September 16, 2003 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MC0721)
Dear Mr. Warner:
Inservice inspections (ISIs) of steam generator (SG) tubes play a vital role in ensuring that adequate structural integrity of the tubes is maintained. As required by the plants technical specifications, reporting requirements range from submitting a special report within 15 days following completion of each ISI of SG tubes, that identifies the number of tubes plugged and/or repaired, to submitting a special report within 12 months following completion of the inspection, that provides complete results of the SG tube ISI.
A phone conference will be arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Seabrook Station, Unit No. 1 refueling outage. We would like to have this phone conference after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. The preferable time would be when the SG inspection is approximately 70% complete. Enclosed is a list of discussion points to facilitate this phone conference. The staff plans to document a brief summary of the conference call, as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docker No. 50-443
Enclosure:
As stated cc w/encl: See next page
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Dan McElhinney Federal Emergency Management Agency Region I J.W. McCormack P.O. &
Courthouse Building, Room 401 Boston, MA 02109 Mr. Jack Devine Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 Mr. Stephen McGrail, Director ATTN: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Philip T. McLaughlin, Attorney General Steven M. Houran, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Donald Bliss, Director New Hampshire Office of Emergency Management State Office Park South 107 Pleasant Street Concord, NH 03301 Mr. Daniel G. Roy Nuclear Training Manager Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. Gene F. St. Pierre Station Director Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
September 16, 2003 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - UPCOMING STEAM GENERATOR TUBE INSERVICE INSPECTION (TAC NO. MC0721)
Dear Mr. Warner:
Inservice inspections (ISIs) of steam generator (SG) tubes play a vital role in ensuring that adequate structural integrity of the tubes is maintained. As required by the plants technical specifications, reporting requirements range from submitting a special report within 15 days following completion of each ISI of SG tubes, that identifies the number of tubes plugged and/or repaired, to submitting a special report within 12 months following completion of the inspection, that provides complete results of the SG tube ISI.
A phone conference will be arranged with members of your staff to discuss the ongoing results of the SG tube inspections to be conducted during the upcoming Seabrook Station, Unit No. 1 refueling outage. We would like to have this phone conference after the majority of the tubes have been inspected, but before the SG inspection activities have been completed. The preferable time would be when the SG inspection is approximately 70% complete. Enclosed is a list of discussion points to facilitate this phone conference. The staff plans to document a brief summary of the conference call, as well as any material that you may have provided to the staff in support of the call.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docker No. 50-443
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC J. Clifford V. Nerses LLund PDI-2 Reading ADAMS Accession Number: ML032480429
- See previous concurrence OFFICE PDI-2/PM PDI-2/LA EMCB/SC*
PDI-2/SC NAME VNerses CRaynor LLund JClifford DATE 9/16/03 9/16/03 9/12/03 9/16/03 OFFICIAL RECORD COPY
STEAM GENERATOR TUBE INSPECTION DISCUSSION POINTS PREPARED BY THE OFFICE OF NUCLEAR REACTOR REGULATION FPL ENERGY SEABROOK, LLC SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 The following discussion points have been prepared to facilitate the phone conference to be arranged with the North Atlantic Energy Service Corporation, the licensee, to discuss the results of the steam generator (SG) tube inspections to be conducted during the upcoming Seabrook Station, Unit No. 1 refueling outage. This phone conference will be scheduled to occur towards the end of the planned SG tube inspection interval, but before the unit exits its refueling outage.
The staff plans to document a brief summary of the conference call, as well as any material that you may have provided to the staff in support of the call.
1.
Discuss whether any primary to secondary leakage existed in this unit prior to shutdown.
2.
Discuss the results of secondary side pressure tests.
3.
For each SG, provide a description of areas examined, including the expansion criteria utilized and the type of probe used in each area. Also, be prepared to discuss your inspection of the tube within the tubesheet, particularly the portion of the tube below the expansion/transition region.
4.
Discuss any exceptions taken to the industry guidelines.
5.
Provide a summary of the number of indications identified to date of each degradation mode and SG tube location (e.g., tube support plate, top-of-tubesheet, etc.). Also provide information, such as voltages, and estimated depths and lengths of the most significant indications.
6.
Describe repair/plugging plans for the SG tubes that meet the repair/plugging criteria.
7.
Discuss the previous history of SG tube inspection results, including any "look backs" performed; specifically, for significant indications or indications where look backs are used in support of dispositioning (e.g., manufacturing burnish marks).
8.
Discuss, in general, new inspection findings (e.g., degradation mode or location of degradation new to this unit).
9.
Discuss your use or reliance on inspection probes (eddy current or ultrasonic) other than bobbin and typical rotating probes, if applicable.
10.
Describe in-situ pressure test plans and results, if applicable and available, including tube selection criteria.
11.
Describe tube pull plans and preliminary results, if applicable and available; including tube selection criteria.
12.
Discuss the assessment of tube integrity for the previous operating cycle (i.e., condition monitoring).
13.
Provide the schedule for SG-related activities during the remainder of the current outage.
14.
Discuss the following regarding loose parts:
what inspections are performed to detect loose parts a description of any loose parts detected and their location within the SG if the loose parts were removed from the SG indications of tube damage associated with the loose parts the source or nature of the loose parts if known