byron Station May Have Exceeded Its Licensed Thermal Power Limits
ML032520685
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/09/2003
From: Dave Hills
Division of Reactor Safety III
To:
References
Download: ML032520685 (3)


Text

September 9, 2003 NOTICE OF LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Exelon Generation Company, LLC Name of Facility: Byron Station, Units 1 and 2 Docket Nos: 50-454; 50-455 Date and Time of Meeting: Thursday, September 18, 2003 1:00 p.m. - 2:30 p.m.

Location of Meeting: U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting: Presentation of the facts surrounding the August 29, 2003, event notification that Byron Station may have exceeded its licensed thermal power limits.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

G. Grant, Director, Division of Reactor Projects, Region III C. Pederson, Director, Division of Reactor Safety S. Reynolds, Deputy Director, Division of Reactor Projects A. Stone, Chief, Reactor Projects Branch 1 D. Hills, Chief, Mechanical Engineering Branch Others as designated Licensee Attendees:

K. Ainger, Licensing Manager B. Grundmann, Regulatory Assurance Manager B. Adams, Engineering Manager W. Kouba, Corporate Engineering Director D. Hoots, Plant Manager Others as designated NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Patricia Lougheed at 630-829-9760 by COB September 16, 2003.

Approved by: /RA by Ann Marie Stone Acting For/

David Hills, Chief Mechanical Engineering Branch Division of Reactor Safety

Notice of Licensee Meeting Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR H. Nieh (HKN), Region III Coordinator, OEDO W. Ruland (WHR), Project Directorate, Division of Licensing and Project Management, NRR G. Dick, Project Manager, Project Directorate, Division of Licensing Project Management, NRR G. Grant (GEG), Director, Division of Reactor Projects, RIII S. Reynolds (SAR1), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII A. M. Stone, DRP Branch Chief R. Skokowski, SRI, Byron Station DRS Branch Chiefs (JFL, DEH)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA